Jump to content

now network upgrades are going until 2014?


Recommended Posts

I believe Virgin Mobile's old coverage map( before they switched to the interactive map) said they covered around 280 million people, so this sounds like their plans include some expansion, but that could be just the number they get with 800mhz added to towers.

 

ATT is suppose to have 300 million people with LTE by 2014 as well, so Sprint could match ATT's LTE coverage. This would definitely be great news for consumers who are looking for a better alternative to the duopoly.

Link to comment
Share on other sites

In his cutomer

www.phonearena.com/news/Sprint-gives-us-its-State-of-the-network-report_id37941

 

Says they be covering 250 mill ppl by the end of 2013 and 300mill in 2014. I wonder how many ppl they actually cover right now.

 

In the Sprint newsletter, Hesse says:

 

"We expect the build out to be largely complete by the end of 2013, bringing you improved coverage, greater capacity and faster data speeds."

Link to comment
Share on other sites

In regard to the title of this thread, finishing in 2014 has always been the plan. In fact, when network vision was originally conceived, sprint predicted it would not finish until 2015. They accelerated those completion estimates when the other carriers started announcing their 4g plans and sprint saw ways to secure funding to pay for an accelerated schedule. The current projection has always had them finishing in 2014.

 

 

Link to comment
Share on other sites

Expect nearly full coverage in most Top 100 cities by the end of 2013. Also, they will have some coverage available in all 97 markets by the end of 2013. The first two quarters of 2014 will be about adding density and picking up errant uncompleted towers.

 

Robert via Samsung Note II via Tapatalk

 

 

  • Like 7
Link to comment
Share on other sites

Sounds good. I also was under the impression that they would be done by the end of 2013. This makes me wonder how long it will take for them to put 800 CDMA and 800 LTE in place. I assume 800 advanced will go on every tower possible and 800 LTE goes on 80% of towers. According to Robert all they have to do is plug in a device and do a bit of testing to get it up in running but how long will it take for them to do all 38,000 towers again. I'm thinking this would add another quarter to the NV completion schedule.

Link to comment
Share on other sites

Sounds good. I also was under the impression that they would be done by the end of 2013. This makes me wonder how long it will take for them to put 800 CDMA and 800 LTE in place. I assume 800 advanced will go on every tower possible and 800 LTE goes on 80% of towers. According to Robert all they have to do is plug in a device and do a bit of testing to get it up in running but how long will it take for them to do all 38,000 towers again. I'm thinking this would add another quarter to the NV completion schedule.

 

800 LTE is Network Vision 2.0 It is not part of the original Network Vision project, but will take less time to build out than this implementation. I'm hoping that by the end of 2014 they will be close to being done with NV 2.0

  • Like 2
Link to comment
Share on other sites

Says they be covering 250 mill ppl by the end of 2013 and 300mill in 2014. I wonder how many ppl they actually cover right now.

 

I wish Sprint would use square miles instead of people, as people move around, home and work and inbetween, doesn't make sense. If I'm not covered at home, at work (unless I stand on the roof), am I covered? I wouldn't count it.

Square miles should be used. :)

Link to comment
Share on other sites

800 LTE is Network Vision 2.0 It is not part of the original Network Vision project, but will take less time to build out than this implementation. I'm hoping that by the end of 2014 they will be close to being done with NV 2.0

 

What all does NV 2.0 involves? I'm going to guess 2500 LTE goes along with NV 2.0

Link to comment
Share on other sites

I don't expect LTE in middle Georgia until late 2014 at best. Too rural, not enough subs to make the difference.

 

My contacts at Windstream and Cox say they are taking fiber to Sprint sites now, but it's going to take them a while. It took 4 months to get fiber into my data center... so they're having to plow in new stuff to many sites.

Link to comment
Share on other sites

I don't expect LTE in middle Georgia until late 2014 at best. Too rural, not enough subs to make the difference.

 

My contacts at Windstream and Cox say they are taking fiber to Sprint sites now, but it's going to take them a while. It took 4 months to get fiber into my data center... so they're having to plow in new stuff to many sites.

 

If your expectation is late 2014, then you will be pleased. Because they will beat that by a country mile. The Georgia market is already under deployment.

 

Robert via Nexus 4 using Tapatalk 2

 

 

  • Like 1
Link to comment
Share on other sites

If your expectation is late 2014, then you will be pleased. Because they will beat that by a country mile. The Georgia market is already under deployment.

