Jump to content

Broadband Acceleration Initiative


MacinJosh

Recommended Posts

http://www.engadget.com/2013/01/26/fcc-broadband-acceleration-initiative/

 

Apparently the FCC feels that carriers aren't getting approval fast enough to build out their wireless infrastructure and has tweaked the Broadband Acceleration Initiative so that upgrading existing equipment will be easier for carriers so they can build out LTE faster than they are now. This could be a boost for Sprint if they don't have to wait as long for building permits, or this may help most carriers bypass building permits all together.

 

We will know for sure in the coming months. If there is a sudden increase in tower numbers every week, then I guess we will know for sure.

  • Like 9
Link to comment
Share on other sites

http://www.engadget.com/2013/01/26/fcc-broadband-acceleration-initiative/

 

Apparently the FCC feels that carriers aren't getting approval fast enough to build out their wireless infrastructure and has tweaked the Broadband Acceleration Initiative so that upgrading existing equipment will be easier for carriers so they can build out LTE faster than they are now. This could be a boost for Sprint if they don't have to wait as long for building permits, or this may help most carriers bypass building permits all together.

 

We will know for sure in the coming months. If there is a sudden increase in tower numbers every week, then I guess we will know for sure.

 

This has no impact on local building permits and zoning processes. The FCC has no authority to subrogate local and state building laws, codes and ordinances. This is only related to FCC hurdles. Mostly related to small cells and pico cells and reclassifying them and not requiring the same as macro cells.

 

Robert via Nexus 7 with Tapatalk HD

  • Like 1
Link to comment
Share on other sites

This has no impact on local building permits and zoning processes. The FCC has no authority to subrogate local and state building laws, codes and ordinances. This is only related to FCC hurdles. Mostly related to small cells and pico cells and reclassifying them and not requiring the same as macro cells.

 

Robert via Nexus 7 with Tapatalk HD

 

Thanks for the clarification. I wasn't too sure as to what I was reading. Sometimes the FCC makes things confusing. :wacko:

Link to comment
Share on other sites

Thanks for the clarification. I wasn't too sure as to what I was reading. Sometimes the FCC makes things confusing. :wacko:

 

Well, what do you think one of those two Cs stands for?

 

;)

 

AJ

Link to comment
Share on other sites

This has no impact on local building permits and zoning processes. The FCC has no authority to subrogate local and state building laws, codes and ordinances. This is only related to FCC hurdles. Mostly related to small cells and pico cells and reclassifying them and not requiring the same as macro cells.

 

Robert via Nexus 7 with Tapatalk HD

 

I hate to disagree Robert but the FCC can wield power and over ride some local codes and ordinaces when they need to. When your not so busy some time look up PRB-1 and how the FCC can over rule local restrictions on Ham Radio antenna's if they are overly burdensome. I think the rule is reasonable accommodations have to be made and I think its the FCC who decides what is reasonable. I know this isn't ham radio but maybe they are going to expand their power for broadband in a similar way.

Link to comment
Share on other sites

 

I hate to disagree Robert but the FCC can wield power and over ride some local codes and ordinaces when they need to. When your not so busy some time look up PRB-1 and how the FCC can over rule local restrictions on Ham Radio antenna's if they are overly burdensome. I think the rule is reasonable accommodations have to be made and I think its the FCC who decides what is reasonable. I know this isn't ham radio but maybe they are going to expand their power for broadband in a similar way.

 

I repeat...the FCC does not have the authority to overrule building codes and state laws regarding building. That authority has not been given to them. They regulate broadcasts, not structures.

 

Robert via Nexus 7 with Tapatalk HD

Link to comment
Share on other sites

With respect. A small clip from the ARRL.ORG web page.

 

"Amateurs faced with local government zoning restrictions have some relief. PRB-1, the limited federal preemption of municipal land use regulations for Amateur Radio installations, is a useful tool when applying for a building permit for a tower. According to the Commission's rules, zoning authorities can not preclude Amateur Service communications, but must reasonably accommodate amateur communications and enact the "minimum practicable regulation to accomplish the state or local authority's legitimate purpose" [97.15(B)]. Local governments can zone for height, safety and aesthetics concerns, but their restrictions can not be so prohibitive that they are overly restrictive."

 

Individual cases have reversed or repealed local rules agains hams.

An argument could be made that a cell phone company is not an individual tech class up to extra class. They do not operate on the ham net frequencies. So this would not work for any building permits for them. Most hams build their towers on their land unless its a club. Cell providers are for a profit while hams are not out for a profit. Last I knew when I was on a kick again to study to get my ham license, a ham operator can not use his/her station for a profit.

Link to comment
Share on other sites

Link to comment
Share on other sites

According to the FCC's public notice, Congress did override state and local authority in this matter. Whether it's constitutional or not is a separate question, but the law seems pretty unambiguous about Congress' intent:

 

(1) IN GENERAL. Notwithstanding section 704 of the Telecommunications Act of 1996 (Public Law 104–104) or any other provision of law, a State or local government may not deny, and shall approve, any eligible facilities request for a modification of an existing wireless tower or base station that does not substantially change the physical dimensions of such tower or base station.

(2) ELIGIBLE FACILITIES REQUEST. For purposes of this subsection, the term ‘‘eligible facilities request’’ means any request for modification of an existing wireless tower or base station that involves —

(A.) collocation of new transmission equipment;

(B.) removal of transmission equipment; or

(C.) replacement of transmission equipment.

(3) APPLICABILITY OF ENVIRONMENTAL LAWS. Nothing in paragraph (1) shall be construed to relieve the Commission from the requirements of the National Historic Preservation Act or the National Environmental Policy Act of 1969.

