Jump to content

Recommended Posts

With all the LTE talk I thought I would pass on some info on the Iden Thinning project I came across. Looks like Sprint has completed the initial iden thin. That 800 Mhz is getting freed up.

 

 

Iden Thinning team,

 

Last night, we took the last of our 9700 IDEN cell sites off air in our IDEN Thinning project. Today, we celebrate our accomplishment of delivering an on-time, significant OPEX savings to Sprint. Exactly how much savings? Well don't quote me on this, but if you estimate the per site cost of Power ($3000), Telco ($300) and Rent ($2500), that's a savings of $5800 monthly / $69,600 annually. For 9700 cell sites, that's an annual savings of $675,120,000. You should feel proud that you are part of helping Sprint to achieve this goal.

 

While we know that IDEN shutdown is the best financial decision for Sprint, it is a bittersweet moment for many of us who helped build the IDEN network. You may remember the day that the first nationwide coast-to-coast IDEN Direct Connect call was made (and $20 to you if you can remember where it was made from and to… Irvine to Boston?). And I'd bet that some of you still answer affirmative questions with the response of "10-4." These experiences have helped us to build a strong Sprint.

 

While the Thinning portion of the project is complete, we need to continue delivering on the following Thinning items:

- Power Down of 9700 cell sites - this is where those OPEX savings start adding up, and we need to deliver them on time. Our FSO Ops team has already powered off 4153 cell sites. The Power and Energy team has already turned off commercial power to 993 sites.

- RF Optimization - continuing to optimize Urban after sites have been Thinned.

- BDA Reorients - we're close to wrapping up 983 BDA's that have been successfully repointed to non-Thinned sites. This was a last minute addition to the project with only 2 weeks to plan for it.

- Cell Site Restorals - Sprint did not want us to put Thinned sites back on air post-Thinning. Well, some IDEN customers want their Push To Talk, and we're up to 92 Thinned cell sites back on air.

- IDEN Decom of 9700 sites - while this work was awarded to other vendors, we need to count the work that we do to support it.

Great job everyone!

Edited by S4GRU
Edited for readability
  • Like 11
Link to comment
Share on other sites

I wish Sprint would continue to thin out more towers. 9700 cell sites are great and all but I would like to see at least half of all iDEN sites to be gone by the end of 2012.

Link to comment
Share on other sites

Well I believe the Iden Network will be turned down by the end of 2013 from what I read/hear. I know several people who were on the Nextel network side and it will be a sad day, but necessary. I find myself rooting for Sprint since they are an underdog and unless they free up spectrum and capital it will not matter how many iPhones they sell.

Link to comment
Share on other sites

With all the LTE talk I thought I would pass on some info on the Iden Thinning project I came across. Looks like Sprint has completed the initial iden thin. That 800 Mhz is getting freed up.

 

Thanks for the post. Appreciate the update.

 

Robert

Link to comment
Share on other sites

 

 

It can still benefit Sprint and Clearwire in both ways. WiMAX needs to be phased out soon for full LTE power!

 

I believe Sprint and Clearwire are committed to running the Wimax network for a while.

Link to comment
Share on other sites

I believe Sprint and Clearwire are committed to running the Wimax network for a while.

 

You are right. It takes time to deploy LTE, and Clearwire needs to keep WiMAX up and running to pay for operation cost. Another fact is WiMAX is still more efficient than iDEN and EVDO.

Link to comment
Share on other sites

 

 

You are right. It takes time to deploy LTE, and Clearwire needs to keep WiMAX up and running to pay for operation cost. Another fact is WiMAX is still more efficient than iDEN and EVDO.

 

I'm curious, efficienct in which way?

Link to comment
Share on other sites

Thinning doesn't free up spectrum. Just gets rid of the sites that were there for capacity reasons.

 

I don't agree on the $3000 a month for electric. I can't see iden equipment being that much of a power hog. Maybe twice or three times that of a CDMA site I could see. That would still put it around 500. A cdma site that I posted pictures of that you can access the meter and breaker from two foot from the street with the sprint sticker on the meter, only pulls about 150 to maybe 200 a month worth of electric.

 

Sent from my C64 w/Epyx FastLoad cartridge

  • Like 2
Link to comment
Share on other sites

Where any site's in Delaware thinned.

 

gallery_1_2_36148.jpg

 

I have an iDEN thinning map from my iDEN Thinning Article: http://s4gru.com/index.php?/blog/1/entry-142-sprint-continues-nextel-iden-site-thinning-measures-at-full-steam-ahead/

 

But Delaware is not in its own market, so its tough to say. But I bet there were some sites removed there too.

 

Robert

  • Like 1
Link to comment
Share on other sites

Thinning doesn't free up spectrum. Just gets rid of the sites that were there for capacity reasons.

 

I don't agree on the $3000 a month for electric. I can't see iden equipment being that much of a power hog. Maybe twice or three times that of a CDMA site I could see. That would still put it around 500. A cdma site that I posted pictures of that you can access the meter and breaker from two foot from the street with the sprint sticker on the meter, only pulls about 150 to maybe 200 a month worth of electric.

 

Sent from my C64 w/Epyx FastLoad cartridge

 

I thought the ac units where the real power suckers?

