Jump to content

Network Vision/LTE - Phoenix Market (including Flagstaff, Prescott)


MaxPower

Recommended Posts

I work in City Planning for a Phoenix metro municipality. Within the last month, Sprint contractors have brought in preliminary plans for a couple sites in the West Valley. It's a very slow trickle of sites to be upgraded, but I believe NV is in the "plans" stage of being deployed in PHX.

Edited by boiker
  • Like 6
Link to comment
Share on other sites

  • 4 weeks later...

I work in City Planning for a Phoenix metro municipality. Within the last month, Sprint contractors have brought in preliminary plans for a couple sites in the West Valley. It's a very slow trickle of sites to be upgraded, but I believe NV is in the "plans" stage of being deployed in PHX.

 

Any update on more sites for Phoenix since?

Link to comment
Share on other sites

Any update on more sites for Phoenix since?

 

Nothing new regarding Sprint to report where I work. However, Verizon/AT&T are building out their network like crazy.

Link to comment
Share on other sites

Nothing new regarding Sprint to report where I work. However, Verizon/AT&T are building out their network like crazy.

 

*sigh* Verizon and AT&T always ahead of the game. I just hope that Tmobile doesn't lap Sprint in deploying LTE in Phoenix.

Link to comment
Share on other sites

Nothing new regarding Sprint to report where I work. However, Verizon/AT&T are building out their network like crazy.

 

There have been several permits pulled in Peoria by Coal Creek Consulting for Sprint Network Vision upgrades. You should check them out. I'm surprised you didn't actually report them to us. :)

 

http://s4gru.com/index.php?/topic/2877-new-building-permits-for-phoenix-upgrades/

 

Robert

  • Like 1
Link to comment
Share on other sites

I'm surprised you didn't actually report them to us. :)

 

http://s4gru.com/ind...oenix-upgrades/

 

Robert

 

I changed jobs right before they pulled permits :) I'm in Buckeye, AZ now. Due to the patchwork of development out here, we'll probably be the tail end of the roll out. As I see things, I'll update!

  • Like 1
Link to comment
Share on other sites

I changed jobs right before they pulled permits :) I'm in Buckeye, AZ now. Due to the patchwork of development out here, we'll probably be the tail end of the roll out. As I see things, I'll update!

 

Holy moly. That's even out of the 303 Loop!!! I look forward to your update.

 

Robert

Link to comment
Share on other sites

I wanted to look but requires a password...lame lol

 

It is in the Sponsor section. For more info about becoming a S4GRU Sponsor, visit this link: http://s4gru.com/index.php?/topic/1195-information-about-s4gru-sponsorship-levels-and-how-to-become-a-sponsor/

 

Robert

Link to comment
Share on other sites

  • 2 weeks later...
  • 2 weeks later...
I can report that Clear Blue Services will be pulling permits in Buckeye in the coming weeks. The upgrades are coming!

 

Thanks for the update, Ed. It will be nice to be able to visit Arizona again. :)

 

Robert via Nexus 7 with Tapatalk HD

Link to comment
Share on other sites

  • 2 weeks later...

What's the current status of the Phoenix area (Scottsdale, in particular)? I've read through most of the information you guys have provided. It's fantastic! Any update as to when things will start to happen here? :) What's the latest news? I just switched from Verizon to Sprint a few days ago. Definitely notice a drop-off in data speeds, but I can tolerate it until these upgrades take place. [ First post - enjoy the site. Glad to be a part of it. ]

Link to comment
Share on other sites

What's the current status of the Phoenix area (Scottsdale, in particular)? I've read through most of the information you guys have provided. It's fantastic! Any update as to when things will start to happen here? :) What's the latest news? I just switched from Verizon to Sprint a few days ago. Definitely notice a drop-off in data speeds, but I can tolerate it until these upgrades take place. [ First post - enjoy the site. Glad to be a part of it. ]

 

Permits are being pulled all over the Phoenix market. Work is starting now. We may have our first sites being accepted in the next 30 days.

 

Since this is an AlcaLu market, they will start posting 3G upgrades first, and then LTE will start going live 3-4 months after the first 3G site is accepted.

 

Robert via Nexus 7 with Tapatalk HD

  • Like 2
Link to comment
Share on other sites

Permits are being pulled all over the Phoenix market. Work is starting now. We may have our first sites being accepted in the next 30 days.

 

Since this is an AlcaLu market, they will start posting 3G upgrades first, and then LTE will start going live 3-4 months after the first 3G site is accepted.

 

Robert via Nexus 7 with Tapatalk HD

 

Wow. So things are moving quickly (finally?). Based on this information, we should start to see improved 3G speeds sometime in the next couple months, then some 4GLTE sites being put up in the summer time?!

 

I appreciate the information. Makes me feel good about switching from Big Red to Sprint. :)

 

Please keep all of us posted as you find out more information. Addicted to this site now! Appreciate all of the work you guys do.

  • Like 2
Link to comment
Share on other sites

 

Wow. So things are moving quickly (finally?). Based on this information, we should start to see improved 3G speeds sometime in the next couple months, then some 4GLTE sites being put up in the summer time?!

