1x800 just started showing up in Indianola. Signal in my house is usually 1-2 bars, now have one short of full bars, wow.

 

yep, guess i forgot to post that here, i had put it in the sponsor thread. there are 2 towers in indianola that are 1x800 live and another by carlisle :)

  • Like 1
Link to comment
Share on other sites

was able to hit some sites over the past few days, seems like things are picking back up. we had a ton of towers getting done for a few weeks there and then nothing for a few weeks and now they are back at it :)

 

this was a GMO site i saw workers at back in may but never confirmed they installed anything. went by and got a pic of the GPS antenna so BTS is installed (its a sprint/nextel/verizon site)

IMG_5975.jpg

IMG_5977.jpg

 

this site is in the middle of grimes, i checked it on 09/15 and there was nothing installed or even sitting waiting at the site yet, went back by on 09/20 and literally everything is installed now  :blink:

IMG_5978.jpg

IMG_5980.jpg

IMG_5979.jpg

 

this site covers the fair grounds and now has the honor of being our first (and only?) high capacity site

IMG_5981.jpg

 

this one is south of the 4G accepted site on 14th st, no panels/RRUs yet as they will have to modify the site to support them, but the BTS was installed.

IMAG0437.jpg

 

also drove by a few other sites but no work was going on. updated the no-work dates and added all of these to our spreadsheet and maps :)

  • Like 1
Link to comment
Share on other sites

Hello, I have been trolling here and following this thread and you guys are doing a great job!  So far I have not hit any 4G yet in the Des Moines area.  I live in Ankeny and just in general I have been having tons of trouble in the last week.  Undelivered texts, and since I got a new phone Friday I seem to pick up 1x in Ankeny a lot.  I talked to Sprint and they blamed it on the current upgrades to infrastructure.  I was wondering if others have experienced similar issues?  They told me to hold on until the end of October.  I got so frustrated this weekend I almost thought about taking the phone back and swapping, but I feel I have rode out Sprint this long and they are almost over the hump.

  • Like 1
Link to comment
Share on other sites

Perhaps it's just congestion, but is anyone who is near Downtown DSM having data problems?

 

since its downtown its probably congestion. i know 1 tower downtown has had the new equipment installed but the other ones are in locations that its been hard to check on. usually actually installing the equipment shouldn't have an effect on anything though. its when they come back to fire up the new equipment and do testing and stuff that you see the most issues.

Link to comment
Share on other sites

Hello, I have been trolling here and following this thread and you guys are doing a great job!  So far I have not hit any 4G yet in the Des Moines area.  I live in Ankeny and just in general I have been having tons of trouble in the last week.  Undelivered texts, and since I got a new phone Friday I seem to pick up 1x in Ankeny a lot.  I talked to Sprint and they blamed it on the current upgrades to infrastructure.  I was wondering if others have experienced similar issues?  They told me to hold on until the end of October.  I got so frustrated this weekend I almost thought about taking the phone back and swapping, but I feel I have rode out Sprint this long and they are almost over the hump.

 

welcome to the site! if you really want to see a ton more info consider becoming a sponsor, we have a thread in the sponsor section with a spreadsheet and maps of the IA and NE markets that we are using to track the upgrades and figuring out what towers are live and what not :)

 

the past few weeks have flared up for texting, calls, and data issues. they are actively installing the new equipment everywhere right now (the tower behind the sprint store in ankeny got new panels last week!) there is currently 1 4G tower in des moines and in the central iowa market there are 4 total. we are over half of the towers in central iowa either having been accepted or have equipment installed and in progress so they are making headway.

 

based on what i've seen so far end of october will be pushing it for being 100% done. i would hope that we will have more 4G accepted towers in the des moines area by then but the central iowa market as a whole i would think end of december would be more accurate for being 100% done.