 

Not that hard to do the math. 3000 does sound Like a lot.

 

I'll look up some more info and see if I can get a better number

  • Like 1
Link to comment
Share on other sites

 

 

I thought the ac units where the real power suckers?

 

Not that hard to do the math. 3000 does sound Like a lot.

 

I'll look up some more info and see if I can get a better number

 

 

I think thats low, Sprint hopes to save almost a billion by shutting these sites down early.

Link to comment
Share on other sites

I wonder how much savings will there be in WiMAX Thinning once Clearwire starts deploying LTE.

 

I'd guess that the amount would be negligible since LTE is going on existing WiMAX sites.

 

Sent from my PG86100 using Tapatalk 2

Link to comment
Share on other sites

 

It can still benefit Sprint and Clearwire in both ways. WiMAX needs to be phased out soon for full LTE power!

 

They're committed to WiMAX until 2015. Besides they have more than enough spectrum to run LTE and WiMAX concurrently and they're getting mileage out of WiMAX via Virgin and Boost. There's no reason to be in a rush to put it out to pasture.

 

Sent from my PG86100 using Tapatalk 2

Link to comment
Share on other sites

I thought the ac units where the real power suckers?

 

Not that hard to do the math. 3000 does sound Like a lot.

 

I'll look up some more info and see if I can get a better number

Thinning doesn't free up spectrum. Just gets rid of the sites that were there for capacity reasons.

 

I don't agree on the $3000 a month for electric. I can't see iden equipment being that much of a power hog. Maybe twice or three times that of a CDMA site I could see. That would still put it around 500. A cdma site that I posted pictures of that you can access the meter and breaker from two foot from the street with the sprint sticker on the meter, only pulls about 150 to maybe 200 a month worth of electric.

 

Sent from my C64 w/Epyx FastLoad cartridge

Thinning doesn't free up spectrum. Just gets rid of the sites that were there for capacity reasons.

 

I don't agree on the $3000 a month for electric. I can't see iden equipment being that much of a power hog. Maybe twice or three times that of a CDMA site I could see. That would still put it around 500. A cdma site that I posted pictures of that you can access the meter and breaker from two foot from the street with the sprint sticker on the meter, only pulls about 150 to maybe 200 a month worth of electric.

 

Sent from my C64 w/Epyx FastLoad cartridge

I thought the ac units where the real power suckers?

 

Not that hard to do the math. 3000 does sound Like a lot.

 

I'll look up some more info and see if I can get a better number

Thinning doesn't free up spectrum. Just gets rid of the sites that were there for capacity reasons.

 

I don't agree on the $3000 a month for electric. I can't see iden equipment being that much of a power hog. Maybe twice or three times that of a CDMA site I could see. That would still put it around 500. A cdma site that I posted pictures of that you can access the meter and breaker from two foot from the street with the sprint sticker on the meter, only pulls about 150 to maybe 200 a month worth of electric.

 

Sent from my C64 w/Epyx FastLoad cartridge

 

I bet $3000 might be close, depending on site and time of year. In the 100+ degrees plus here in ks plus the equipment heat plus what it cost to power the old equipment.

Link to comment
Share on other sites

 

I bet 3000 might be close' date=' depending on site and time of year. In the 100+ degrees plus here in ks plus the equipment heat plus what it cost to power the old equipment.[/quote']

 

And AJ plugging his spectrum analyzer in to the nextel enclosure...

 

Sent from my Nexus 7 (nakasi) using Forum Runner

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • I think the push for them is adding US Mobile as a MVNO with a priority data plan.  Ultimately, making people more aware of priority would allow them (and other carriers) to differentiate themselves from MVNOs like Consumer Cellular that advertise the same coverage. n77 has dramatically reduced the need for priority service at Verizon where the mere functioning of your phone was in jeopardy a couple of years ago if you had a low priority plan like Red Pocket. Only have heard of problems with T-Mobile in parts of Los Angeles. AT&T fell in between. All had issues at large concerts and festivals, or sporting events if your carrier has no on-site rights. Edit: Dishes native 5g network has different issues: not enough sites, limited bandwidth. Higher priority would help a few. Truth is they can push phones to AT&T or T-Mobile.
    • Tracfone AT&T sims went from QCI 8 to 9 as well a couple years ago. I'm pretty neutral towards AT&T's turbo feature here, the only bad taste left was for those who had unadvertised QCI 7 a couple months ago moved down to 8. In my eyes it would have been a lot better for AT&T to include turbo in those Premium/Elite plans for free to keep them at QCI 7, while also introducing this turbo add on option for any other plans or devices. As it stands now only a handful of plans can add it, and only if you're using a device on a random list of devices AT&T considers to be 5G smartphones.
    • My Red Pocket AT&T GSMA account was dropped to QCI 9 about a year ago.  Most recently 8 for the last few years prior.  Voice remains at 5.
    • https://arstechnica.com/tech-policy/2024/05/att-announces-7-monthly-add-on-fee-for-turbo-5g-speeds/ Hopefully we don't ever see T-Mobile do something like this. Based on how I was treated with my Credit Limit, it's definitely not the same company it was before the merger, and it's entirely possible they'd try it.
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...