 

I appreciate the information. Makes me feel good about switching from Big Red to Sprint. :)

 

Please keep all of us posted as you find out more information. Addicted to this site now! Appreciate all of the work you guys do.

 

Yes, your conclusions are correct. You should consider becoming an S4GRU Sponsor. You would have access to much more content, including more Phoenix threads. Additional info includes maps of all Sprint sites, maps of all the Phoenix sites permitted and the best feature is the NV Sites Complete maps. We log every accepted Sprint site when it is completed on to a nationwide map.

 

Sponsor info: http://s4gru.com/index.php?/topic/1195-information-about-s4gru-sponsorship-levels-and-how-to-become-a-sponsor/

 

Robert via Nexus 7 with Tapatalk HD

  • Like 2
Link to comment
Share on other sites

Yes, your conclusions are correct. You should consider becoming an S4GRU Sponsor. You would have access to much more content, including more Phoenix threads. Additional info includes maps of all Sprint sites, maps of all the Phoenix sites permitted and the best feature is the NV Sites Complete maps. We log every accepted Sprint site when it is completed on to a nationwide map.

 

Sponsor info: http://s4gru.com/ind...come-a-sponsor/

 

Robert via Nexus 7 with Tapatalk HD

 

I just donated. I now have skin in the game.

 

Now what?

 

Thanks!!

  • Like 1
Link to comment
Share on other sites

 

I just donated. I now have skin in the game.

 

Now what?

 

Thanks!!

 

Your account was upgraded immediately. Go down to the S4GRU Club section at the bottom of the forums and start exploring your new turf.

 

Robert via Nexus 7 with Tapatalk HD

  • Like 2
Link to comment
Share on other sites

  • 3 weeks later...

The very first Network Vision site was accepted in the Phoenix market this week. More details coming in the Sponsor sections and maps.

 

Robert

  • Like 5
Link to comment
Share on other sites

  • 2 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • Historically, T-Mobile has been the only carrier contracting with Crown Castle Solutions, at least in Brooklyn. I did a quick count of the ~35 nodes currently marked as "installed" and everything mapped appears to be T-Mobile. However, they have a macro sector pointed directly at this site and seem to continue relying on the older-style DAS nodes. Additionally, there's another Crown Castle Solutions node approved for construction just around the corner, well within range of their macro. I wouldn’t be surprised to see Verizon using a new vendor for their mmWave build, especially since the macro site directly behind this node lacks mmWave/CBRS deployment (limited to LTE plus C-Band). However, opting for a multi-carrier solution here seems unlikely unless another carrier has actually joined the build. This node is equidistant (about five blocks) between two AT&T macro sites, and there are no oDAS nodes deployed nearby. Although I'm not currently mapping AT&T, based on CellMapper, it appears to be right on cell edge for both sites. Regardless, it appears that whoever is deploying is planning for a significant build. There are eight Crown Castle Solutions nodes approved for construction in a 12-block by 2-block area.
    • Starlink (1900mhz) for T-Mobile, AST SpaceMobile (700mhz and 850mhz) for AT&T, GlobalStar (unknown frequency) for Apple, Iridium (unknown frequency) for Samsung, and AST SpaceMobile (850mhz) for Verizon only work on frequency bands the carrier has licensed nationwide.  These systems broadcast and listen on multiple frequencies at the same time in areas much wider than normal cellular market license areas.  They would struggle with only broadcasting certain frequencies only in certain markets so instead they require a nationwide license.  With the antennas that are included on the satellites, they have range of cellular band frequencies they support and can have different frequencies with different providers in each supported country.  The cellular bands in use are typically 5mhz x 5mhz bands (37.5mbps total for the entire cell) or smaller so they do not have a lot of data bandwidth for the satellite band covering a very large plot of land with potentially millions of customers in a single large cellular satellite cell.  I have heard that each of Starlink's cells sharing that bandwidth will cover 75 or more miles. Satellite cellular connectivity will be set to the lowest priority connection just before SOS service on supported mobile devices and is made available nationwide in supported countries.  The mobile device rules pushed by the provider decide when and where the device is allowed to connect to the satellite service and what services can be provided over that connection.  The satellite has a weak receiving antenna and is moving very quickly so any significant obstructions above your mobile device antenna could cause it not to work.  All the cellular satellite services are starting with texting only and some of them like Apple's solution only support a predefined set of text messages.  Eventually it is expected that a limited number of simultaneous voice calls (VoLTE) will run on these per satellite cell.  Any spare data will then be available as an extremely slow LTE data connection as it could potentially be shared by millions of people.  Satellite data from the way these are currently configured will likely never work well enough to use unless you are in a very remote location.
    • T-Mobile owns the PCS G-block across the contiguous U.S. so they can just use that spectrum to broadcast direct to cell. Ideally your phone would only connect to it in areas where there isn't any terrestrial service available.
    • So how does this whole direct to satellite thing fit in with the way it works now? Carriers spend billions for licenses for specific areas. So now T-Mobile can offer service direct to customers without having a Terrestrial license first?
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...