Jump to content

Sprint says about one quarter behind on LTE target


Recommended Posts

Wasn't aware Sprint had coverage in Jamaica and Cuba.

 

Isaac.. No delays there. Maybe Laplace and Plaquemines Parish for a week or two. Flip over to another tower and come back to those.

 

The hurricane thing was just an excuse. And would have only been at the most a few days delay as crews got out of the way but I don't think they had started in the New Orleans market then anyways.

 

They still haven't started in Baton Rouge almost 2 months after the hurricane happened and to be honest it really wasn't that much of a hurricane event.

 

Sent from my C64 w/Epyx FastLoad cartridge

 

What about that weird derecho thing that hit DC a few months back? Could they be blaming it on that?

Link to comment
Share on other sites

Wait I thought it was the birds nesting in the towers causing delays....now its hurricanes. Lol

 

Still though they are doing fine all things considered. I remember long ago they were yapping about 2014-5 and then said LTE would be deployed by end of 2013 everywhere...so a qtr off ain't much with all things considered.

 

Dates on big projects move all the time...its the nature of forecasting the things and if ever spot on u should quit and play the lotto bc u have too much luck on ur side. Lol

  • Like 1
Link to comment
Share on other sites

 

When you say heart of the Midwest, you mean Kansas right? B)

 

That would be the heart of Sprint lol, everyone knows Ohio is the heart of the Midwest lol ;)

 

 

Sent from my EVO LTE-LESS using Tapatalk 2

 

 

Link to comment
Share on other sites

Sandy has the potential to delay everything on the east coast. Already talking evacuation possibilities along the Chesapeake, Delmarva, Jersey Shore, and NYC areas.

 

(Not making excuses for Sprint here, just giving the forecast)

 

Is it still supposed to be just cat 1?

 

Sent from my C64 w/Epyx FastLoad cartridge

 

 

Link to comment
Share on other sites

Is it still supposed to be just cat 1?

 

Sent from my C64 w/Epyx FastLoad cartridge

 

It's not supposed to be a tropical system. It's going to be some sort of tropical/extratropical hybrid system. And "just a cat 1" completely underwhelms the magnitude of this thing. It is going to be much more expansive than a normal hurricane, pushing a lot more water onto the shore than normal, and it is interacting with another system in the mid-atlantic ocean that is will be cause a huge fetch of water to be pushed into the Northeast, combining with full moon astronomical high tides, and you get extraordinary coastal flooding. Then there's the possible foot of rain, and blizzard conditions possible over inland areas. This could be a Nor'Easter like none other.

 

Not to be an alarmist, there's still a lot to be pinned down, but it's very concerning.

  • Like 1
Link to comment
Share on other sites

That would be the heart of Sprint lol, everyone knows Ohio is the heart of the Midwest lol ;)

 

 

Sent from my EVO LTE-LESS using Tapatalk 2

 

No no no. Everyone knows that Kansas is the heart of the Midwest. At least that's what they teach us in school. :D

Link to comment
Share on other sites

 

No no no. Everyone knows that Kansas is the heart of the Midwest. At least that's what they teach us in school. :D

 

Tomato, tamoto? Lol as long as we get some LTE love

 

 

Sent from my EVO LTE-LESS using Tapatalk 2

 

 

Link to comment
Share on other sites

It's not supposed to be a tropical system. It's going to be some sort of tropical/extratropical hybrid system. And "just a cat 1" completely underwhelms the magnitude of this thing. It is going to be much more expansive than a normal hurricane, pushing a lot more water onto the shore than normal, and it is interacting with another system in the mid-atlantic ocean that is will be cause a huge fetch of water to be pushed into the Northeast, combining with full moon astronomical high tides, and you get extraordinary coastal flooding. Then there's the possible foot of rain, and blizzard conditions possible over inland areas. This could be a Nor'Easter like none other.

 

Not to be an alarmist, there's still a lot to be pinned down, but it's very concerning.

 

Anything more than a Cat 3 and I'm not hanging out. Stayed outside most of the day when the Cat 3 was passing several years ago, watching shingles fly across the field was interesting.

 

I just repeat what the northerner's tell us, "why would you want to live close to the coast and in a flood area like that?" NYC should be fine, it's not like they are close to the coast or anything like that ;)

Link to comment
Share on other sites

Wait I thought it was the birds nesting in the towers causing delays....now its hurricanes. Lol

 

 

No No, You are misinformed... Its not Birds, its ANGRY Birds!!! A New version rumored to be put out by a rival company where you shoot birds at sprint towers and try and knock the evil technicians off!!! This is what is REALLY slowing it down!

 

:rofl: :rofl: :rofl:

Link to comment
Share on other sites

 

No No, You are misinformed... Its not Birds, its ANGRY Birds!!! A New version rumored to be put out by a rival company where you shoot birds at sprint towers and try and knock the evil technicians off!!! This is what is REALLY slowing it down!

 

:rofl: :rofl: :rofl:

 

Hmm... How about shoot the birds but not knock the techs off? If you don't get the birds fast enough the birds attack the techs. That would be an awesome game!

