Jump to content

600 MHz auction results posted and transition schedule


ericdabbs

Recommended Posts

  • 2 weeks later...

Is there something to prevent Softbank/Sprint jumping in and winning all of the 30/40MHz reserved spectrum?

 

Likely the only limitation is the size of their war chest and how deeply they're willing to dig into it.

Link to comment
Share on other sites

¿Que?

 

When it comes to maximus, more like ¡qué lástima!

 

AJ

Link to comment
Share on other sites

I wish Dish would either have to pay more ore not able buy that spectrum at all. It is ridiculous on what they are doing. How are they able to buy all this spectrum and not have to sell what they don't use. They should be limited just like the wireless carriers are for how much spectrum they can have in each market.

  • Like 1
Link to comment
Share on other sites

I wish Dish would either have to pay more ore not able buy that spectrum at all. It is ridiculous on what they are doing. How are they able to buy all this spectrum and not have to sell what they don't use. They should be limited just like the wireless carriers are for how much spectrum they can have in each market.

They are. They can't own > 1/3 in each market.

Link to comment
Share on other sites

I wish Dish would either have to pay more ore not able buy that spectrum at all. It is ridiculous on what they are doing. How are they able to buy all this spectrum and not have to sell what they don't use. They should be limited just like the wireless carriers are for how much spectrum they can have in each market.

 

Stop worrying about it.  Dish's spectrum accumulation is not presently causing problems.  Construction requirements cannot be imposed overnight -- that is not realistic.  Rather, those deadlines must be set years in the future.  If Dish just continues to dick around for the next several years, then it will face the consequences.  For now, though, you have to wait and see.  And as a fair comparison, remember that the FCC awarded Nextel the set of PCS G block nationwide licenses as compensatory spectrum over a decade ago, but Sprint did not put that spectrum into commercial service until 2012.

 

AJ

Link to comment
Share on other sites

However, the subject isn't 9000 cell sites. The subject is the 600MHz auction.

 

I thought the subject was softy's desire to dig deeply.

I guess they could think that 600MHz is more important to Sprint's survival but since it won't be deployable until 2017-2020, the extra 9k+ sites would seem to do more for sprint short term.

Link to comment
Share on other sites

For one, you thought incorrectly; the title of this thread makes it pretty clear what the subject is. Two, I don't know who or what 'softy' is. Moreover, like a lot of people on the internet, you seem to be caught up in an either/or fallacy.

  • Like 2
Link to comment
Share on other sites

I wish Dish would either have to pay more ore not able buy that spectrum at all. It is ridiculous on what they are doing. How are they able to buy all this spectrum and not have to sell what they don't use. They should be limited just like the wireless carriers are for how much spectrum they can have in each market.

 

 

Stop worrying about it.  Dish's spectrum accumulation is not presently causing problems.  Construction requirements cannot be imposed overnight -- that is not realistic.  Rather, those deadlines must be set years in the future.  If Dish just continues to dick around for the next several years, then it will face the consequences.  For now, though, you have to wait and see.  And as a fair comparison, remember that the FCC awarded Nextel the set of PCS G block nationwide licenses as compensatory spectrum over a decade ago, but Sprint did not put that spectrum into commercial service until 2012.

 

AJ

 

 

AWS-4 Interim Build-out Requirement: Within four (4) years, a licensee shall provide reliable terrestrial signal coverage and offer terrestrial service to at least forty (40) percent of its total AWS-4 population. A licensee’s total AWS-4 population shall be calculated by summing the population of each of its license areas in the AWS-4 band.  AWS-4 Final Build-out Requirement: Within seven (7) years, a licensee shall provide reliable terrestrial signal coverage and offer terrestrial service to at least seventy (70) percent of the population in each of its license areas. 188. Additionally, we adopt the following penalties for failing to meet the build-out benchmarks:  Failure to Meet AWS-4 Interim Build-out Requirement: Where a licensee fails to meet the aggregate AWS-4 Interim Build-out Requirement, the AWS-4 Final Build-out Requirement shall be accelerated by one year (from seven to six years).  Failure to Meet AWS-4 Final Build-out Requirement: Where a licensee fails to meet the AWS-4 Final Build-out Requirement in any EA, its authorization for each EA in which it fails to meet the requirement shall terminate automatically without Commission action. To the extent that the licensee also holds the 2 GHz MSS rights for the affected license area, failure to meet the AWS-4 Final Build-out Requirement in an EA shall also result in the MSS protection rule in section 27.1136 of the Commission’s rules no longer applying to that EA.

