just does not make sense to have all these ground mounted areas. Seems every tower all the way to cruces along the highway is.

 

Sent from my SPH-L900 using Tapatalk 2

I wonder what Phoenix and Tucson markets look like as well. If they are concerned about the wind in ABQ market they must be concerned there as well?

 

Edit: I feel like this should be a no brainer for the ABQ market just do to the size of the market.

Link to comment
Share on other sites

just does not make sense to have all these ground mounted areas. Seems every tower all the way to cruces along the highway is.

 

Sent from my SPH-L900 using Tapatalk 2

 

Most of these interstate sites are guyed towers. However, Sprint was able to deploy NV panels and RRU's on most of the guyed sites in Kansas. I think it comes down to an ultra conservative engineer here. That's my guess.

 

Robert

Link to comment
Share on other sites

 

 

Most of these interstate sites are guyed towers. However, Sprint was able to deploy NV panels and RRU's on most of the guyed sites in Kansas. I think it comes down to an ultra conservative engineer here. That's my guess.

 

Robert

We need to pay this engineer a visit. Maybe he doesn't have Sprint, if he did he would be less conservative ;)

Link to comment
Share on other sites

I think it comes down to an ultra conservative engineer here.

 

Hmm, then we need to send that engineer to Cal-Berkeley for some continuing education.

 

;)

 

AJ

  • Like 4
Link to comment
Share on other sites

I wonder what Phoenix and Tucson markets look like as well. If they are concerned about the wind in ABQ market they must be concerned there as well? Edit: I feel like this should be a no brainer for the ABQ market just do to the size of the market.

 

I just checked the Phoenix and Tucson/Yuma markets. They do not have any Ground Mount RRU's noted. They just have No 800 sites in the International boundary zone.

 

Robert

Link to comment
Share on other sites

Hmm, then we need to send that engineer to Cal-Berkeley for some continuing education. ;) AJ

 

For some re-engineering? :lol:

 

Robert

  • Like 3
Link to comment
Share on other sites

I would think Sprint corporate would wonder why nm seems to be an anomaly with ground mounts. I move that we start a petition (once all the sites are done). ;)

 

Sent from my SPH-L900 using Tapatalk 2

 

 

  • Like 1
Link to comment
Share on other sites

For some re-engineering? :lol:

 

Yes, a liberal dose of it.

 

AJ

  • Like 1
Link to comment
Share on other sites

I just checked the Phoenix and Tucson/Yuma markets. They do not have any Ground Mount RRU's noted. They just have No 800 sites in the International boundary zone.

 

Robert

 

Is engineering performed by Ericsson or is it performed by Sprint in KC?

 

I would assume it would be performed by someone by Ericsson but you know what happens when you assume. You are wrong.

Link to comment
Share on other sites

Is engineering performed by Ericsson or is it performed by Sprint in KC?

 

I would assume it would be performed by someone by Ericsson but you know what happens when you assume. You are wrong.

 

There was a site visit to each site to do a site assessment before design work even started. An Ericsson rep and a Sprint rep did this assessment. They looked at each site and where and how cabinets, RRU's and panels would/could be installed. It was likely during site assessment that it was determined that they needed to go Ground Mount at these sites. Either because logistically it was too difficult to do anything but ground mount, or for structural reasons. But I disagree with a lot of their assessments.

 

Robert

Link to comment
Share on other sites

a7uhupy3.jpg

y4e6ybap.jpg

 

Here is the site I saw the van at. I didn't see new panels or rrus, can anyone tell by the cabinets? If it was nv, they could have been scoping out before starting work or it could be backhaul related

Sent from my SPH-L900 using Tapatalk 2

 

 

Link to comment
Share on other sites

 

Here is the site I saw the van at. I didn't see new panels or rrus, can anyone tell by the cabinets? If it was nv, they could have been scoping out before starting work or it could be backhaul related

Sent from my SPH-L900 using Tapatalk 2

 

I see legacy Nortel cabinets for sure. But I'm not certain I see anything that looks like new Ericsson NV cabinets.

 

Robert

Link to comment
Share on other sites

 

I see legacy Nortel cabinets for sure. But I'm not certain I see anything that looks like new Ericsson NV cabinets.

 

Robert

I didn't think I saw new cabinets based on the pictures of your site. I will go look again next weekend.

 

Sent from my SPH-L900 using Tapatalk 2

 

 

Link to comment
Share on other sites

I just checked the Phoenix and Tucson/Yuma markets. They do not have any Ground Mount RRU's noted. They just have No 800 sites in the International boundary zone.

 

Robert

 

How is the Vegas Market for ground mounted RRU's?

