Jump to content

Comments related to the NV Running List Thread


Recommended Posts

And not a single mention of the Buffalo market, even though the local guys say we're supposed to have it by October...

 

Workers and equipment are mobilizing now in the Buffalo and Rochester markets.

 

Robert via Samsung Note II via Tapatalk

 

 

  • Like 1
Link to comment
Share on other sites

Workers and equipment are mobilizing now in the Buffalo and Rochester markets.

 

Robert via Samsung Note II via Tapatalk

 

I do hope so. The local guys did say our speeds down here in Chautauqua County would be better than Buffalo for much of the year...

Link to comment
Share on other sites

I just hope the weather breaks here soon, it has been cold for so long, no sign of spring yet, and i know from past experience that work gets completed much slower when its cold, im sure ten fold when ur on a tower 100 to 200 feet in the air. Once the weather warms up around here im sure things will move even faster!

Link to comment
Share on other sites

Utah is a later-round market. Certainly it will get NV, along with every other "native" Sprint market (the affiliates are a bit more up in the air), but "when" is not clear yet. There's no official word but pretty much every market should be well underway by end of 2013 and most will be underway sooner, including Utah.

 

On Utah specifically, another member has dug up some info on building permits in Salt Lake County that's available to sponsors at http://s4gru.com/index.php?/topic/3353-utah-nv-build-permit-map/ So while I can't really say what the member has found in exact terms, I will say that it is clear that Sprint's contractors are already active in the market doing some site work; that doesn't however mean that backhaul's in place or that new antennas are installed yet (it could be cabinets or electrical feed or any one of the other parts of the site upgrade that has to come together).

Link to comment
Share on other sites

Haven't been any sites accepted in west michigan in awhile, has your source been awol?

 

Sent from my SPH-L900 using Forum Runner

 

I just posted like 14 or so the other day. Where you've been? :P

 

Robert via Nexus 7 with Tapatalk HD

Link to comment
Share on other sites

Does anyone know what market Belleville or Collinsville Illinois (metro stl) would fall under? And what round it's in?

 

Missouri market. It's in the third round and is beginning now.

 

Robert via Nexus 7 with Tapatalk HD

Link to comment
Share on other sites

 

I just posted like 14 or so the other day. Where you've been? :P

 

Robert via Nexus 7 with Tapatalk HD

 

Must have completely missed it, I'll scan back

 

Sent from my SPH-L900 using Forum Runner

Link to comment
Share on other sites

And not a single mention of the Buffalo market, even though the local guys say we're supposed to have it by October...

 

Rumors (fairly reliable ones) have the NV rollout schedule for Buffalo pegged for the end of April. Hopefully by then we'll get an accurate assessment as to when it is actually going to take place. Most of the things that are being said peg the Buffalo market to be done by August, now there wasn't any real specification if it would be done by August or if it would've been done starting by August :P

  • Like 1
Link to comment
Share on other sites

Yeah, I figured it was something like that. If the local guys aren't spouting total BS (and all the complainers' observations pan out), they'll start down in the Southern Tier (which is good for me, since I live in Jamestown) and leave the City of Buffalo proper for last. If it's the other way around, then I'll be stuck in 2G land for a loooooooooooooooong time...

Link to comment
Share on other sites

 

Missouri market. It's in the third round and is beginning now.

 

Robert via Nexus 7 with Tapatalk HD

 

I have looked for Metro East sites. So far, nothing yet. If I do see sites in progress I will let everyone know.

Link to comment
Share on other sites

Utah is a later-round market. Certainly it will get NV, along with every other "native" Sprint market (the affiliates are a bit more up in the air), but "when" is not clear yet. There's no official word but pretty much every market should be well underway by end of 2013 and most will be underway sooner, including Utah.

 

On Utah specifically, another member has dug up some info on building permits in Salt Lake County that's available to sponsors at http://s4gru.com/index.php?/topic/3353-utah-nv-build-permit-map/ So while I can't really say what the member has found in exact terms, I will say that it is clear that Sprint's contractors are already active in the market doing some site work; that doesn't however mean that backhaul's in place or that new antennas are installed yet (it could be cabinets or electrical feed or any one of the other parts of the site upgrade that has to come together).

Thanks for the info. I'm trying to be patient with this 3G but at speeds of 100kbps or slower at peak times it gets harder and harder.. Lol

Link to comment
Share on other sites

So I might be attending college in Moorhead, Minnesota within a few years, and I'm planning on switching to Sprint so I was wondering when the Dakotas Market would start. I found an article mentioning the Dakotas market was next to the Minnesota market, but after that, I can't find anything mentioning the Dakotas? Estimated start time??

