I just Centurylink and, anyone that drags their feet like on sprint current towers will not be a part of these new sites. I also hope sprint will be able to lease 600mhz in the future when that time comes for when that could be deployed. att will spend 10 billion dollars for that FYI.

Link to comment
Share on other sites

I just Centurylink and, anyone that drags their feet like on sprint current towers will not be a part of these new sites. I also hope sprint will be able to lease 600mhz in the future when that time comes for when that could be deployed. att will spend 10 billion dollars for that FYI.

Wut

  • Like 1
Link to comment
Share on other sites

Anybody remember when orignal nv was thought be donevby sprint . End 2013 if i remember right.

 

No, end of 2015. They are still on track. It could also mean early-mid 2016 as many have argued in the past, as that's when the deployment physically started. 

 

http://newsroom.sprint.com/news-releases/sprint-announces-network-vision-network-evolution-plan.htm

 

 

Completion of Network Vision across the Sprint network is expected to take from three to five years.
  • Like 1
Link to comment
Share on other sites

The substantial completion has happened a while ago. There might be a few stragglers left in the system but at this point it is an immaterial number of sites.

 

Sent from my SM-N920V using Tapatalk

  • Like 1
Link to comment
Share on other sites

The substantial completion has happened a while ago. There might be a few stragglers left in the system but at this point it is an immaterial number of sites.

 

Sent from my SM-N920V using Tapatalk

Immaterial is very important to a lot of subscribers and they are losing a lot of customers due to not having them upgraded. I think they should make these last towers a priority. If they can't reach the landowner then choose another tower. The definition of insanity is doing the same thing over and over again and expecting a different result.
Link to comment
Share on other sites

Immaterial is very important to a lot of subscribers and they are losing a lot of customers due to not having them upgraded. I think they should make these last towers a priority. If they can't reach the landowner then choose another tower. The definition of insanity is doing the same thing over and over again and expecting a different result.

 

Sprint has stopped hemorrhaging customers at this point. Almost all that were on the fence have left already. Those straggler sites are obviously still a priority but they aren't going to wait around when they can get more more work done in the meantime. Additionally a lot of these sites are being held up by the very municipality that they are in so choosing another tower is simply not an option.

  • Like 3
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • Was in Red Hook again and I swear there are more Link5G sites as there are Verizon, T-Mobile, and AT&T small cells combined in the entire neighborhood. It seemed like every other street I turned down had one installed. Hopefully carriers will start hopping on them soon. Seems like a lot of effort to go through for no one to use them.  — — — — — T-Mobile converted the Sprint site on top of NYU Langone Brooklyn in Sunset Park. I first mapped one sector of it back in November 2023 but I thought it was a small cell so I never pinned it but I ran into another sector today which caught me off guard. I'm unable to find a permit for the conversion so it's definitely a surprise. There's another T-Mobile site 1 block away that T-Mobile initially installed back in 2019 so I'm kinda surprised they're keeping both considering the Sprint conversion is on a much taller building and could potentially provide much better coverage to the entire area.  — — — — — The old permit expired for this site without any work being done but a new permit was just approved a few days ago for a T-Mobile site at this address. Description mentions 3 antennas with 2 RRUs per sector. My guess is they're doing something similar to what they did at 360 Furman St in Brooklyn where they broadcast Band 2/66 and n25/41 from one antenna. It's a bit of a downgrade considering the site it's replacing was a full build with Ericsson 6449s. 
    • Still not seeing any ULS postings for pending T-Mobile UScellular merger in Dane county Wisconsin.
    • Came across another Crown Castle Solutions multi-tenant oDAS node in Brooklyn. Located at 40.7002286, -73.9612666. Nothing on T-Mobile or AT&T so I'm assuming these are all Verizon nodes that Crown Castle is anticipating another carrier will hop on down the line.