Current Totals from 5/28/13 - 8/13/15

254 new sites
170 iDEN conversions

231 USCC conversions

8 Clearwire WiMAX conversions

0 Cellular One conversions
44 new DAS sites

2 new Pico Cell sites

1 new Small Cell site

1 new COW
0 Clearwire WiMAX B41 only conversions

31 deactivations


For a net total of 680 new sites.
 

  • Like 14
Link to comment
Share on other sites

I have 77 USCC Conversions and 136 iDEN Conversions in our database.  Not all have been noted in the Market Acceptance thread, as I have had to go back and change a few that I later found out were USCC Conversions after the fact.  Not actually new sites as I originally thought.

  • Like 4
Link to comment
Share on other sites

What states were the USCC conversions?  Illinois and Missouri?  Did Sprint assign them a special two digit ID number like they did with the Qwest acquired sites (which had '63' in the cascade ID #'s) about 12 years ago?

Link to comment
Share on other sites

What states were the USCC conversions? Illinois and Missouri? Did Sprint assign them a special two digit ID number like they did with the Qwest acquired sites (which had '63' in the cascade ID #'s) about 12 years ago?

Don't know. Haven't seen the actual Cascade IDs for them yet. We have been assigning them temp numbers with US in place of XC.
Link to comment
Share on other sites

  • 2 weeks later...

I updated the totals through the last acceptance report.

 

At this rate it looks like project ocean could potentially be done before the summer gets here.

  • Like 7
Link to comment
Share on other sites

  • 2 weeks later...

Is there a map of these site locations?

 

Unfortunately there is not a specific map of these locations. They are on the main map, you just need to find them (needle in a haystack). Whenever Robert provides updates that is the easiest time to locate them. Just look on the recent changes map.

Link to comment
Share on other sites

93 USCC conversions noted by cdk. 77 noted by Robert.

 

Anyone know where the difference comes from?

 

Robert had 77 as of mid March (at the time my numbers where not matching). Since then there have been additional acceptances and that number is reflected in the 93.

  • Like 1
Link to comment
Share on other sites

Robert had 77 as of mid March (at the time my numbers where not matching). Since then there have been additional acceptances and that number is reflected in the 93.

Thanks for the clarification. There are still some in the Central IL and Chicago markets that do not have acceptances of any kind yet... wonder if the 100 count will be eclipsed... :)

Link to comment
Share on other sites

  • 3 weeks later...

Totals are updated through 5/3.

 

Just some thoughts and notes. USCC conversions are continuing (15). How many more will we see? iDEN conversions(10) are impressive this update, this might be a near record on a number of sites converted over a fixed time period. One of them was even in Shentel territory. There have been nearly 50% more iDEN conversions than original planned under NV 1.0. Just thinking out loud, these conversions are outside those Nextel site conversions that are hopefully to be funded starting soon. Finally, we have the first Clearwire WiMAX conversion!!!

  • Like 4
Link to comment
Share on other sites

I think we are now starting to get into the iDEN sites noted in the Expansion project. The original iDEN conversion project has to be over or wrapping up.

 

As for USCC Conversions (Project Ocean), I think we will see a few dozen more. I hope to see Project Cedar first acceptances in the next few months too. We have had an iDEN Conversion in Shentel before. But they are rare and noteworthy. The WiMax conversion is on the roof of the Westin hotel off Flamingo Road in Las Vegas.

 

Using Moto X² on Tapatalk

  • Like 5
Link to comment
Share on other sites

I think we are now starting to get into the iDEN sites noted in the Expansion project. The original iDEN conversion project has to be over or wrapping up.

 

That certainly could be the case. As I commented earlier it seems like a fairly large number since the last update, but not that far out from normal. Maybe we will learn more tomorrow.

 

We have had an iDEN Conversion in Shentel before. But they are rare and noteworthy.

 

I couldn't recall if we had before. There are certainly a few iDEN sites within Shentel's boundaries that would fill in a few non served areas, but I haven't looked closely enough to see if there are a lot of site would serve to densify that market.

 

 

As for USCC Conversions (Project Ocean), I think we will see a few dozen more. I hope to see Project Cedar first acceptances in the next few months too.

