Orange County Cell Sites on High Voltage Power lines finally being converted to Network Vision


Recommended Posts

I had reported a few times the past couple of years that Sprint typically wasn't doing NV upgrades on most of the cell sites that were located on power company utility lattice towers.  More specifically Southern California Edison property towers.  Well I'm happy to report that most of them are finally getting done now including mine which construction began this morning.  With over 95% of all sites already been upgraded it figured that mine would be in the final 5%.  Been a LONG wait and glad it's finally over.  Now I'm just hoping that they don't mess anything up and keep the azimuth pattern the way it's been without modification.

  • Like 8
Link to comment
Share on other sites

I had reported a few times the past couple of years that Sprint typically wasn't doing NV upgrades on most of the cell sites that were located on power company utility lattice towers.  More specifically Southern California Edison property towers.  Well I'm happy to report that most of them are finally getting done now including mine which construction began this morning.  With over 95% of all sites already been upgraded it figured that mine would be in the final 5%.  Been a LONG wait and glad it's finally over.  Now I'm just hoping that they don't mess anything up and keep the azimuth pattern the way it's been without modification.

Are they full build sites with new panels and RRUs are are they GMO sites for now? With the exception of one of our local sites, all of our high voltage power line sites were GMOed. At least we got lucky in that most of them are broadcasting B25 LTE. Our one exception was one site that was built as a full build from the get go. 

 

You're joking by starting a new thread for this right?

I'm not gonna lie, I'll probably be about as happy as the OP when they finally upgrade our site in Shepherdsville KY. Windstream ran fiber back in February of '13 and it has yet to be touched.   :wall:  

Link to comment
Share on other sites

 

 

I'm not gonna lie, I'll probably be about as happy as the OP when they finally upgrade our site in Shepherdsville KY. Windstream ran fiber back in February of '13 and it has yet to be touched. :wall:

We have quite a few of these in Columbus that we're keeping an eye on for conversions.

Link to comment
Share on other sites

We have quite a few of these in Columbus that we're keeping an eye on for conversions.

At least I'm lucky that its one of the very few remaining legacy sites in the market. I watch this and several GMO sites closely for activity since NV 2.0 has started here. Its hard to install 8t8r on a GMO site. 

Link to comment
Share on other sites

mostly all the ones owned my bonneville damn admin in portland/vancouver have been done now.. there be 1 or 2 left.. Now the questionable ones are the Clear sites that could exist one em, I know of 1 for sure that sits at a dog park i frequently go to, I cant find permits for my area as the site has gotten butchered badly, but I know there upgrading my metro area based off the portland ones that were found. soooo ?? who knows

Link to comment
Share on other sites

In the northern part of LA Metro, there are at least 3 LADWP transmission tower installations that have not had any work.  The bulk of the remaining work seems to be:  transmission tower installations, distribution power pole installations and for some reason sites on university and college campuses (not DAS, but macro sites.)

Link to comment
Share on other sites

In the northern part of LA Metro, there are at least 3 LADWP transmission tower installations that have not had any work.  The bulk of the remaining work seems to be:  transmission tower installations, distribution power pole installations and for some reason sites on university and college campuses (not DAS, but macro sites.)

 

Yeah probably because all of those require extra red tape and/or have more challenging installations.  There are plans to convert many of the DAS sites around Malibu, Topanga, Palisades, Studio City, etc but it looks like most of them are planned for 2015.

Link to comment
Share on other sites

Yeah probably because all of those require extra red tape and/or have more challenging installations.  There are plans to convert many of the DAS sites around Malibu, Topanga, Palisades, Studio City, etc but it looks like most of them are planned for 2015.

Do you know more details about this?  LA Metro has a lot of Juni gear that probably isn't compatible with B26 (or B41).  I know Alcatel-Lucent has some small cell equipment.

Link to comment
Share on other sites

All of this talk about cell sites on power lines, and no photos!