Link to comment
Share on other sites

How is the Vegas Market for ground mounted RRU's?

 

.

A picture is worth a thousand words:

.

 

<iframe frameborder="0" height="650" scrolling="no" src="http://batchgeo.com/map/156625d8a385c40678362b87e1baae86" style="border: 1px solid rgb(170, 170, 170);" width="100%"></iframe>

 

49 sites out of 415.

Link to comment
Share on other sites

.

A picture is worth a thousand words:

.

 

<iframe frameborder="0" height="650" scrolling="no" src="http://batchgeo.com/map/e8ba36e8e9763dfcb50e4b0e056db98e" style="border: 1px solid rgb(170, 170, 170);" width="100%"></iframe>

 

49 sites out of 415.

 

So that means those sites won't get LTE or just 800?

Link to comment
Share on other sites

So that means those sites won't get LTE or just 800?

 

In the Sprint documents, they say that these sites with Ground Mount RRU's will not get 800MHz service. They do not address LTE at all. One of my concerns is that they may not replace the panels on these sites also, based on some other things I have seen lately. And if they do not replace the panels at these Ground Mount RRU sites,I'm thinking they may not get LTE either. I want to see some sites that are labelled Ground Mount RRU No 800 go live with LTE until I feel that is not the case.

 

Here are some permit drawings for a site in Florida: http://www.mywakulla...-12/SP12-16.pdf . In my docs it says that this is a "Ground Mount RRU - No 800" site. However, in the permit drawings, they call it "Ground Mount - No Touch". No Touch meaning they reuse the existing panels. And clearly it says in these drawings there is no LTE, just CDMA 1900.

 

Is this the way all Ground Mount No 800 sites will be? I don't know yet. But I'm concerned. There is a Shentel site in Mont Alto, PA that has ground mount RRU's and LTE. But Shentel may be an exception.

 

Robert

Link to comment
Share on other sites

In the Sprint documents, they say that these sites with Ground Mount RRU's will not get 800MHz service. They do not address LTE at all. One of my concerns is that they may not replace the panels on these sites also, based on some other things I have seen lately. And if they do not replace the panels at these Ground Mount RRU sites,I'm thinking they may not get LTE either. I want to see some sites that are labelled Ground Mount RRU No 800 go live with LTE until I feel that is not the case. Robert

 

Yipes! So my trips to Vegas may just be EVDO only? :(

Link to comment
Share on other sites

.

A picture is worth a thousand words:

.

 

<iframe frameborder="0" height="650" scrolling="no" src="http://batchgeo.com/map/e8ba36e8e9763dfcb50e4b0e056db98e" style="border: 1px solid rgb(170, 170, 170);" width="100%"></iframe>

 

49 sites out of 415.

 

At least the ground mounted RRU and No 800 MHz sites are outside of the main city of Las Vegas. I just hope the remainder of the NV sties get 800 MHz and 1900 MHz LTE and CDMA.

Link to comment
Share on other sites

At least the ground mounted RRU and No 800 MHz sites are outside of the main city of Las Vegas. I just hope the remainder of the NV sties get 800 MHz and 1900 MHz LTE and CDMA.

 

All of the towers covering Kingman are ground mount RRU's? If there will be no LTE there, then Sprint would in effect be lying about Network Vision covering their entire footprint. I hope that won't be the case.

Link to comment
Share on other sites

Yipes! So my trips to Vegas may just be EVDO only? :(

 

They may be. I don't know yet. But I fear this may be the case. These rural sites need 800 service the most, though. I think most of the sites are more about ease of upgrade and cost. They could logistically upgrade most of the sites if they wanted.

 

Robert

  • Like 1
Link to comment
Share on other sites

All of the towers covering Kingman are ground mount RRU's? If there will be no LTE there, then Sprint would in effect be lying about Network Vision covering their entire footprint. I hope that won't be the case.

 

I just looked. There are sites in Kingman that are not on the map above.

 

Robert

Link to comment
Share on other sites

The towers on Highway 160 between Pahrump and Vegas are perfectly spaced whether they get 1900 LTE or not, except for one spot on the Vegas side of the Spring Mountains, so I'm not worried, as long as backhaul gets upgraded.

Link to comment
Share on other sites

In the Sprint documents, they say that these sites with Ground Mount RRU's will not get 800MHz service. They do not address LTE at all. One of my concerns is that they may not replace the panels on these sites also, based on some other things I have seen lately. And if they do not replace the panels at these Ground Mount RRU sites,I'm thinking they may not get LTE either. I want to see some sites that are labelled Ground Mount RRU No 800 go live with LTE until I feel that is not the case.