 

https://apps.fcc.gov/edocs_public/attachmatch/FCC-12-151A1.pdf

 

Adopted: December 11, 2012 Released: December 17, 2012

 

 

Discussion. Under the waiver standard articulated above, we grant the one-year waiver DISH requests. In adopting the AWS-4 performance requirements, the Commission observed it “establishes performance requirements to promote the productive use of spectrum, to encourage licensees to provide service to customers expeditiously, and to promote the provision of innovative services throughout the license area(s), including in rural areas.”

 

https://apps.fcc.gov/edocs_public/attachmatch/DA-13-2409A1.pdf

Link to comment
Share on other sites

For one, you thought incorrectly; the title of this thread makes it pretty clear what the subject is. Two, I don't know who or what 'softy' is. Moreover, like a lot of people on the internet, you seem to be caught up in an either/or fallacy.

softy=softbank, shortening

Link to comment
Share on other sites

For one, you thought incorrectly; the title of this thread makes it pretty clear what the subject is. Two, I don't know who or what 'softy' is.

 

No "softy" for maximus.  He has a hard on for S4GRU.

 

AJ

  • Like 6
Link to comment
Share on other sites

softy=softbank, shortening

 

Thanks for clearing that up...Anyway, the 600MHz auction if and when it occurs is likely to be the last auction of low band spectrum for quite some time. It's not unreasonable to expect that SoftBank as well as all of the other carriers, large and small, to pull out all of the stops to acquire as much as they can. Now I doubt that anybody not in their C-suite can accurately project what SoftBank's bidding strategy will be and how it'll all shake out at this juncture.

Link to comment
Share on other sites

And as a fair comparison, remember that the FCC awarded Nextel the set of PCS G block nationwide licenses as compensatory spectrum over a decade ago, but Sprint did not put that spectrum into commercial service until 2012.

That doesn't make it okay. And before you jump on me about it, yes I'm aware that T-Mobile, AT&T, and Verizon have done this too. Every single spectrum license holder does this, and I still don't believe it's a good thing to allow such wastefulness.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • Interesting, I saw this too on my AT&T S22 while roaming on US Cellular. I thought it was an Android bug since CellMapper was doing the same thing (didn't get a screenshot of that one). N66 makes more sense than N1. 
    • Thanks, that was good timing, I did see your report as I was buttoning up this latest update and added an override for that.. did it not work?   Ok, was that on AT&T also? Please send a report if you happen to see it again and safely have the opportunity. You can always do the long-press on the fly and then send a later one with an explanation pointing to the earlier one.. your username is attached to the long-press reports, so it's not an issue.
    • I sent a report in earlier, n66 reporting as n1. There should be two different reports, I couldn't find the button the first time so I just long pressed the connection type to send, then I remembered where it was. I put a note about the issue on the 2nd report. Both reports from me are for the same issue. Also, it might have been on a prior release but earlier this week I also saw n66 reported as n65 on the app. I was driving and wasn't able to send a report in for that one. 
    • One more SCP beta rolling out.. includes more bugfixes and minor improvements. Pending any major issues with this version, it will be released to the public within a few days. Thanks for all the help and feedback!
    • Passed by the former Sprint site at 1184 60th St in Brooklyn last week and noticed T-Mobile took down all of the Sprint equipment but it looked like they installed some new cabinets so conversion is likely in progress.
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...