Jump to content

Sprint may need up to 40,000 new cell sites for 2.5 GHz


mhammett

Recommended Posts

http://www.fiercewireless.com/tech/story/sprint-may-need-40000-new-cell-sites-25-ghz-tower-exec-says/2014-05-04?utm_source=Twitter&utm_medium=Editor&utm_campaign=SocialMedia

 

 

 

 

Sprint (NYSE: S) will need to roll out an additional 30,000-40,000 transmission sites if the carrier wants its 2.5 GHz TD-LTE network to reach coverage parity with its 1.9 GHz networks, according to the head of American Tower.

 

Well, we kinda already knew that and I don't think their attempting to.

  • Like 1
Link to comment
Share on other sites

I'm all for 40K More towers...but how about in areas not covered! How about with NV TOO!!  :-) Let's get some more organic coverage!! :-D

  • Like 4
Link to comment
Share on other sites

It will be much less because of beam forming. And the propagation difference between 2600 and 1900MHz is not as big as they are making it out to be. We notice a huge difference between 2600 Wimax and 1900 EVDO. But the difference between LTE 2600 and LTE 1900 is much smaller.

 

Sprint says in internal documents that 1900MHz reaches only 30% farther than 2600 with all things being equal. And beamforming can close most of that gap, if not all of it.

 

Robert via Samsung Note 8.0 using Tapatalk Pro

  • Like 9
Link to comment
Share on other sites

 

You can subtract the 8,000 non-redundant Clearwire sites from that number.

Link to comment
Share on other sites

I think American Tower is just trying to lure investors into thinking they are going to go gang busters in the next few years.

 

I literally came in here to post that exact statement. 

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • T-Mobile has saved its 28Mhz mmWave licenses by using the point to point method to do environment monitoring inside its cabinets. The attachment below shows the antennas used: https://wireless2.fcc.gov/UlsApp/ApplicationSearch/applAdmin.jsp;JSESSIONID_APPSEARCH=LxvbnJuvusmIklPhKy6gVK7f9uwylrZ8LiNf3BqIKlDp3_5GxoBr!300973589!225089709?applID=14787154#   Here are the sites for Franklin county OH: https://wireless2.fcc.gov/UlsEntry/attachments/attachmentViewRD.jsp?applType=search&fileKey=66518254&attachmentKey=21989782&attachmentInd=applAttach
    • Yep, there is a label on the side of the box but it doesn't provide any useful info that the city doesn't already provide (Crown Castle Solutions is the franchisee). You can see my graphical interpretation of the city's dataset here.
    • T-Mobile UScellular agreement links from SEC filings: https://www.sec.gov/ix?doc=/Archives/edgar/data/821130/000110465924065665/tm2415626d2_8k.htm Look inside for main link. Credit mdav-dos1 on reddit
    • Totally agree.  In my county and surrounding counties, TM did not place n-41 on every site.  When I look at the sites in question, I probably would have not placed it there either.  I can find just a few with n-71 only and in most of those cases if you live there and know the probable usage of the residents, you would not do a full upgrade on those sites.  One site in particular is set up to force feed n-71 through a long tunnel on the Turnpike.  No stopping allowed in the tunnel. No stores, movie theaters, bathrooms, so n41 would be a waste.    n25 is not really needed either, so it is not there.  The tunnel is going through & under a mountain with more black bears than people.  TM was smart.  Get good coverage in the tunnel but do not waste many many thousands of dollars with extra unused spectrum. I also see sites with only n71 & n25.  Again this makes sense to me.  Depending on what county we are talking about, they moved much of their b25 from LTE to nr.  Some counties have more n25 than a neighboring county, but luckily, it is plenty everywhere.   When you are in a very rural area, n41 can run up the bills and then be barely used.  I am NOT finding sites that should have had n41 but TM failed to provide it.  They may have to come back later in a few years and upgrade the site to n41.  However, we just may eventually see the last little piece on Band 25 leave LTE and move to n25. I am not sure if the satellite to phone service is using band 25 G block as LTE or nr. We also can possibly have at least some AWS move from LTE to nr at some point.  Yes, everybody wants n41. it is not justified in some cases.  When I travel, I desire some decent service along the entire route but it does not have to be 1 or 2 gig download.   If I can get 50/5 on a speedtest with data that will flow and not stutter, I am very happy. Yes, they will swap out the USC gear.  TM needs to match their existing network. The USCC equipment did the job for years, but it is time to retire it.
    • Lots of time if you can get close to the pole, you will see a sticky label on the box that is low enough to read. Most of the time it warns of RF exposure but also it may have a toll free number to call if there is an issue. Sometimes there is a power company meter with the name of the user. I would be surprised if there was nothing there to help identify it.  Thinking further, if this is multi-Tenant oDAS, then maybe you might only see some name like Crown Castle or maybe even a department in the city government.   An app on your phone may show the carrier(s)
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...