 

Robert via Nexus 4 using Tapatalk 2

 

I will admit this... there are some new panels on the ground at a site in Warner Robins, GA, that I pass daily. I'll try to take a minute and stop to get photos of them.

 

However, fiber deployment is a problem, based on talks with the folks who are doing it. It'll be a while.

Link to comment
Share on other sites

 

I will admit this... there are some new panels on the ground at a site in Warner Robins, GA, that I pass daily. I'll try to take a minute and stop to get photos of them.

 

However, fiber deployment is a problem, based on talks with the folks who are doing it. It'll be a while.

 

Most NV backhaul is AAV, with a mix of fiber and MW making up the rest.

 

Robert via Nexus 4 using Tapatalk 2

 

 

Link to comment
Share on other sites

Most NV backhaul is AAV, with a mix of fiber and MW making up the rest.

 

Robert via Nexus 4 using Tapatalk 2

 

Windstream and Cox are both working fiber for sites... some are easy for them, as they've already done Verizon.

 

I'm not really up on what the NV panels look like, so I'll post some photos this coming week... I don't think it's a Sprint site already, but there are new antennas inside the fence in the past 2 days. These have 2 "something" (could be radios) on the back... when I can get photos, I guess you guys can fill us in.

  • Like 1
Link to comment
Share on other sites

 

Windstream and Cox are both working fiber for sites... some are easy for them, as they've already done Verizon.

 

I'm not really up on what the NV panels look like, so I'll post some photos this coming week... I don't think it's a Sprint site already, but there are new antennas inside the fence in the past 2 days. These have 2 "something" (could be radios) on the back... when I can get photos, I guess you guys can fill us in.

 

Check out the New Orleans thread in the market section. I just posted some pictures with some close ups.

 

Sent from a little old Note 2

 

 

Link to comment
Share on other sites

Check out the New Orleans thread in the market section. I just posted some pictures with some close ups.

 

Sent from a little old Note 2

I looked, I don't think those are the same panels... will post photos when I get a chance.

Link to comment
Share on other sites

I don't expect LTE in middle Georgia until late 2014 at best. Too rural, not enough subs to make the difference.

 

My contacts at Windstream and Cox say they are taking fiber to Sprint sites now, but it's going to take them a while. It took 4 months to get fiber into my data center... so they're having to plow in new stuff to many sites.

 

Sprint isn't deploying based on the amount of subs they have in an area but the time in which it can be converted. Sprint will be completely done with NV by mid 2014. So no market will have to wait until the end of 2014, actually they will be done with NV 2.0 by then.

Link to comment
Share on other sites

Fortunately, I know they already have fiber to at least the Verizon tower in my town, saw them running it. I can't get close enough to the sprint tower to find out. It is surrounded by trees and accessible only by a private driveway. But I know that area has fiber to the home available, so should be no big thing.

Link to comment
Share on other sites

I honestly don't see what's to complain about here to be honest. If you read back they initially projected something like 2015 to be complete... To be able to bump up schedule 2 yrs possibly was amazing, thus having it trickle into 2014 is no big deal...

 

Sent from my EVO using Tapatalk 2

 

 

Link to comment
Share on other sites

Fortunately, I know they already have fiber to at least the Verizon tower in my town, saw them running it. I can't get close enough to the sprint tower to find out. It is surrounded by trees and accessible only by a private driveway. But I know that area has fiber to the home available, so should be no big thing.

 

Fiber is not a public resource. It is all private owned. Sprint cannot just tap into any nearby fiber line. Sprint contracted out all the backhaul to dozens of vendors nationwide. A company won the backhaul bid for the tower you are referring to. Sprint gave them performance criteria that the company must meet, including speed, latency, down time and scalability for future upgrade.

 

The company that won can then deploy whatever backhaul makes sense for the location. As long as it meets the performance requirements and scalable for more in the future. It can be direct fiber, indirect fiber, AAV, or microwave.

 

If the fiber nearby is owned by a company that has unreasonable terms then they will persue AAV or MW for backhaul. Adjacency of fiber is no guarantee it can or will be used.

 

Robert via Samsung Note II via Tapatalk

 

 

Link to comment
Share on other sites

 

 

Fiber is not a public resource. It is all private owned. Sprint cannot just tap into any nearby fiber line. Sprint contracted out all the backhaul to dozens of vendors nationwide. A company won the backhaul bid for the tower you are referring to. Sprint gave them performance criteria that the company must meet, including speed, latency, down time and scalability for future upgrade.

