Jump to content

LTE Calling Plus / Chicago Market


Recommended Posts

  • 3 months later...

I can originate or answer a call while on WiFi then turn WiFi off mid-call and the call continues on LTE. I am in Chicagoland. I then need to remember to turn WiFi back on again for the next call. 

Link to post
Share on other sites
28 minutes ago, schmidtj said:

I can originate or answer a call while on WiFi then turn WiFi off mid-call and the call continues on LTE. I am in Chicagoland. I then need to remember to turn WiFi back on again for the next call. 

For clarifications sake, this is actually called VCC - Voice Call Continuity.   Not Calling Plus or VoLTE.  From what we know, Calling Plus will not be coming to iPhones due Sprint's announcement in Feb of commercial rollout of VoLTE this fall.

VCC is cool stuff indeed - just another stepping stone to real VoLTE.  :)

Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • A ton of them are from Extenet which afaik is Verizon's primary small cell partner here. I also see a bunch for Mobilitie which was Sprint's primary partner and Crown Castle which is T-Mobile's primary partner. I wonder if T-Mobile plans on contracting both for small cells going forward. If so, that's a lot of combined potential small cells, though still less than Extenet. By far the least are New Cingular which is likely AT&T. The wildcard is Transit Wireless who seems to be branching out of the subway system and is deploying quite a few new sites.
    • NYC DOITT database was updated about a month ago. Imported all the new oDAS node locations into my map. Haven't yet spotted anything with the new design in my travels through Williamsburg & Bushwick. Almost 1400 newly proposed nodes (since 3/5/21) is pretty incredible, though. Made my way up to Harlem and City College this past week. The site (eNB 55893) covering the north side of the campus STILL hasn't been upgraded from B2/B66 (dual APX16s). Pulled ~70Mb/s down on what is essentially an empty campus. Wish I knew what the deal is with that site. I almost wonder if it might be easier to work with the school and keep the Sprint site on top of the engineering building (Steinman Hall, across the street from their current site), instead.
    • Just saw this permit for a very rural area:  https://permitsearch.mybuildingpermit.com/PermitDetails/21110744CBP/Snohomish County It sure looks like a T-Mobile site number (SE01794A) and mentions "ADD 2 ABIL FOR N1900 N2100" First time I have seen a permit mention n1900 or n2100 (would this be n2/n25 and n66?). In fact, I searched all of the major locals on that site and not a single other permit mentions n1900 or n2100 (and none mention n2 or n66).
    • Just saw this permit:  https://permitsearch.mybuildingpermit.com/PermitDetails/21110744CBP/Snohomish County It sure looks like a T-Mobile site number (SE01794A) and mentions "ADD 2 ABIL FOR N1900 N2100" First time I have seen a permit mention n1900 or n2100 (would this be n2 and n66?).
  • Recently Browsing

    No registered users viewing this page.

×
×
  • Create New...