 

Sent from my C64 w/Epyx FastLoad cartridge

 

 

  • Like 2
Link to comment
Share on other sites

 

Anything more than a Cat 3 and I'm not hanging out. Stayed outside most of the day when the Cat 3 was passing several years ago, watching shingles fly across the field was interesting.

 

I just repeat what the northerner's tell us, "why would you want to live close to the coast and in a flood area like that?" NYC should be fine, it's not like they are close to the coast or anything like that ;)

 

Lol... Esp the flood area part... Too much water up there and the financial district is a gonner. Lol

 

Sent from my EVO using Tapatalk 2

 

 

Link to comment
Share on other sites

  • 5 weeks later...
This makes me sad, means I likely won't see LTE until 2015. :(

 

This thread discusses a one quarter delay, not one year.

 

Robert via Nexus 7 on Tapatalk

 

 

Link to comment
Share on other sites

Wasn't the plan to have 12,000 sites completed this year? There's only 34 days left this year and you need to factor Christmas into that. I don't see how that number is possible.

its not going to happen and that is why as said in this thread that they are a quarter behind which is about 3 months I bealve
Link to comment
Share on other sites

Wasn't the plan to have 12,000 sites completed this year? There's only 34 days left this year and you need to factor Christmas into that. I don't see how that number is possible.

 

Definitely not going to happen.

 

Robert via Nexus 7 on Tapatalk

 

 

Link to comment
Share on other sites

its not going to happen and that is why as said in this thread that they are a quarter behind which is about 3 months I bealve

 

I was pointing out that the math doesn't really add up for just a quarter behind. At the current rates of deployment, it seems like they are more than 3 months behind.

Link to comment
Share on other sites

Oh well! The way i look at it, theres still a "great unknown outcome" to the softbank investment. I would expect all plans to go into hyperdrive once Son is officially sitting at the table. Is money the key to a faster deployment? Not necessarily, but I fail to believe he will be satisfied with the status quo of the old cash strapped sprint

Link to comment
Share on other sites

I was pointing out that the math doesn't really add up for just a quarter behind. At the current rates of deployment, it seems like they are more than 3 months behind.

It does in a way, but theres markets that have not started yet as far as we know and some have been delayed like the michagain market,Minnesota thats now having sites accepted, some seconed round markets havent even started yet or alteast haven't had sites accepted from sprint. I think that sprint had that number a little high, but if all the markets would have started on time i could see it being around that number
Link to comment
Share on other sites

The number of sites accepted only tells part of the story. There are hundreds, if not thousands, of sites that work is currently under way.

 

Robert

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • In the conference call they had two question on additional spectrum. One was the 800 spectrum. They are not certain what will happen, thus have not really put it into their plans either way (sale or no sale). The do have a reserve level. It is seen as great for new technologies which I presume is IOT or 5g slices.  They did not bite on use of their c-band or DOD.  mmWave rapidly approaching deadlines not mentioned at all. FWA brushes on this as it deals with underutilized spectrum on a sector by sector basis.  They are willing to take more money to allow FWA to be mobile (think RV or camping). Unsure if this represents a higher priority, for example, RVs in Walmart parking lots where mobile needs all the capacity. In terms of FWA capacity, their offload strategy is fiber through joint ventures where T-Mobile does the marketing, sales, and customer support while the fiber company does the network planning and installation.  50%-50% financial split not being consolidated into their books. I think discussion of other spectrum would have diluted the fiber joint venture discussion. They do have a fund which one use is to purchase new spectrum. Sale of the 800Mhz would go into this. It should be noted that they continue to buy 2.5Ghz spectrum from schools etc to replace leases. They will have a conference this fall  to update their overall strategies. Other notes from the call are 75% of the phones on the network are 5g. About 85% of their sites have n41, n25, and n71. 93% of traffic is on midband.  SA is also adding to their performance advantage, which they figure is still ahead of other carriers by two years. It took two weeks to put the auction 108 spectrum to use at their existing sites. Mention was also made that their site spacing was designed for midrange thus no gaps in n41 coverage, while competitors was designed for lowband thus toggles back and forth for n77.  
    • The manual network selection sounds like it isn't always scanning NR, hence Dish not showing up. Your easiest way to force Dish is going to be forcing the phone into NR-only mode (*#*#4636#*#* menu?), since rainbow sims don't support SA on T-Mobile.
    • "The company’s unique multi-layer approach to 5G, with dedicated standalone 5G deployed nationwide across 600MHz, 1.9GHz, and 2.5GHz delivers customers a consistently strong experience, with 85% of 5G traffic on sites with all three spectrum bands deployed." Meanwhile they are very close to a construction deadline in June for 850Mhz of mmWave in most of Ohio iirc. No reported sightings.
    • T-Mobile Delivers Industry-Leading Customer, Service Revenue and Profitability Growth in Q1 2024, and Raises 2024 Guidance https://www.t-mobile.com/news/business/t-mobile-q1-2024-earnings — — — — — I find it funny that when they talk about their spectrum layers they're saying n71, n25, and n41. They're completely avoiding talking about mmWave.
    • Was true in my market. Likely means a higher percentage of 5g phones in your market.