Most time all new 8t8r sites average 45 55 mbps down and off peak early mornings and after midnight 95 to 115 mbps. Only thing late band 26 very bad sub 1.5mbps. So indoors not good at all. I see no new sites add or completed nv 1.0 only like 4 or 5 sites need backhaul mostly rural area.

Link to comment
Share on other sites

Most time all new 8t8r sites average 45 55 mbps down and off peak early mornings and after midnight 95 to 115 mbps. Only thing late band 26 very bad sub 1.5mbps. So indoors not good at all. I see no new sites add or completed nv 1.0 only like 4 or 5 sites need backhaul mostly rural area.

Subsequently I actually have Boost Mobile now and I'm going down to Delaware very soon why 1415 weeks I really hope they improve the service in Rehoboth Beach... Does Rehoboth Beach at least have decent service

 

Sent from my LG-H900 using Tapatalk

Link to comment
Share on other sites

  • 2 weeks later...

So i was think today how would they do volte if coverage drops 3g alot ,lot dead areas in delaware and densifacation going be forever . 2017 maybe volte but i would not hold my breath . I think band 41 is doing ok but needs more work.

Link to comment
Share on other sites

Don't think Sprint is ever going to have 4g in lower Cecil county just not needed, Verizon and AT&T are letting coverage slip down here also at one time I could pull 20 to 30 mbps I'm lucky if I pull 1 mbps now, it could be cell shrinkage.

Link to comment
Share on other sites

What hell splash spending.most nv 1.0 done just need backhaul .

 

They aren't slashing NV 1.0 spending, which has already been financed. Sprint is pushing NGN (mass B41 small cell) back into their FY 2017, which doesn't align with the calendar year.

Link to comment
Share on other sites

I wouldn't count on it. They are slashing spending on network vision...

 

Sent from my SM-N910T using Tapatalk

 

That's not quite accurate. The reduced their expected CAPEX spending, which is generally a response to slower permitting progress on small cells. Marcelo also said that if they are able to kick up small cell / new macro deployment, CAPEX will increase accordingly. 

Link to comment
Share on other sites

That's not quite accurate. The reduced their expected CAPEX spending, which is generally a response to slower permitting progress on small cells. Marcelo also said that if they are able to kick up small cell / new macro deployment, CAPEX will increase accordingly.

So if they kick up their macro cell deployment the rest of network vision will complete?

 

Sent from my SM-N910T using Tapatalk

Link to comment
Share on other sites

So if they kick up their macro cell deployment the rest of network vision will complete?

 

Sent from my SM-N910T using Tapatalk

 

That was not what my post was talking about. I was talking about new deployments. That is different funding than the network vision project, which is largely complete. 

Link to comment
Share on other sites

That was not what my post was talking about. I was talking about new deployments. That is different funding than the network vision project, which is largely complete.

Ok I m sorry for the misunderstanding

 

Sent from my SM-N910T using Tapatalk

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • Was in Red Hook again and I swear there are more Link5G sites as there are Verizon, T-Mobile, and AT&T small cells combined in the entire neighborhood. It seemed like every other street I turned down had one installed. Hopefully carriers will start hopping on them soon. Seems like a lot of effort to go through for no one to use them.  — — — — — T-Mobile converted the Sprint site on top of NYU Langone Brooklyn in Sunset Park. I first mapped one sector of it back in November 2023 but I thought it was a small cell so I never pinned it but I ran into another sector today which caught me off guard. I'm unable to find a permit for the conversion so it's definitely a surprise. There's another T-Mobile site 1 block away that T-Mobile initially installed back in 2019 so I'm kinda surprised they're keeping both considering the Sprint conversion is on a much taller building and coule potentially provide much better coverage to the entire area. 
    • Still not seeing any ULS postings for pending T-Mobile UScellular merger in Dane county Wisconsin.
    • Came across another Crown Castle Solutions multi-tenant oDAS node in Brooklyn. Located at 40.7002286, -73.9612666. Nothing on T-Mobile or AT&T so I'm assuming these are all Verizon nodes that Crown Castle is anticipating another carrier will hop on down the line.
    • Same with factory unlocked
    • June security update is out (S22U TMO)
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...