Jump to content

Hello from the Metro East (St. Louis)!


stilwellweather

Recommended Posts

For the longest time, I was in read-only mode, but finally decided to join and keep up with Sprint's 4G rollout in the St. Louis area. You do an excellent job of keeping everybody updated, which is why I joined. Can't wait to participate here and see what Sprint does in the coming months!

  • Like 3
Link to comment
Share on other sites

:welcome:

 

Welcome to the site!

 

As a former STL resident, it's exciting to see the progress going on in the area.

 

Make sure to check out the Missouri market thread for all the good info!

Edited by Dkoellerwx
to many flipping welcomes :p
  • Like 1
Link to comment
Share on other sites

For the longest time, I was in read-only mode, but finally decided to join and keep up with Sprint's 4G rollout in the St. Louis area. You do an excellent job of keeping everybody updated, which is why I joined. Can't wait to participate here and see what Sprint does in the coming months!

 

Welcome! What part of the Metro East are you in!

Link to comment
Share on other sites

  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • My s24 Ultras auto updated to April 1 security patch over night. Not on wi-fi.  Play system remains at March 1. No notice that update occurred on screen.
    • Got the latest update. On my S24 ultra the NR-ARFCN display remains constant (which is inaccurate according to diags) while n41 and 38 toggle back and forth.  I updated then rebooted before testing. Two sims active. My security patch level updated automatically to April 1 before this update. Diags sent while n38 was displaying.
    • Was able to install the March 1 Android security patch. Seems slightly more accurate with 5g ca band id, but can not swear by it. Updated google play system update through the software information screen to March 1. *#73# still works. Froze updates waiting on SCP update beta to fix n41 showing as n38.
    • Just installed it. Thanks for the info.  71 mb mar 1st date.
    • There's a permit for a new 47 story building at 205 Montague St in Downtown Brooklyn. The problem is that  T-Mobile eNB 48352 is on the building next door and this new building will block two out of 3 sectors of the site. For reference, the new building will be roughly as tall as 16 Court St which is right across the street. This site is the primary site covering Cadman Plaza so I wonder what the plan is. Will they just try to change sector placement, move to a different building, or will this just speed up the conversion of the Sprint site at 25 Monroe Place?
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...