 

 

 

 

The company that won can then deploy whatever backhaul makes sense for the location. As long as it meets the performance requirements and scalable for more in the future. It can be direct fiber, indirect fiber, AAV, or microwave.

 

If the fiber nearby is owned by a company that has unreasonable terms then they will persue AAV or MW for backhaul. Adjacency of fiber is no guarantee it can or will be used.

 

Robert via Samsung Note II via Tapatalk

 

I understand and know that already. It is owned by a private rural monopoly. No other phone companies to provide alternatives anywhere nearby. I understand it must meet requirements as well. I am only referring to the fact that if they use that option, it should not be a problem as it is near already and it met Verizon's requirements.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • T-Mobile Fires Back At AT&T After Their Statements On T-Priority
    • February is always closer than you think! https://stadiumtechreport.com/news/caesars-superdome-gets-matsing-deployment-ahead-of-super-bowl-lix/ Another Super Bowl, another MatSing cellular antenna deployment. Caesars Superdome, home of the NFL’s New Orleans Saints, has deployed a large number of cellular antennas from MatSing as part of an effort to increase wireless network capacity ahead of the upcoming Super Bowl LIX in February, 2025. It is the third such deployment of MatSing equipment at Super Bowl venues in as many years, following cellular upgrades at Allegiant Stadium for Super Bowl LVIII and at State Farm Stadium for Super Bowl LVII. According to the Saints, the MatSing antennas were part of a large wireless overhaul this offseason, done primarily “to satisfy fans’ desires for wireless consumption and bandwidth,” an important thing with Super Bowl LIX coming to the venue on Feb. 9, 2025. Each year, the NFL’s big game regularly sets records for wireless data consumption, with a steady upward progression ever since wireless networks were first put into stadiums. https://www.neworleanssaints.com/news/caesars-superdome-transformation-2024-new-orleans-saints-nfl-season-part-1-wifi-upgrades-wireless-cellular During the offseason renovation project, the foundation of the facility's new Distributed Antenna System (DAS) was the installation of 16 multi-beam, wideband spherical lense antennas that are seven feet in diameter and weigh nearly 600 pounds apiece, a model called the MatSing MS-48H180. Another 16 large antenna spheres of varying sizes and frequencies have also been installed for a total of 32 new large antennas, in addition to 200 cellular antennas inside and around the building, all of these products specifically made for high-density environments such as stadiums and arenas. The DAS system's performance is expected to enhance further as it becomes fully integrated throughout the season. The MatSing MS-48H180 devices, with a black color that matches the Caesars Superdome's roof, each were individually raised by hoist machines to the top of the facility and bolted into place. Each cellular antenna then transmits 48 different beams and signals to a specific area in the stadium, with each sphere angled differently to specifically target different coverage areas, allowing increased, consistent coverage for high-density seating areas. In addition to creating targets in seating and common areas throughout the stadium, these antennas create dedicated floor zones that result in improved coverage to the field areas for fans in 12 field-level suites and the Mercedes-Benz End Zone Club, teams and on-field media and broadcast elements. The project is also adding 2,500 new wireless access points placed in areas such as concourses, atriums, suites and food and beverage areas for better WiFi coverage.
    • https://www.yahoo.com/news/dallas-county-completes-first-911-194128506.html - First 911 call/text received over Starlink/T-Mobile direct to cell.  This appears to be in Dallas County, MO.
    • FCC: "We remain committed to helping with recovery efforts in states affected by Hurricane Helene. We stand ready to do all that is necessary to return connectivity to hard-hit areas and save lives." SpaceX: "SpaceX and @TMobile have been given emergency special temporary authority by the @FCC to enable @Starlink satellites with direct-to-cell capability to provide coverage for cell phones in the affected areas of Hurricane Helene. The satellites have already been enabled and started broadcasting emergency alerts to cell phones on all networks in North Carolina. In addition, we may test basic texting (SMS) capabilities for most cell phones on the T-Mobile network in North Carolina. SpaceX’s direct-to-cell constellation has not been fully deployed, so all services will be delivered on a best-effort basis." Space posted this at 2pm today on X.
    • https://ibb.co/KrTR877 https://ibb.co/DK3MVgw https://ibb.co/VgWtZwR Should work with these links
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...