 

so while it does suck now being that it is so close to being done i would stick it out for a little while longer anyway :)

 

also you put your phone number in the "phone" spot on your profile, might want to change that unless you want lots of random people calling you :)

  • Like 1
Link to comment
Share on other sites

welcome to the site! if you really want to see a ton more info consider becoming a sponsor, we have a thread in the sponsor section with a spreadsheet and maps of the IA and NE markets that we are using to track the upgrades and figuring out what towers are live and what not :)

 

the past few weeks have flared up for texting, calls, and data issues. they are actively installing the new equipment everywhere right now (the tower behind the sprint store in ankeny got new panels last week!) there is currently 1 4G tower in des moines and in the central iowa market there are 4 total. we are over half of the towers in central iowa either having been accepted or have equipment installed and in progress so they are making headway.

 

based on what i've seen so far end of october will be pushing it for being 100% done. i would hope that we will have more 4G accepted towers in the des moines area by then but the central iowa market as a whole i would think end of december would be more accurate for being 100% done.

 

so while it does suck now being that it is so close to being done i would stick it out for a little while longer anyway :)

 

also you put your phone number in the "phone" spot on your profile, might want to change that unless you want lots of random people calling you :)

Thanks, I noticed that right after I posted.  My Auto-Fill must have put it in there.  I agree with you.  I think I am going to just stick it out.  Just reached my breaking point this weekend it seemed.  I never noticed on my Droid as much about when I did/didn't have 3G, but now on the iPhone is distinctly labels them and when I see 1x it makes me cringe.  Especially when I am in the middle of what their map shows as 3G service.

Link to comment
Share on other sites

I love those pictures with the workers on the towers! It's hard to get a sense of the scale of the Network Vision panels and RRUs from a lot of the pictures. Seeing the size of them really underscores the huge undertaking the entire Network Vision project is!

  • Like 1
Link to comment
Share on other sites

The good news is that they probably won't delay it due to snow/winter. On the t1/T3 side once the ground freezes you can forget about it until spring. It's a matter of contractor availability. I called sprint over the weekend and the rep volunteered that LTE was available soon.

Link to comment
Share on other sites

Booooooooooooooo!!!  I wish they'd say "we are turning them on tomorrow!"  I hope by Christmas it's up!

 

not saying it won't happen in 3 months, but 3 months seems to be the default customer service response for all inquiries related to NV.

 

and in our case with about 35% of the towers not having had anything installed or accepted yet 3 months would actually be a good guess.

Link to comment
Share on other sites

not saying it won't happen in 3 months, but 3 months seems to be the default customer service response for all inquiries related to NV.

 

and in our case with about 35% of the towers not having had anything installed or accepted yet 3 months would actually be a good guess.

 

When you get an answer like that, it generally means you got an answer from someone with access to the schedule. Sites are only marked on the schedule in three month intervals. Either <90 days, 90-180 days, or 180+ days. What this means is that most sites in the area are scheduled to be at least upgraded in the next 90 days. Whether or not backhaul is in place for them to activate LTE is another matter. 

Link to comment
Share on other sites

Other than the one south side tower I don't see some being turned on every week....

 

check the sponsor shreadsheet, there is a stats tab, about 1/3 of the towers have already been at least 3G accepted, 1/3rd are in progress and have equipment installed, and 1/3 either haven't started or we don't know their state yet. did you see the acceptance reports? 12 towers accepted in central iowa in the past week. 

Link to comment
Share on other sites

not saying it won't happen in 3 months, but 3 months seems to be the default customer service response for all inquiries related to NV.

 

and in our case with about 35% of the towers not having had anything installed or accepted yet 3 months would actually be a good guess.

I'm not optimistic but I'm excited.
  • Like 1
Link to comment
Share on other sites

check the sponsor shreadsheet, there is a stats tab, about 1/3 of the towers have already been at least 3G accepted, 1/3rd are in progress and have equipment installed, and 1/3 either haven't started or we don't know their state yet. did you see the acceptance reports? 12 towers accepted in central iowa in the past week.