  • Like 1
Link to comment
Share on other sites

This is exactly my point. Local jurisdictions cannot control broadcasts. They must allow them. But they still control the building permits and zoning for the structures themselves. And the FCC does not have the authority to take that away. It would require a change in law.

 

Robert via Nexus 7 with Tapatalk HD

 

I see what your saying. I just know one town said ham radio antennas cant be over 13 feet tall and the FCC said it was too restrictive and it was changed.

  • Like 2
Link to comment
Share on other sites

According to the FCC's public notice, Congress did override state and local authority in this matter. Whether it's constitutional or not is a separate question, but the law seems pretty unambiguous about Congress' intent:

 

And none of this removes local bureaucratic planning and permitting. It just means the local jurisdiction cannot deny the permit if it is an existing facility. But they still need to file for local building permits and obtain them and they still have to pass plan review and meet code.

 

Robert via Nexus 7 with Tapatalk HD

Link to comment
Share on other sites

It seems a bit dumb to me that building permits are required for adding or replacing equipment on a tower. I can see it necessary for building a tower, or the little brick buildings that verizon and at&t like to house the cabinets in around here, or when extensive electrical work needs to be done. Alas, I guess it is what it is.

Link to comment
Share on other sites

It seems a bit dumb to me that building permits are required for adding or replacing equipment on a tower. I can see it necessary for building a tower, or the little brick buildings that verizon and at&t like to house the cabinets in around here, or when extensive electrical work needs to be done. Alas, I guess it is what it is.

 

In Vegas, some towers have needed reinforcing to help keep the tower stable in order to support more equipment on the tower, and that goes for all carriers.

Link to comment
Share on other sites

 

In Vegas, some towers have needed reinforcing to help keep the tower stable in order to support more equipment on the tower, and that goes for all carriers.

at least they are actually reinforcing the towers! Here in nm it seems our engineer just decided against it for a lot of towers and ordered gmo.

 

Sent from my SPH-L900 using Tapatalk 2

 

 

Link to comment
Share on other sites

I see what your saying. I just know one town said ham radio antennas cant be over 13 feet tall and the FCC said it was too restrictive and it was changed.

 

I think what you are talking about is the OTARD. Had to use that a couple of times with the yuppies in HOA neighborhoods a few times.

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • T-Mobile Fires Back At AT&T After Their Statements On T-Priority
    • February is always closer than you think! https://stadiumtechreport.com/news/caesars-superdome-gets-matsing-deployment-ahead-of-super-bowl-lix/ Another Super Bowl, another MatSing cellular antenna deployment. Caesars Superdome, home of the NFL’s New Orleans Saints, has deployed a large number of cellular antennas from MatSing as part of an effort to increase wireless network capacity ahead of the upcoming Super Bowl LIX in February, 2025. It is the third such deployment of MatSing equipment at Super Bowl venues in as many years, following cellular upgrades at Allegiant Stadium for Super Bowl LVIII and at State Farm Stadium for Super Bowl LVII. According to the Saints, the MatSing antennas were part of a large wireless overhaul this offseason, done primarily “to satisfy fans’ desires for wireless consumption and bandwidth,” an important thing with Super Bowl LIX coming to the venue on Feb. 9, 2025. Each year, the NFL’s big game regularly sets records for wireless data consumption, with a steady upward progression ever since wireless networks were first put into stadiums. https://www.neworleanssaints.com/news/caesars-superdome-transformation-2024-new-orleans-saints-nfl-season-part-1-wifi-upgrades-wireless-cellular During the offseason renovation project, the foundation of the facility's new Distributed Antenna System (DAS) was the installation of 16 multi-beam, wideband spherical lense antennas that are seven feet in diameter and weigh nearly 600 pounds apiece, a model called the MatSing MS-48H180. Another 16 large antenna spheres of varying sizes and frequencies have also been installed for a total of 32 new large antennas, in addition to 200 cellular antennas inside and around the building, all of these products specifically made for high-density environments such as stadiums and arenas. The DAS system's performance is expected to enhance further as it becomes fully integrated throughout the season. The MatSing MS-48H180 devices, with a black color that matches the Caesars Superdome's roof, each were individually raised by hoist machines to the top of the facility and bolted into place. Each cellular antenna then transmits 48 different beams and signals to a specific area in the stadium, with each sphere angled differently to specifically target different coverage areas, allowing increased, consistent coverage for high-density seating areas. In addition to creating targets in seating and common areas throughout the stadium, these antennas create dedicated floor zones that result in improved coverage to the field areas for fans in 12 field-level suites and the Mercedes-Benz End Zone Club, teams and on-field media and broadcast elements. The project is also adding 2,500 new wireless access points placed in areas such as concourses, atriums, suites and food and beverage areas for better WiFi coverage.
    • https://www.yahoo.com/news/dallas-county-completes-first-911-194128506.html - First 911 call/text received over Starlink/T-Mobile direct to cell.  This appears to be in Dallas County, MO.
    • FCC: "We remain committed to helping with recovery efforts in states affected by Hurricane Helene. We stand ready to do all that is necessary to return connectivity to hard-hit areas and save lives." SpaceX: "SpaceX and @TMobile have been given emergency special temporary authority by the @FCC to enable @Starlink satellites with direct-to-cell capability to provide coverage for cell phones in the affected areas of Hurricane Helene. The satellites have already been enabled and started broadcasting emergency alerts to cell phones on all networks in North Carolina. In addition, we may test basic texting (SMS) capabilities for most cell phones on the T-Mobile network in North Carolina. SpaceX’s direct-to-cell constellation has not been fully deployed, so all services will be delivered on a best-effort basis." Space posted this at 2pm today on X.
    • https://ibb.co/KrTR877 https://ibb.co/DK3MVgw https://ibb.co/VgWtZwR Should work with these links
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...