If Sprint's NV Schedule holds for May, the maps below show 627 LTE sites that should come live in May 2012. These maps does not include 3G only sites that will go live in the same period. It's possible that sites will go also live in Boston, Chicago and DC too dependent on backhaul and 4G data center connections.

 

S4GRU Sponsors can view interactive versions of these maps by following this link. Also, Sponsors can follow along as we show progress throughout the month in our NV Complete Sites thread.

 

 

gallery_1_1_31895.jpg

 

 

gallery_1_1_33045.jpg

 

 

gallery_1_1_18430.jpg

 

 

gallery_1_1_110629.jpg

 

 

gallery_1_1_30476.jpg

 

 

gallery_1_1_8586.jpg

 

 

gallery_1_1_49707.jpg

 

 

gallery_1_1_38227.jpg

 

 

gallery_1_1_70815.jpg

  • Like 2
Link to comment
Share on other sites

Poor samsung. I bet it is long days for the guy managing the samsung deployment in Chicago.

 

Have you heard any updates on Chicago? Seems like they are still facing major headwinds...?

Link to comment
Share on other sites

Poor samsung. I bet it is long days for the guy managing the samsung deployment in Chicago.

 

Have you heard any updates on Chicago? Seems like they are still facing major headwinds...?

 

Haven't heard any updates since my last article on it. http://s4gru.com/index.php?/blog/1/entry-166-sprint-battling-network-vision-deployment-woes-in-the-windy-city/

 

Robert

Link to comment
Share on other sites

Its going to be a slow process for phoenix right?
they may be making it into the second round. Could be this fall/winter

 

Sent from my Kindle Fire running CM9.

  • Like 1
Link to comment
Share on other sites

Looks like it's gonna hit Knoxville Tennesse, or is that just my eyes playing tricks on me?

 

In round 2, yes.

 

Sent from my Kindle Fire running CM9.

Link to comment
Share on other sites

In round 2, yes.

 

Sent from my Kindle Fire running CM9.

 

Excuse me for being a noobie to the site, but are these round 2 pictures? If not, where in Tennesse will this May LTE deployment going to?

Link to comment
Share on other sites

These are round 1 pictures. Round 2 won't kick off until later in 2012.

=( can't wait for Knoxville to get LTE considering they left WiMAX half done here. You can get it in a couple of locations.

  • Like 2
Link to comment
Share on other sites

any news on CT?

 

The South Connecticut market was announced in round 2 and should start later this year depending on how round 1 shakes out. The North Connecticut market is not in the first 2 rounds and Robert is not speculating on 3rd and 4th rounds because there is way too many variables to have any degree of accuracy. It will most likely be 2013.

  • Like 1
Link to comment
Share on other sites

Seems like they're two NV sites within walking distance of my home w/ 4G turning on next Saturday. Hopefully this will include some 3G speed increases as well(slow 3G was reason for me leaving on the first place).

  • Like 1
Link to comment
Share on other sites

Forgive me for being dim, but is this map showing that Los Angeles will have LTE this month?

 

Yes, this map shows that LA should have LTE this month.

Link to comment
Share on other sites

Well that's fantastic news! I'm off to pre-order the EVO LTE then. Thanks so much!

 

You're welcome. And enjoy your new phone.

Link to comment
Share on other sites

Guest
This topic is now closed to further replies.

  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • T-Mobile has saved its 28Mhz mmWave licenses by using the point to point method to do environment monitoring inside its cabinets. The attachment below shows the antennas used: https://wireless2.fcc.gov/UlsApp/ApplicationSearch/applAdmin.jsp;JSESSIONID_APPSEARCH=LxvbnJuvusmIklPhKy6gVK7f9uwylrZ8LiNf3BqIKlDp3_5GxoBr!300973589!225089709?applID=14787154#   Here are the sites for Franklin county OH: https://wireless2.fcc.gov/UlsEntry/attachments/attachmentViewRD.jsp?applType=search&fileKey=66518254&attachmentKey=21989782&attachmentInd=applAttach
    • Yep, there is a label on the side of the box but it doesn't provide any useful info that the city doesn't already provide (Crown Castle Solutions is the franchisee). You can see my graphical interpretation of the city's dataset here.
    • T-Mobile UScellular agreement links from SEC filings: https://www.sec.gov/ix?doc=/Archives/edgar/data/821130/000110465924065665/tm2415626d2_8k.htm Look inside for main link. Credit mdav-dos1 on reddit
    • Totally agree.  In my county and surrounding counties, TM did not place n-41 on every site.  When I look at the sites in question, I probably would have not placed it there either.  I can find just a few with n-71 only and in most of those cases if you live there and know the probable usage of the residents, you would not do a full upgrade on those sites.  One site in particular is set up to force feed n-71 through a long tunnel on the Turnpike.  No stopping allowed in the tunnel. No stores, movie theaters, bathrooms, so n41 would be a waste.    n25 is not really needed either, so it is not there.  The tunnel is going through & under a mountain with more black bears than people.  TM was smart.  Get good coverage in the tunnel but do not waste many many thousands of dollars with extra unused spectrum. I also see sites with only n71 & n25.  Again this makes sense to me.  Depending on what county we are talking about, they moved much of their b25 from LTE to nr.  Some counties have more n25 than a neighboring county, but luckily, it is plenty everywhere.   When you are in a very rural area, n41 can run up the bills and then be barely used.  I am NOT finding sites that should have had n41 but TM failed to provide it.  They may have to come back later in a few years and upgrade the site to n41.  However, we just may eventually see the last little piece on Band 25 leave LTE and move to n25. I am not sure if the satellite to phone service is using band 25 G block as LTE or nr. We also can possibly have at least some AWS move from LTE to nr at some point.  Yes, everybody wants n41. it is not justified in some cases.  When I travel, I desire some decent service along the entire route but it does not have to be 1 or 2 gig download.   If I can get 50/5 on a speedtest with data that will flow and not stutter, I am very happy. Yes, they will swap out the USC gear.  TM needs to match their existing network. The USCC equipment did the job for years, but it is time to retire it.
    • Lots of time if you can get close to the pole, you will see a sticky label on the box that is low enough to read. Most of the time it warns of RF exposure but also it may have a toll free number to call if there is an issue. Sometimes there is a power company meter with the name of the user. I would be surprised if there was nothing there to help identify it.  Thinking further, if this is multi-Tenant oDAS, then maybe you might only see some name like Crown Castle or maybe even a department in the city government.   An app on your phone may show the carrier(s)