Jump to content

DaQue

S4GRU Premier Sponsor
  • Posts

    2,156
  • Joined

  • Last visited

Everything posted by DaQue

  1. its so big it can be mistaken for a small moon at first glance.... Love the phone. tiny bit too big for my personal taste. S4 about perfect.
  2. It did that but left foy for for Sent from my SPH-L900 using Tapatalk 4 Beta
  3. Does not dies.. stupid auto correct Sent from my SPH-L900 using Tapatalk 4 Beta
  4. No one can say foy sure but in general 800 dies better inside and usally covers a bit further. Sent from my SPH-L900 using Tapatalk 4 Beta
  5. When they added the Cottleville accepted site to the sponsors map for some reason they removed the inprogress one I reported. Fear not Cottleville will soon have 2 accepted sites and the purple plague in St Charles county will continue.
  6. I wonder if there will be a blip downward in the rollout as people are reassigned to yank the guts out of IDEN.
  7. Anyone want to offer a educated guess what percent of Sprint phones with a current sub can use LTE when its available locally? I'm wondering how much traffic it will off load from the EVDO network. LTE should even help data speeds on it if enough phones move off it to LTE.
  8. Kind of like some ham radio types do when they put up a new antenna, They leave the end of the coax coiled up outside for a month or so and when they get the complaints about TVI or whatever they show its not hooked up.
  9. Im back on EPHRD at work now with normal pings. LTE stops about 2 blocks from work from the Cottleville sit that's live already,.
  10. Bacj on EV-DO at work for the first time in months and ping 3x normal Sent from my SPH-L900 using Tapatalk 4 Beta
  11. What's that near? Is it Buchheit Supply on/near Weiss Rd and Burnington Dr? I never noticed that one but can run by there after work if you don't want to make a trip.
  12. I remember reading somewhere Robert's reply about how fast he guesses CDMA 800 sites will start coming online after the shutdown of the IDEN network. It took awhile to find,if your interested http://s4gru.com/index.php?/topic/2358-everything-800mhz-1xa-lte-coverage-timeline-etc/page-28&do=findComment&comment=148396 Posted 03 June 2013 - 03:05 PM SpenceSouth, on 03 Jun 2013 - 3:00 PM, said: Are we expecting a big light up or a gradual increase in pace once the countdown hits zero? I have no inside info on this. I'm guessing it will not be an immediate overnight light up of 1000's of sites. But I would guess a pretty rapid succession of CDMA 800 acceptances for the 90-120 day period after June 30th. And I would expect new sites would start being deployed with 3G and 800 together from the get go. Maybe even CDMA 800 and LTE 1900 together, as the 800 is more like the LTE in the fact it does not need to be brought online in clusters. Eventually getting to LTE 800/1900 and CDMA 800 being deployed all together at new sites. Robert
  13. Here is the picture I took after work of the site between Westwood Dr and 94 near the intersection of Westwood Dr & Motherhead Rd. in Cottleville. I posted it to the inprogress thread too so it can be showed in progress.
  14. I thought the back pc had a sd card slot but it doesn't . The ones that do are not on the network. Sent from my SPH-L900 using Tapatalk 4 Beta
  15. It has a 24x... Sent from my SPH-L900 using Tapatalk 4 Beta
  16. Will post when I get home no way to get it off the fujuifilm at work Sent from my SPH-L900 using Tapatalk 4 Beta
  17. If someone wants to cross post that to the in progress thread that would be cool with me. Sent from my SPH-L900 using Tapatalk 4 Beta
  18. I got a good picture of the rru's and the 2 guys installing them up top if the tower in Cottleville on 94. I will post after work. I may take anither after work shiwing the panel better if I can do it without being a traffic hazard. The panel is blocked by the guy s and tower structure. Sent from my SPH-L900 using Tapatalk 4 Beta
  19. And I think Sprint was asking for damages from both Clear and Dish. Getting money out of Clear would be pointless but Char Char should have to pay something I would hope.
  20. Just assumed (ass u me) you only did Springfield.
  21. Do I remember correctly that some time ago the someone (Sprint and or Dish) asked the FCC to more or less bundle in consideration of Clearwire going to Sprint in the ruling on Sprint and Softbank. If they did does that mean we only have to wait on one FCC decision and not another one after the Clearwire vote?
×
×
  • Create New...