 

Unless I missed it the number of sites for Project Ocean seemed vague. Project Cedar's numbers looked more concrete. I should probably add a separate line for them. Hopefully they start rolling in soon.

 

 

The WiMax conversion is on the roof of the Westin hotel off Flamingo Road in Las Vegas.

 

Using Moto X² on Tapatalk

 

I was wondering after looking at the map. I was surprised how close it was to the nearby site.

Link to comment
Share on other sites

I am not sure if it is Saw's handiwork when it comes to site selection yet, but I have been impressed by the choice of sites being added or converted. In the markets I follow closely they have hit several of the ones I have noted as good candidates, and in the others they seem to fit well after seeing them on the map.  

Link to comment
Share on other sites

I looked at the Shentel region in MD, WV, and VA this morning, and I didn't see many remaining Nextel towers that would really add much to Shentel's coverage in the area.  Maybe 2 or 3 tops.  Shentel just has so many towers in the region that it is either on the same tower that Nextel used to be on or on a different one within a stone's throw in almost every case.

 

- Trip

  • Like 2
Link to comment
Share on other sites

I looked at the Shentel region in MD, WV, and VA this morning, and I didn't see many remaining Nextel towers that would really add much to Shentel's coverage in the area.  Maybe 2 or 3 tops.  Shentel just has so many towers in the region that it is either on the same tower that Nextel used to be on or on a different one within a stone's throw in almost every case.

 

- Trip

 

I would hope they convert the 2 sites near Huntingdon, PA. Beyond that there aren't many more...

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • I assume that any agreement is not perpetual and has an end date. - Trip
    • I think it is likely that T-Mobile will be forced to honor any existing US cellular roaming agreements in those areas as a condition of them taking over the spectrum.  In that case, there would be no improvement of service unless T-Mobile improves the service offering in those areas.
    • My understanding is the MNO carriers are the one who have objected to the use of cell phones in commercial planes.  I understand that it ties down too many cell phones at once, thus I can not see this changing. However this depends on how it is structured. Use of a different plmn for satellite service might make it possible for planes only to connect with satellite. Private pilots have been using cellphones in planes for many decades. Far fewer phones at a lower altitude.
    • On Reddit, someone asked (skeptically) if the US Cellular buyout would result in better service.  I'd been pondering this very issue, and decided to cross-post my response here: I've been pondering the question in the title and I've come to the conclusion that the answer is that it's possible. Hear me out. Unlike some of the small carriers that work exclusively with one larger carrier, all three major carriers roam on US Cellular today in at least some areas, so far as I know. If that network ceases to exist, then the carriers would presumably want to recover those areas of lost service by building out natively. Thus, people in those areas who may only have service from US Cellular or from US Cellular and one other may gain competition from other carriers backfilling that loss. How likely is it? I'm not sure. But it's definitely feasible. Most notably, AT&T did their big roaming deal with US Cellular in support of FirstNet in places where they lacked native coverage. They can't just lose a huge chunk of coverage whole still making FirstNet happy; I suspect they'll have to build out and recover at least some of that area, if not most of it. So it'd be indirect, but I could imagine it. - Trip
    • Historically, T-Mobile has been the only carrier contracting with Crown Castle Solutions, at least in Brooklyn. I did a quick count of the ~35 nodes currently marked as "installed" and everything mapped appears to be T-Mobile. However, they have a macro sector pointed directly at this site and seem to continue relying on the older-style DAS nodes. Additionally, there's another Crown Castle Solutions node approved for construction just around the corner, well within range of their macro. I wouldn’t be surprised to see Verizon using a new vendor for their mmWave build, especially since the macro site directly behind this node lacks mmWave/CBRS deployment (limited to LTE plus C-Band). However, opting for a multi-carrier solution here seems unlikely unless another carrier has actually joined the build. This node is equidistant (about five blocks) between two AT&T macro sites, and there are no oDAS nodes deployed nearby. Although I'm not currently mapping AT&T, based on CellMapper, it appears to be right on cell edge for both sites. Regardless, it appears that whoever is deploying is planning for a significant build. There are eight Crown Castle Solutions nodes approved for construction in a 12-block by 2-block area.
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...