Jump to content

Orange County Cell Sites on High Voltage Power lines finally being converted to Network Vision


Recommended Posts

I had reported a few times the past couple of years that Sprint typically wasn't doing NV upgrades on most of the cell sites that were located on power company utility lattice towers.  More specifically Southern California Edison property towers.  Well I'm happy to report that most of them are finally getting done now including mine which construction began this morning.  With over 95% of all sites already been upgraded it figured that mine would be in the final 5%.  Been a LONG wait and glad it's finally over.  Now I'm just hoping that they don't mess anything up and keep the azimuth pattern the way it's been without modification.

  • Like 8
Link to comment
Share on other sites

I had reported a few times the past couple of years that Sprint typically wasn't doing NV upgrades on most of the cell sites that were located on power company utility lattice towers.  More specifically Southern California Edison property towers.  Well I'm happy to report that most of them are finally getting done now including mine which construction began this morning.  With over 95% of all sites already been upgraded it figured that mine would be in the final 5%.  Been a LONG wait and glad it's finally over.  Now I'm just hoping that they don't mess anything up and keep the azimuth pattern the way it's been without modification.

Are they full build sites with new panels and RRUs are are they GMO sites for now? With the exception of one of our local sites, all of our high voltage power line sites were GMOed. At least we got lucky in that most of them are broadcasting B25 LTE. Our one exception was one site that was built as a full build from the get go. 

 

You're joking by starting a new thread for this right?

I'm not gonna lie, I'll probably be about as happy as the OP when they finally upgrade our site in Shepherdsville KY. Windstream ran fiber back in February of '13 and it has yet to be touched.   :wall:  

Link to comment
Share on other sites

 

 

I'm not gonna lie, I'll probably be about as happy as the OP when they finally upgrade our site in Shepherdsville KY. Windstream ran fiber back in February of '13 and it has yet to be touched. :wall:

We have quite a few of these in Columbus that we're keeping an eye on for conversions.

Link to comment
Share on other sites

We have quite a few of these in Columbus that we're keeping an eye on for conversions.

At least I'm lucky that its one of the very few remaining legacy sites in the market. I watch this and several GMO sites closely for activity since NV 2.0 has started here. Its hard to install 8t8r on a GMO site. 

Link to comment
Share on other sites

mostly all the ones owned my bonneville damn admin in portland/vancouver have been done now.. there be 1 or 2 left.. Now the questionable ones are the Clear sites that could exist one em, I know of 1 for sure that sits at a dog park i frequently go to, I cant find permits for my area as the site has gotten butchered badly, but I know there upgrading my metro area based off the portland ones that were found. soooo ?? who knows

Link to comment
Share on other sites

In the northern part of LA Metro, there are at least 3 LADWP transmission tower installations that have not had any work.  The bulk of the remaining work seems to be:  transmission tower installations, distribution power pole installations and for some reason sites on university and college campuses (not DAS, but macro sites.)

Link to comment
Share on other sites

In the northern part of LA Metro, there are at least 3 LADWP transmission tower installations that have not had any work.  The bulk of the remaining work seems to be:  transmission tower installations, distribution power pole installations and for some reason sites on university and college campuses (not DAS, but macro sites.)

 

Yeah probably because all of those require extra red tape and/or have more challenging installations.  There are plans to convert many of the DAS sites around Malibu, Topanga, Palisades, Studio City, etc but it looks like most of them are planned for 2015.

Link to comment
Share on other sites

Yeah probably because all of those require extra red tape and/or have more challenging installations.  There are plans to convert many of the DAS sites around Malibu, Topanga, Palisades, Studio City, etc but it looks like most of them are planned for 2015.

Do you know more details about this?  LA Metro has a lot of Juni gear that probably isn't compatible with B26 (or B41).  I know Alcatel-Lucent has some small cell equipment.

Link to comment
Share on other sites

All of this talk about cell sites on power lines, and no photos!

:needpic:

(Sorry, I figured this was a pretty good time to use that one. :) )

Look at the first image in this post (legacy equipment):

http://s4gru.com/index.php?/topic/5072-not-complete-maps/?p=357582

  • Like 1
Link to comment
Share on other sites

Look at the first image in this post (legacy equipment):

http://s4gru.com/index.php?/topic/5072-not-complete-maps/?p=357582

Sweet! We don't have many of those around here (though there are plenty of hi-capacity power lines that are in great places for cell sites) and the few that we do have are all VZ or T-Mobile.

Link to comment
Share on other sites

Yeah probably because all of those require extra red tape and/or have more challenging installations.  There are plans to convert many of the DAS sites around Malibu, Topanga, Palisades, Studio City, etc but it looks like most of them are planned for 2015.

 

Can't wait for this.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • Was in Red Hook again and I swear there are more Link5G sites as there are Verizon, T-Mobile, and AT&T small cells combined in the entire neighborhood. It seemed like every other street I turned down had one installed. Hopefully carriers will start hopping on them soon. Seems like a lot of effort to go through for no one to use them.  — — — — — T-Mobile converted the Sprint site on top of NYU Langone Brooklyn in Sunset Park. I first mapped one sector of it back in November 2023 but I thought it was a small cell so I never pinned it but I ran into another sector today which caught me off guard. I'm unable to find a permit for the conversion so it's definitely a surprise. There's another T-Mobile site 1 block away that T-Mobile initially installed back in 2019 so I'm kinda surprised they're keeping both considering the Sprint conversion is on a much taller building and could potentially provide much better coverage to the entire area.  — — — — — The old permit expired for this site without any work being done but a new permit was just approved a few days ago for a T-Mobile site at this address. Description mentions 3 antennas with 2 RRUs per sector. My guess is they're doing something similar to what they did at 360 Furman St in Brooklyn where they broadcast Band 2/66 and n25/41 from one antenna. It's a bit of a downgrade considering the site it's replacing was a full build with Ericsson 6449s. 
    • Still not seeing any ULS postings for pending T-Mobile UScellular merger in Dane county Wisconsin.
    • Came across another Crown Castle Solutions multi-tenant oDAS node in Brooklyn. Located at 40.7002286, -73.9612666. Nothing on T-Mobile or AT&T so I'm assuming these are all Verizon nodes that Crown Castle is anticipating another carrier will hop on down the line.