Jump to content

Recommended Posts

No, it was a later market. They might have been in pre-planning at that point.

 

 

Sent from Josh's iPhone 5 using Tapatalk 2

 

Yeah I believe Chicago was supposed to be the other Xohm launch market.

Link to comment
Share on other sites

Yes Sprint  will continue to support the 4g wimax devices until 2015, after that people who have 4g wimax devices will  get offers for 4g lte devices  or they can continue using their 4g wimax devices in 3g mode.

 

We shall see.  I am not sure that any special offers will come to fruition for WiMAX device users.  If Sprint stops offering any WiMAX capable devices this year -- and that is almost assured -- then any device buyers will be eligible for a subsidized upgrade anyway by the time that the WiMAX network is decommissioned.

 

AJ

Link to comment
Share on other sites

That's funny me and a buddy were actually discussing what it would have been like had Sprint finished Xohm nationwide and could have potentially followed up with WiMax 2 as Verizon was just starting to roll out its LTE network...

 

The results would have been highly mixed.  WiMAX coverage collocated with all Sprint sites would have been spotty, but it would have taken much of the load off of the EV-DO network, which then would have been less congested.  But the patchy WiMAX footprint would have meant a lot of signal switching between WiMAX and EV-DO at the device level.  Plus, WiMAX would always have operated from its own baseband, would never have been integrated into the CDMA2000 baseband, meaning that smartphones would have been stuck with multiple chipsets.  In short, battery life would have continued to be poor.

 

AJ

  • Like 1
Link to comment
Share on other sites

Not to mention that Wimax has a 10 dBm weaker signal than LTE.  I am not sure if Wimax 2 would have improved on the overall signal strength than on LTE.  If you combine the fact that Wimax was deployed on 2.5 GHz and the Wimax weaker signal than LTE the coverage would still be spotty.

 

I know Sprint got into the LTE game later than they would have liked to but I know in the long run it is a better move than to stick with Wimax 2.

Link to comment
Share on other sites

We shall see.  I am not sure that any special offers will come to fruition for WiMAX device users.  If Sprint stops offering any WiMAX capable devices this year -- and that is almost assured -- then any device buyers will be eligible for a subsidized upgrade anyway by the time that the WiMAX network is decommissioned.

 

AJ

 

Special offesr:

 

Sprint changes terms of service to give WiMAX customers more flexibility to switch to LTE

 

Read more: Sprint changes terms of service to give WiMAX customers more flexibility to switch to LTE - FierceWireless http://www.fiercewireless.com/story/sprint-changes-terms-service-give-wimax-customers-more-flexibility-switch-l/2013-06-14#ixzz2WD4JfmLc 

Subscribe at FierceWireless

  • Like 1
Link to comment
Share on other sites

Not to mention that Wimax has a 10 dBm weaker signal than LTE.

 

Define what you mean by that.  Signal strength is dependent upon a great many variables.

 

AJ

Link to comment
Share on other sites

 

 

Not to mention that Wimax has a 10 dBm weaker signal than LTE.

 

 

Define what you mean by that. Signal strength is dependent upon a great many variables.

 

AJ

I think he is referring to a point I commonly make that WiMax signal faded to unusable around -82dBm RSSI, whereas LTE does around -93dBm RSSI.

 

Robert via Nexus 7 using Tapatalk 4 Beta

 

 

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Similar Content

  • Posts

    • Since this is kind of the general chat thread, I have to share this humorous story (at least it is to me): Since around February/March of this year, my S22U has been an absolute pain to charge. USB-C cables would immediately fall out and it progressively got worse and worse until it often took me a number of minutes to get the angle of the cable juuuussst right to get charging to occur at all (not exaggerating). The connection was so weak that even walking heavily could cause the cable to disconnect. I tried cleaning out the port with a stable, a paperclip, etc. Some dust/lint/dirt came out but the connection didn't improve one bit. Needless to say, this was a MONSTER headache and had me hating this phone. I just didn't have the finances right now for a replacement.  Which brings us to the night before last. I am angry as hell because I had spent five minutes trying to get this phone to charge and failed. I am looking in the port and I notice it doesn't look right. The walls look rough and, using a staple, the back and walls feel REALLY rough and very hard. I get some lint/dust out with the staple and it improves charging in the sense I can get it to charge but it doesn't remove any of the hard stuff. It's late and it's charging, so that's enough for now. I decide it's time to see if that hard stuff is part of the connector or not. More aggressive methods are needed! I work in a biochem lab and we have a lot of different sizes of disposable needles available. So, yesterday morning, while in the lab I grab a few different sizes of needles between 26AWG and 31 AWG. When I got home, I got to work and start probing the connector with the 26 AWG and 31 AWG needle. The stuff feels extremely hard, almost like it was part of the connector, but a bit does break off. Under examination of the bit, it's almost sandy with dust/lint embedded in it. It's not part of the connector but instead some sort of rock-hard crap! That's when I remember that I had done some rock hounding at the end of last year and in January. This involved lots of digging in very sandy/dusty soils; soils which bare more than a passing resemblance to the crap in the connector. We have our answer, this debris is basically compacted/cemented rock dust. Over time, moisture in the area combined with the compression from inserting the USB-C connector had turned it into cement. I start going nuts chiseling away at it with the 26 AWG needle. After about 5-10 minutes of constant chiseling and scraping with the 26AWG and 31AWG needles, I see the first signs of metal at the back of the connector. So it is metal around the outsides! Another 5 minutes of work and I have scraped away pretty much all of the crap in the connector. A few finishing passes with the 31AWG needle, a blast of compressed air, and it is time to see if this helped any. I plug my regular USB-C cable and holy crap it clicks into place; it hasn't done that since February! I pick up the phone and the cable has actually latched! The connector works pretty much like it did over a year ago, it's almost like having a brand new phone!
    • That's odd, they are usually almost lock step with TMO. I forgot to mention this also includes the September Security Update.
    • 417.55 MB September security update just downloaded here for S24+ unlocked   Edit:  after Sept security update install, checked and found a 13MB GP System update as well.  Still showing August 1st there however. 
    • T-Mobile is selling the rest of the 3.45GHz spectrum to Columbia Capital.  
    • Still nothing for my AT&T and Visible phones.
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...