:needpic:

(Sorry, I figured this was a pretty good time to use that one. :) )

Look at the first image in this post (legacy equipment):

http://s4gru.com/index.php?/topic/5072-not-complete-maps/?p=357582

  • Like 1
Link to comment
Share on other sites

Look at the first image in this post (legacy equipment):

http://s4gru.com/index.php?/topic/5072-not-complete-maps/?p=357582

Sweet! We don't have many of those around here (though there are plenty of hi-capacity power lines that are in great places for cell sites) and the few that we do have are all VZ or T-Mobile.

Link to comment
Share on other sites

Yeah probably because all of those require extra red tape and/or have more challenging installations.  There are plans to convert many of the DAS sites around Malibu, Topanga, Palisades, Studio City, etc but it looks like most of them are planned for 2015.

 

Can't wait for this.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • This has been approved.. https://www.cnet.com/tech/mobile/fcc-approves-t-mobiles-deal-to-purchase-mint-mobile/  
    • In the conference call they had two question on additional spectrum. One was the 800 spectrum. They are not certain what will happen, thus have not really put it into their plans either way (sale or no sale). They do have a reserve level. Nationwide 800Mhz is seen as great for new technologies which I presume is IOT or 5g slices.  T-Mobile did not bite on use of their c-band or DOD.  mmWave rapidly approaching deadlines not mentioned at all. FWA brushes on this as it deals with underutilized spectrum on a sector by sector basis.  They are willing to take more money to allow FWA to be mobile (think RV or camping). Unsure if this represents a higher priority, for example, FWA Mobile in RVs in Walmart parking lots working where mobile phones need all the capacity. In terms of FWA capacity, their offload strategy is fiber through joint ventures where T-Mobile does the marketing, sales, and customer support while the fiber company does the network planning and installation.  50%-50% financial split not being consolidated into their books. I think discussion of other spectrum would have diluted the fiber joint venture discussion. They do have a fund which one use is to purchase new spectrum. Sale of the 800Mhz would go into this. It should be noted that they continue to buy 2.5Ghz spectrum from schools etc to replace leases. They will have a conference this fall  to update their overall strategies. Other notes from the call are 75% of the phones on the network are 5g. About 85% of their sites have n41, n25, and n71, 90% 5g.  93% of traffic is on midband.  SA is also adding to their performance advantage, which they figure is still ahead of other carriers by two years. It took two weeks to put the auction 108 spectrum to use at their existing sites. Mention was also made that their site spacing was designed for midrange thus no gaps in n41 coverage, while competitors was designed for lowband thus toggles back and forth for n77 also with its shorter range.  
    • The manual network selection sounds like it isn't always scanning NR, hence Dish not showing up. Your easiest way to force Dish is going to be forcing the phone into NR-only mode (*#*#4636#*#* menu?), since rainbow sims don't support SA on T-Mobile.
    • "The company’s unique multi-layer approach to 5G, with dedicated standalone 5G deployed nationwide across 600MHz, 1.9GHz, and 2.5GHz delivers customers a consistently strong experience, with 85% of 5G traffic on sites with all three spectrum bands deployed." Meanwhile they are very close to a construction deadline June 1 for 850Mhz of mmWave in most of Ohio covering 27500-28350Mhz expiring 6/8/2028. No reported sightings.  Buildout notice issue sent by FCC in March 5, 2024 https://wireless2.fcc.gov/UlsApp/letterPdf/LetterPdfController?licId=4019733&letterVersionId=178&autoLetterId=13060705&letterCode=CR&radioServiceCode=UU&op=LetterPdf&licSide=Y&archive=null&letterTo=L  No soecific permits seen in a quick check of Columbus. They also have an additional 200Mhz covering at 24350-25450 Mhz and 24950-25050Mhz with no buildout date expiring 12/11/2029.
    • T-Mobile Delivers Industry-Leading Customer, Service Revenue and Profitability Growth in Q1 2024, and Raises 2024 Guidance https://www.t-mobile.com/news/business/t-mobile-q1-2024-earnings — — — — — I find it funny that when they talk about their spectrum layers they're saying n71, n25, and n41. They're completely avoiding talking about mmWave.
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...