Network Vision/LTE - Missouri Market (includes St. Louis)


riddlebox

Recommended Posts

Okay I am a sponsor now, so i can see the maps where the towers are in my area. Is it considered trespassing to drive down the roads where the towers are? Most of them are kinda in areas where people don't generally go to. I don't want to get in trouble for driving to the sites and taking pictures. Also is posting the coordinates of sites against the rules?

Link to comment
Share on other sites

Okay I am a sponsor now, so i can see the maps where the towers are in my area. Is it considered trespassing to drive down the roads where the towers are? Most of them are kinda in areas where people don't generally go to. I don't want to get in trouble for driving to the sites and taking pictures. Also is posting the coordinates of sites against the rules?

 

If there's no gate, fence or no trespassing sign, then unless it's obviously on private property it should be ok.

 

As for discussion of locations, probably best to use the sponsor forums.

 

Either use this existing thread: http://s4gru.com/index.php?/topic/530-network-vision-site-map-arkansas-kansas-missouri-oklahoma-markets/page__pid__118427__st__380#entry118427

 

Or create a new one here: http://s4gru.com/index.php?/forum/30-s4gru-sponsors-forum/

 

Then you don't have to worry about what information you're posting.

Link to comment
Share on other sites

How do i become a sponsor? I can help with info from towers in the metro east....from Alton to Collinsville and Collinsville to Granite City. How do i know where the towers are? Just tell me what I need to do and I'll do it.

I actually live in the Alton, Godfrey area. Haven't even heard about work starting here yet. nor have I seen anything yet. Kinda sucks.
Link to comment
Share on other sites

I actually live in the Alton, Godfrey area. Haven't even heard about work starting here yet. nor have I seen anything yet. Kinda sucks.

 

Well if you look at the map there are some sites that are being worked on in North (St Lous) County and West County. And with them being so close to being wrapped up in Kansas it can't be too far off. And if there is no one giving updates on these towers who is to know? I am going to try to drive by a coupe of the towers in Alton today to just peek around and see if anything looks changed or anything.

Link to comment
Share on other sites

Any news on the joplin area? Several sites seemed to be ready for a couple weeks now. Any activations lately?

 

With the weather lately, probably not much activity. I suspect things will continue to be slow until April, as Spring has been delayed several weeks .... ;)

Link to comment
Share on other sites

I hear you guys. Im out of town now but with so many sites with panels and cabinets installed I was hoping some would get accepted. Thanks for the update.

Link to comment
Share on other sites

Actually, 2 more sites accepted today in Joplin. Check the Comments Related to NV Sites Complete for details.

 

And the first St. Louis site conversion. ;)

 

Robert via Samsung Note II via Tapatalk

 

 

  • Like 1
Link to comment
Share on other sites

I went by a Sprint Tower today. Took some shots just for comparison for later on down the road. Can someone take a look at this tower and tell me what I am looking at? I'm 99% sure that none of the Sprint stuff is NV related. Which stuff is Sprint? That way i know if anything is changed down the road.

Link to comment
Share on other sites

I went by a Sprint Tower today. Took some shots just for comparison for later on down the road. Can someone take a look at this tower and tell me what I am looking at? I'm 99% sure that none of the Sprint stuff is NV related. Which stuff is Sprint? That way i know if anything is changed down the road.

 

Second level is the only one that has anything like Sprint on it from what I can tell.

Link to comment
Share on other sites

No, a new site. Unrelated. First truly NV site.

Ah, I see it on the map. Cool...What does this mean exactly? Why are they installing new 3G sites? Consider me a noob but I appreciate all of the info.

Link to comment
Share on other sites

Ah, I see it on the map. Cool...What does this mean exactly? Why are they installing new 3G sites? Consider me a noob but I appreciate all of the info.

 

Not installing new, replacing. Every Sprint site is getting an overhaul as part of the Network Vision project. This includes new equipment that replaces the legacy equipment. The new NV panels on the towers are capable of transmitting the upgraded 3G as well as LTE from the same panel. The 3G acceptance means that NV equipment has been installed, and the 3G side of it has been accepted, however the LTE side has not. Likely the NV equipment is not yet live, as 3G is brought online only when a cluset of sites have been upgraded.

Link to comment
Share on other sites

Nothing new to see at the Dellwood rec center site but the service is the best I have ever gotten there by at least double the data of the next highest test and 10-20x normal. 1.23 mbps down/.52 up.

The ping was 172 ms. What's the normal ping for a 3G site with NV level backhaul? Does the ping further improve with new cabinets and gear?

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Similar Content

  • Posts

    • Historically, T-Mobile has been the only carrier contracting with Crown Castle Solutions, at least in Brooklyn. I did a quick count of the ~35 nodes currently marked as "installed" and everything mapped appears to be T-Mobile. However, they have a macro sector pointed directly at this site and seem to continue relying on the older-style DAS nodes. Additionally, there's another Crown Castle Solutions node approved for construction just around the corner, well within range of their macro. I wouldn’t be surprised to see Verizon using a new vendor for their mmWave build, especially since the macro site directly behind this node lacks mmWave/CBRS deployment (limited to LTE plus C-Band). However, opting for a multi-carrier solution here seems unlikely unless another carrier has actually joined the build. This node is equidistant (about five blocks) between two AT&T macro sites, and there are no oDAS nodes deployed nearby. Although I'm not currently mapping AT&T, based on CellMapper, it appears to be right on cell edge for both sites. Regardless, it appears that whoever is deploying is planning for a significant build. There are eight Crown Castle Solutions nodes approved for construction in a 12-block by 2-block area.
    • Starlink (1900mhz) for T-Mobile, AST SpaceMobile (700mhz and 850mhz) for AT&T, GlobalStar (unknown frequency) for Apple, Iridium (unknown frequency) for Samsung, and AST SpaceMobile (850mhz) for Verizon only work on frequency bands the carrier has licensed nationwide.  These systems broadcast and listen on multiple frequencies at the same time in areas much wider than normal cellular market license areas.  They would struggle with only broadcasting certain frequencies only in certain markets so instead they require a nationwide license.  With the antennas that are included on the satellites, they have range of cellular band frequencies they support and can have different frequencies with different providers in each supported country.  The cellular bands in use are typically 5mhz x 5mhz bands (37.5mbps total for the entire cell) or smaller so they do not have a lot of data bandwidth for the satellite band covering a very large plot of land with potentially millions of customers in a single large cellular satellite cell.  I have heard that each of Starlink's cells sharing that bandwidth will cover 75 or more miles. Satellite cellular connectivity will be set to the lowest priority connection just before SOS service on supported mobile devices and is made available nationwide in supported countries.  The mobile device rules pushed by the provider decide when and where the device is allowed to connect to the satellite service and what services can be provided over that connection.  The satellite has a weak receiving antenna and is moving very quickly so any significant obstructions above your mobile device antenna could cause it not to work.  All the cellular satellite services are starting with texting only and some of them like Apple's solution only support a predefined set of text messages.  Eventually it is expected that a limited number of simultaneous voice calls (VoLTE) will run on these per satellite cell.  Any spare data will then be available as an extremely slow LTE data connection as it could potentially be shared by millions of people.  Satellite data from the way these are currently configured will likely never work well enough to use unless you are in a very remote location.
    • T-Mobile owns the PCS G-block across the contiguous U.S. so they can just use that spectrum to broadcast direct to cell. Ideally your phone would only connect to it in areas where there isn't any terrestrial service available.
    • So how does this whole direct to satellite thing fit in with the way it works now? Carriers spend billions for licenses for specific areas. So now T-Mobile can offer service direct to customers without having a Terrestrial license first?