WiMax decommissioning planned?
-
Similar Content
-
Posts
-
Here's the ULS application. https://wireless2.fcc.gov/UlsApp/ApplicationSearch/applMain.jsp?applID=14869446 It was cited way at the bottom of the 240+ page document. - Trip
-
Here's at least one merger document. It tells quite a story of US Cellular's struggles so far. (I'm not very far into it yet.) https://www.fcc.gov/ecfs/document/109132166915081/11 - Trip
-
By PythonFanPA · Posted
Checked and found a pending 19MB GP System update on the S24+ unlocked. Still Aug 1st after install. -
By PedroDaGr8 · Posted
Believe I came across a new TMO co-lo in the Paradise Valley/Echo Lake area (eNB 380789, gNB 1877976). Per this permit, TMO is co-locating on a tower there: Permit Details - MyBuildingPermit This likely will replace the nearby eNB 97245 which was never upgraded. -
By PedroDaGr8 · Posted
Thanks for sharing the details that you CAN share.
-
-
Recently Browsing
- No registered users viewing this page.
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.