Commuters rejoice or nightmare? Grand Central


Recommended Posts

While commuting to work this morning on MetroNorth, the railroad put a copy of their monthly newsletter on all the seats. Interestingly enough, they officially stated that cell service is coming to the Park Avenue tunnel. This tunnel is the main artery between Grand Central and the outdoor world, and all MetroNorth trains travel through it. Interestingly enough, the big carriers have contracted Ericsson to provide the cell coverage throughout the tunnel and public WiFi in the terminal. AT&T, Sprint, T-mobile, and Verizon are all funding the project and it will take up to two years to complete. This announcement will soon be posted on MTA.info under the MetroNorth Mileposts section, but I was able to find an earlier report here: http://gothamist.com...g_to_grand.php

 

Will this be a good thing for commuters or will it turn out to be annoying with people screaming "I'm in the tunnel can you hear me?" into their phones? Only time will tell!

  • Like 3
Link to comment
Share on other sites

The link should work now. The period at the end screwed up the link. Anyway, Sprint is part of this. I think it will be a good thing too, as long as people do not abuse it. Will be nice to be able to stream radio now in the tunnels and continue to work if needed.

Link to comment
Share on other sites

The link should work now. The period at the end screwed up the link. Anyway, Sprint is part of this. I think it will be a good thing too, as long as people do not abuse it. Will be nice to be able to stream radio now in the tunnels and continue to work if needed.

 

I have been a victim of links with punctuation directly after them. :doh:

 

Robert via Nexus 7 with Tapatalk HD

  • Like 1
Link to comment
Share on other sites

Is it really that difficult to deploy cells in transit tunnels? I don't understand why subway coverage isn't widespread.

 

If you've ever seen the NY subway system, the infrastructure there is probably order than both of us. I can imagine how hard it would be to run antennas and repeaters throughout the stations without affecting service.

  • Like 1
Link to comment
Share on other sites

Is it really that difficult to deploy cells in transit tunnels? I don't understand why subway coverage isn't widespread.

 

I am not signal guru, but the tunnels have metal framing (steel probably?), which probably absorbs a good deal of the signal. Also, within the tunnels, space is limited, so fitting the required equipment might also be tough in some areas. Another planning nightmare is that the system runs 24/7 365 (unless there is a hurricane), which means there is not a lot of down time to deploy the network. Sure there is the FastTrack program that suspends a select line at night for a few nights, but this is mainly for track and station work. The MTA also requires any outside contractor to attend training to work in the tunnels. Thus, cell operators were probably not in any hurry to install below ground.

Link to comment
Share on other sites

I am not signal guru, but the tunnels have metal framing (steel probably?), which probably absorbs a good deal of the signal. Also, within the tunnels, space is limited, so fitting the required equipment might also be tough in some areas. Another planning nightmare is that the system runs 24/7 365 (unless there is a hurricane), which means there is not a lot of down time to deploy the network. Sure there is the FastTrack program that suspends a select line at night for a few nights, but this is mainly for track and station work. The MTA also requires any outside contractor to attend training to work in the tunnels. Thus, cell operators were probably not in any hurry to install below ground.

 

Stupid FastTrack screwing up my weekends on the 7 train.

  • Like 3
Link to comment
Share on other sites

Is it really that difficult to deploy cells in transit tunnels? I don't understand why subway coverage isn't widespread.

 

I know part of it is finding the room to store the equipment, especially in NYC where the system is so old and was never designed for the amount of telecommunications and electrical components we have. You can see this in pictures of the original tunnels, without 4,247 pipes per station, and current looks of stations. There isn't a lot of available space underground to build new telecommunications rooms. And, those rooms need to be air conditioned, as they discovered with the countdown clocks shutting down in extreme heat.

  • Like 2
Link to comment
Share on other sites

  • 2 weeks later...

Stupid FastTrack screwing up my weekends on the 7 train.

 

Not to make this a MTA NYCT Discussion but the weekend work on the 7 is to Install "Communications Based Train Control" when the R188 comes out the 7 will be computer controlled for hopefully more trains during rush hour.

Link to comment
Share on other sites

Not to make this a MTA NYCT Discussion but the weekend work on the 7 is to Install "Communications Based Train Control" when the R188 comes out the 7 will be computer controlled for hopefully more trains during rush hour.

 

I just hope that means more local trains. I've been at the 40th street / Lowery St. station and had to skip a few trains because they were packed.

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Similar Content

  • Posts

    • The Kendall/Kerr/Gillespie PCS swap is a very nice win-win for AT&T and T-Mobile. Means both of them will have a 20x20 PCS channel, though in exchange T-Mobile goes from 10x10 to 5x5 on one of their spectrum blocks. I figure AT&T will start running n2 DSS on that channel, as they have enough customers in those areas to need the capacity, while T-Mobile will probably just run B2 LTE, as once Auction 108 finally clears they'll have plenty of n41 to play with. Guessing we'll see the non-G-block 5x5 slice running n25, but it would get aggregated with n71 rather than n41 I figure as n71 will remain 20x20 there until the STA goes away (and maybe after that, as if T-Mobile gets 700 MHz as the result of VZW buying West Central Wireless's spectrum there's no reason to run LTE in 600). Which makes me think that the next move is T-Mobile trading 700A for the 5x5 of orphaned PCS (E block) to VZW once the WCW transaction closes, as that would give VZW 20x20 PCS in the area, and would give T-Mobile 700 MHz in an area where they have none. Then VZW can either trade 700B to T-Mobile as well in exchange for the AWS I block in those areas (gives T-Mobile 10x10 B12, gives VZW 15x15 B66) or they can cut a deal with AT&T to give AT&T 10x10 B12 (AT&T has the lower C block), but I'm not sure what that deal would be if trading like for like (vs. AT&T handing VZW their upper tiny slice of B5, giving VZW 15x15 to play with in that band post-WCW-acquisition). EDIT: Just looked at AWS spectrum again, and if AT&T would rather have 10x10 B12 than 2x 10x10 AWS, they could swap AWS-D for VZW's 700B block. That would give VZW 20x20 AWS, and would take AT&T down to 10x10 + 5x5...which they'd likely be fine with as they have 20x20 PCS, small cells in the busy areas, and as a result of the transaction three 10x10 chunks of spectrum in the area below 1 GHz. And if VZW traded 700A to T-Mobile for PCS-E VZW would have 20x20 PCS as well. Which is quite useful in an area that's macro-only for VZW and likely not dense enough for proper mobile usage of CBRS or C-Band (and an area where VZW doesn't even run DSS now).
    • Yeah, $250 credit for an S22 is awful. tbf last year they didn't have solid upgrade credits until mid-late April, which is when I paid $225 to swap my S21 for an S22. Happy to wait 'til then for that kind of deal, though I'll be annoyed at battery life in the mean time.
    • Miserable upgrade credits from Samsung this year unless you want to rely on carrier financing. Sticking with S22U for a while. 
    • So far we've documented close to 100 Sprint conversions in NYC with permits still rolling in and that's only what we've identified manually. Tons of sites get converted/updated without permits so there's potentially a lot more that we haven't spotted yet. There are also dozens of sites that are still broadcasting the keep PLMN, some have been decommissioned but historically the vast majority have been converted.