Jump to content

Galaxy S24 Info & Discussion


PythonFanPA

Recommended Posts

  • 4 weeks later...

After seeing gr8nuguy's S23 post for one, checked and found a 72MB Google Play System security update on S24+ unlocked. 

 

Still a June 1st date however. 

  • Like 2
Link to comment
Share on other sites

12 hours ago, PythonFanPA said:

431.39 MB July security update now downloading on S24+ unlocked. 

Use cloud features or backup files first before updating with this firmware.  I updated my S24 Ultra with this update.  T-Mobile and Verizon network esims worked fine.  Dish Rainbow sim appeared to work fine.  Right after that, when I rebooted to another non-public test esim which previously worked fine, I got the Samsung Welcome screen.

Link to comment
Share on other sites

  • 2 weeks later...
  • 2 weeks later...
  • 5 weeks later...
8 hours ago, PythonFanPA said:

Checked GP System update on my S24+ and found a 13MB update and installed it, but its still July 1 after the fact.

That's odd, the August 1st play system update is already out for the S22. Usually, it lags the S24 and S23. 

Link to comment
Share on other sites

Checked again this morning and there must have been some auto update push because it just prompted that a restart was required, no front end mention of downloading or dl size.  After restarting, GP Sys version date now shows Aug 1. 

  • Like 2
Link to comment
Share on other sites

Allows continued use to special features of interest to s4gru members.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • New SCP beta rolling out now.. gave this one some extra testing with the hopes that I have finally cleaned up the glitches with 5G NSA web uploads as well as some other minor bugs. Please keep an eye on your upload notification to see if you have an abnormally large number of "clusters" being uploaded compared to the number of pending entries you had. By default, the app includes up to 512 entries per "cluster", but LTE and NR entries are clustered separately.
    • Yup—the current plan is to go with the AT&T site in Greenwater and the Verizon site atop Grass Mountain, although there have been so many problems getting the tower physically built and backhauled that the AT&T site south of 410 is looking like a candidate.  I do some work in the industry; there is a lot a can’t share but some that I can . Permits are a good way to track movement; although permitting happens only very late in the process. 
    • That's really nice to hear--seems like this is the trend nationwide in general. Lots of new collocations planned around rural MI and OH from what I've seen in from the American Tower site portal. Also, the Att site around Greenwater WA got a new Tmo collocations (no n41) but wasn't online when I was around that area.   Btw, how are you able to get information on collocations plans? Are there permits available in those areas?
    • Verizon vs T-Mobile at MetLife Stadium today for the Howard vs Morehouse football game. Verizon has clearly poured a ton of money into MetLife Stadium. Besides mmWave there's also a hidden WiFi network for Verizon customers that I started connecting to from the parking lot. Verizon's mmWave performed great as usual but n41 was no slouch. T-Mobile was running 120MHz n41 in the stadium. No idea why T-Mobile is reporting 1 bar when field test mode was showing -70dbm.
    • T-Mobile is planning on colocating on the Newhalem site that AT&T and VZW are on as well as the site in Trafton. There are no finalized plans to address the coverage gap west and north of Darrington, although it’s being looked at.  It would be nice to see them build out at Lake Cavanaugh too, but no plans to do that yet as far as I’m aware. 
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...