 

Here are some permit drawings for a site in Florida: http://www.mywakulla...-12/SP12-16.pdf . In my docs it says that this is a "Ground Mount RRU - No 800" site. However, in the permit drawings, they call it "Ground Mount - No Touch". No Touch meaning they reuse the existing panels. And clearly it says in these drawings there is no LTE, just CDMA 1900.

 

Is this the way all Ground Mount No 800 sites will be? I don't know yet. But I'm concerned. There is a Shentel site in Mont Alto, PA that has ground mount RRU's and LTE. But Shentel may be an exception.

 

Robert

 

Didn't Sprint officially say that they plan to touch and add LTE all 38,000 of its towers? If that is the case, this is not good news since they are clearly ignoring LTE on these ground mounted RRUs and using the legacy antennas. Why they are still using the legacy antennas instead of the NV antennas for these sites still boggles me. Sprint should just spend all the capital it can to upgrade every single tower site with future proof cell site equipment. I wish Softbank could have a say in it and force Sprint to spend the money to upgrade these ground mounted RRU sites.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • T-Mobile Fires Back At AT&T After Their Statements On T-Priority
    • February is always closer than you think! https://stadiumtechreport.com/news/caesars-superdome-gets-matsing-deployment-ahead-of-super-bowl-lix/ Another Super Bowl, another MatSing cellular antenna deployment. Caesars Superdome, home of the NFL’s New Orleans Saints, has deployed a large number of cellular antennas from MatSing as part of an effort to increase wireless network capacity ahead of the upcoming Super Bowl LIX in February, 2025. It is the third such deployment of MatSing equipment at Super Bowl venues in as many years, following cellular upgrades at Allegiant Stadium for Super Bowl LVIII and at State Farm Stadium for Super Bowl LVII. According to the Saints, the MatSing antennas were part of a large wireless overhaul this offseason, done primarily “to satisfy fans’ desires for wireless consumption and bandwidth,” an important thing with Super Bowl LIX coming to the venue on Feb. 9, 2025. Each year, the NFL’s big game regularly sets records for wireless data consumption, with a steady upward progression ever since wireless networks were first put into stadiums. https://www.neworleanssaints.com/news/caesars-superdome-transformation-2024-new-orleans-saints-nfl-season-part-1-wifi-upgrades-wireless-cellular During the offseason renovation project, the foundation of the facility's new Distributed Antenna System (DAS) was the installation of 16 multi-beam, wideband spherical lense antennas that are seven feet in diameter and weigh nearly 600 pounds apiece, a model called the MatSing MS-48H180. Another 16 large antenna spheres of varying sizes and frequencies have also been installed for a total of 32 new large antennas, in addition to 200 cellular antennas inside and around the building, all of these products specifically made for high-density environments such as stadiums and arenas. The DAS system's performance is expected to enhance further as it becomes fully integrated throughout the season. The MatSing MS-48H180 devices, with a black color that matches the Caesars Superdome's roof, each were individually raised by hoist machines to the top of the facility and bolted into place. Each cellular antenna then transmits 48 different beams and signals to a specific area in the stadium, with each sphere angled differently to specifically target different coverage areas, allowing increased, consistent coverage for high-density seating areas. In addition to creating targets in seating and common areas throughout the stadium, these antennas create dedicated floor zones that result in improved coverage to the field areas for fans in 12 field-level suites and the Mercedes-Benz End Zone Club, teams and on-field media and broadcast elements. The project is also adding 2,500 new wireless access points placed in areas such as concourses, atriums, suites and food and beverage areas for better WiFi coverage.
    • https://www.yahoo.com/news/dallas-county-completes-first-911-194128506.html - First 911 call/text received over Starlink/T-Mobile direct to cell.  This appears to be in Dallas County, MO.
    • FCC: "We remain committed to helping with recovery efforts in states affected by Hurricane Helene. We stand ready to do all that is necessary to return connectivity to hard-hit areas and save lives." SpaceX: "SpaceX and @TMobile have been given emergency special temporary authority by the @FCC to enable @Starlink satellites with direct-to-cell capability to provide coverage for cell phones in the affected areas of Hurricane Helene. The satellites have already been enabled and started broadcasting emergency alerts to cell phones on all networks in North Carolina. In addition, we may test basic texting (SMS) capabilities for most cell phones on the T-Mobile network in North Carolina. SpaceX’s direct-to-cell constellation has not been fully deployed, so all services will be delivered on a best-effort basis." Space posted this at 2pm today on X.
    • https://ibb.co/KrTR877 https://ibb.co/DK3MVgw https://ibb.co/VgWtZwR Should work with these links
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...