I gotta check out that spreadsheet. I need a checklist!!!
  • Like 1
Link to comment
Share on other sites

I love those pictures with the workers on the towers! It's hard to get a sense of the scale of the Network Vision panels and RRUs from a lot of the pictures. Seeing the size of them really underscores the huge undertaking the entire Network Vision project is!

 

Have a few trophy ones myself...  miss taking pictures like this!

 

My favorite site...aka "Gangsta' lean"  yes, the RRUs and rack is leaning.  It's gotten worse since they took down legacy.  And to top it all off the mixed up the sectors so it drops calls going in and out of the site coverage.  The north sector LTE coverage has diminished over the months to like half a mile.  Try explaining this to a Sprint rep.

 

 

NL03ME029_20130425A.JPG

 

 

NL03ME022_20121120_WORK1_C.JPG

 

NL03ME017_INSTALL.JPG

  • Like 1
Link to comment
Share on other sites

I was on my way to newton and had the 800 service. From Colfax all the way to newton and back. Towers in Colfax, Kellogg an newton had the 800. I got one screenshot showing it.

 

yep, 1x800 is awesome! i connected to the tower in your screenshot there south of huxley on hwy 69. the furthest i've connected to 1x800 is ~60 miles :D

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • Since this is kind of the general chat thread, I have to share this humorous story (at least it is to me): Since around February/March of this year, my S22U has been an absolute pain to charge. USB-C cables would immediately fall out and it progressively got worse and worse until it often took me a number of minutes to get the angle of the cable juuuussst right to get charging to occur at all (not exaggerating). The connection was so weak that even walking heavily could cause the cable to disconnect. I tried cleaning out the port with a stable, a paperclip, etc. Some dust/lint/dirt came out but the connection didn't improve one bit. Needless to say, this was a MONSTER headache and had me hating this phone. I just didn't have the finances right now for a replacement.  Which brings us to the night before last. I am angry as hell because I had spent five minutes trying to get this phone to charge and failed. I am looking in the port and I notice it doesn't look right. The walls look rough and, using a staple, the back and walls feel REALLY rough and very hard. I get some lint/dust out with the staple and it improves charging in the sense I can get it to charge but it doesn't remove any of the hard stuff. It's late and it's charging, so that's enough for now. I decide it's time to see if that hard stuff is part of the connector or not. More aggressive methods are needed! I work in a biochem lab and we have a lot of different sizes of disposable needles available. So, yesterday morning, while in the lab I grab a few different sizes of needles between 26AWG and 31 AWG. When I got home, I got to work and start probing the connector with the 26 AWG and 31 AWG needle. The stuff feels extremely hard, almost like it was part of the connector, but a bit does break off. Under examination of the bit, it's almost sandy with dust/lint embedded in it. It's not part of the connector but instead some sort of rock-hard crap! That's when I remember that I had done some rock hounding at the end of last year and in January. This involved lots of digging in very sandy/dusty soils; soils which bare more than a passing resemblance to the crap in the connector. We have our answer, this debris is basically compacted/cemented rock dust. Over time, moisture in the area combined with the compression from inserting the USB-C connector had turned it into cement. I start going nuts chiseling away at it with the 26 AWG needle. After about 5-10 minutes of constant chiseling and scraping with the 26AWG and 31AWG needles, I see the first signs of metal at the back of the connector. So it is metal around the outsides! Another 5 minutes of work and I have scraped away pretty much all of the crap in the connector. A few finishing passes with the 31AWG needle, a blast of compressed air, and it is time to see if this helped any. I plug my regular USB-C cable and holy crap it clicks into place; it hasn't done that since February! I pick up the phone and the cable has actually latched! The connector works pretty much like it did over a year ago, it's almost like having a brand new phone!
    • That's odd, they are usually almost lock step with TMO. I forgot to mention this also includes the September Security Update.
    • 417.55 MB September security update just downloaded here for S24+ unlocked   Edit:  after Sept security update install, checked and found a 13MB GP System update as well.  Still showing August 1st there however. 
    • T-Mobile is selling the rest of the 3.45GHz spectrum to Columbia Capital.  