Link to comment
Share on other sites

So I might be attending college in Moorhead, Minnesota within a few years, and I'm planning on switching to Sprint so I was wondering when the Dakotas Market would start. I found an article mentioning the Dakotas market was next to the Minnesota market, but after that, I can't find anything mentioning the Dakotas? Estimated start time??

Considering that network vision will be pretty close to done by the end of this year will a little work going into 2014, U will have no problems having lte, voice on 800 and lte 800 by the time u goto school up in moorhead,mn. Dakotas are a third round market and will be starting soon, it is a small market. So it won't take long once it starts
Link to comment
Share on other sites

Considering that network vision will be pretty close to done by the end of this year will a little work going into 2014, U will have no problems having lte, voice on 800 and lte 800 by the time u goto school up in moorhead,mn. Dakotas are a third round market and will be starting soon, it is a small market. So it won't take long once it starts

 

Not quite sure where Moorhead, MN is, but if you are within 100Miles of the Canadian border, then don't count on any SMR services until the FCC and Canadian equivalent come to an agreement on interference.

Link to comment
Share on other sites

Not quite sure where Moorhead, MN is, but if you are within 100Miles of the Canadian border, then don't count on any SMR services until the FCC and Canadian equivalent come to an agreement on interference.

 

It's right across the river from Fargo, ND. It's about 200 miles from Canada I believe

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • Since this is kind of the general chat thread, I have to share this humorous story (at least it is to me): Since around February/March of this year, my S22U has been an absolute pain to charge. USB-C cables would immediately fall out and it progressively got worse and worse until it often took me a number of minutes to get the angle of the cable juuuussst right to get charging to occur at all (not exaggerating). The connection was so weak that even walking heavily could cause the cable to disconnect. I tried cleaning out the port with a stable, a paperclip, etc. Some dust/lint/dirt came out but the connection didn't improve one bit. Needless to say, this was a MONSTER headache and had me hating this phone. I just didn't have the finances right now for a replacement.  Which brings us to the night before last. I am angry as hell because I had spent five minutes trying to get this phone to charge and failed. I am looking in the port and I notice it doesn't look right. The walls look rough and, using a staple, the back and walls feel REALLY rough and very hard. I get some lint/dust out with the staple and it improves charging in the sense I can get it to charge but it doesn't remove any of the hard stuff. It's late and it's charging, so that's enough for now. I decide it's time to see if that hard stuff is part of the connector or not. More aggressive methods are needed! I work in a biochem lab and we have a lot of different sizes of disposable needles available. So, yesterday morning, while in the lab I grab a few different sizes of needles between 26AWG and 31 AWG. When I got home, I got to work and start probing the connector with the 26 AWG and 31 AWG needle. The stuff feels extremely hard, almost like it was part of the connector, but a bit does break off. Under examination of the bit, it's almost sandy with dust/lint embedded in it. It's not part of the connector but instead some sort of rock-hard crap! That's when I remember that I had done some rock hounding at the end of last year and in January. This involved lots of digging in very sandy/dusty soils; soils which bare more than a passing resemblance to the crap in the connector. We have our answer, this debris is basically compacted/cemented rock dust. Over time, moisture in the area combined with the compression from inserting the USB-C connector had turned it into cement. I start going nuts chiseling away at it with the 26 AWG needle. After about 5-10 minutes of constant chiseling and scraping with the 26AWG and 31AWG needles, I see the first signs of metal at the back of the connector. So it is metal around the outsides! Another 5 minutes of work and I have scraped away pretty much all of the crap in the connector. A few finishing passes with the 31AWG needle, a blast of compressed air, and it is time to see if this helped any. I plug my regular USB-C cable and holy crap it clicks into place; it hasn't done that since February! I pick up the phone and the cable has actually latched! The connector works pretty much like it did over a year ago, it's almost like having a brand new phone!
    • That's odd, they are usually almost lock step with TMO. I forgot to mention this also includes the September Security Update.
    • 417.55 MB September security update just downloaded here for S24+ unlocked   Edit:  after Sept security update install, checked and found a 13MB GP System update as well.  Still showing August 1st there however. 
    • T-Mobile is selling the rest of the 3.45GHz spectrum to Columbia Capital.  
    • Still nothing for my AT&T and Visible phones.
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...