Jump to content

Network Vision/LTE - Upper Central Valley Market (Sacramento, Stockton, Redding, Eureka & Reno/Lake Tahoe)


iwalkthrowwalls

Recommended Posts

This eCSFB is killing the battery on my Nexus 5. It constantly tries to connect to LTE but fails and reverts back to 3G. What sucks is that it does this while phone is sleep and by morning my battery is completely dead. I had to force GSM/CDMA only so it doesn’t try to connect to lte. They need to push the update out already or shut off lte altogether until they get this straightened out. lol.

 

 

Link to comment
Share on other sites

This eCSFB is killing the battery on my Nexus 5. It constantly tries to connect to LTE but fails and reverts back to 3G. What sucks is that it does this while phone is sleep and by morning my battery is completely dead. I had to force GSM/CDMA only so it doesn’t try to connect to lte. They need to push the update out already or shut off lte altogether until they get this straightened out. lol.

But the update wont help if the network isn't upgraded as well

Link to comment
Share on other sites

it should be per info from sponsors thread. i can get to band 25 & 41 if i force lte

The update doesn't enable LTE to just be accessible though. Forcing LTE is necessary if you aren't on a NV 3g site. I can get LTE now in LA without issues on a N5

Link to comment
Share on other sites

The update doesn't enable LTE to just be accessible though. Forcing LTE is necessary if you aren't on a NV 3g site. I can get LTE now in LA without issues on a N5

 i am at a NV 3g site.

Link to comment
Share on other sites

 

 Upper Central Valley - 7 updates (2 3G, 5 LTE)

 

6 Acceptances in Elk Grove cluster - 2x 3G and 4x 4G LTE

1 4G Acceptance in Yuba City cluster off Hwy 99 & Rio Oso Road south of Olivehurst

 

 

Exact Locations & other info available to S4GRU Sponsors 

Link to comment
Share on other sites

6 Acceptances in Elk Grove cluster - 2x 3G and 4x 4G LTE

1 4G Acceptance in Yuba City cluster off Hwy 99 & Rio Oso Road south of Olivehurst

 

 

Exact Locations & other info available to S4GRU Sponsors

Was the backhaul ready on those towers in elk grove that are accepted LTE? Cause they lit up quickly.

Link to comment
Share on other sites

Was the backhaul ready on those towers in elk grove that are accepted LTE? Cause they lit up quickly.

Most likely yes.

 

Normal backhaul orders when placed usually take a minimum of 90 days and usually end up taking more around the 120 day mark before new backhaul is installed and fired up. This is if there are no issues between the integration team and the LEC etc...working with AT&T for backhaul can be a pain for the integration teams and everyone needs to be on the same page.

 

As a Network Engineer I experience these things on a daily basis. Most likely the backhaul orders were placed a while ago and they have usually pulled fiber from wherever they need to up into the MPOE. Most of the time the fiber is terminated and actually connected to the cell sites base station switch ahead of time, but the ports are turned down.

 

The integration team's job is to up those ports and integrate the site into Sprints network sending traffic over the new backhaul (fiber) and disconnecting the old backhaul. T1's...DS3's etc. It is to their advantage to submit the backhaul orders ahead of time because of the lead time that is required, that way the integration team can usually flip the switch to the new backhaul overnight. 

  • Like 2
Link to comment
Share on other sites

Most likely yes.

 

Normal backhaul orders when placed usually take a minimum of 90 days and usually end up taking more around the 120 day mark before new backhaul is installed and fired up. This is if there are no issues between the integration team and the LEC etc...working with AT&T for backhaul can be a pain for the integration teams and everyone needs to be on the same page.

 

As a Network Engineer I experience these things on a daily basis. Most likely the backhaul orders were placed a while ago and they have usually pulled fiber from wherever they need to up into the MPOE. Most of the time the fiber is terminated and actually connected to the cell sites base station switch ahead of time, but the ports are turned down.

 

The integration team's job is to up those ports and integrate the site into Sprints network sending traffic over the new backhaul (fiber) and disconnecting the old backhaul. T1's...DS3's etc. It is to their advantage to submit the backhaul orders ahead of time because of the lead time that is required, that way the integration team can usually flip the switch to the new backhaul overnight.

Wow that's so interesting! Is the backhaul work visible like the tower work?

Link to comment
Share on other sites

So will Davis LTE tower range grow or will there be more towers throughout the city?

 

There are 6 Sprint towers that serve the Davis area.Only 1 have the advanced backhaul required by network vision specifications to allow the activation of LTE services. The other 5 are waiting on backhaul contractors to deliver the upgraded backhaul.

 

Triband users may be able to connect to the former Clearwire network which may or may not have been upgraded to dual mode Wimax + TDD-LTE functionality. 

Link to comment
Share on other sites

There are 6 Sprint towers that serve the Davis area.Only 1 have the advanced backhaul required by network vision specifications to allow the activation of LTE services. The other 5 are waiting on backhaul contractors to deliver the upgraded backhaul.

 

Triband users may be able to connect to the former Clearwire network which may or may not have been upgraded to dual mode Wimax + TDD-LTE functionality.

Sweet, so when all 6 are completed how will the coverage be like?
Link to comment
Share on other sites

legendary, on 03 Apr 2014 - 12:22 PM, said:

 

Sweet, so when all 6 are completed how will the coverage be like?

Exceptional especially when the Clearwire network is fully broadcasting B41 TDD-LTE (spark) & LTE 800 gets up and running over Sprints sites.

 

After everything is done Sprint will have about a little over a dozen towers broadcasting in Davis. Most carriers would at most have 4 or 5 towers towns for the size of Davis so it's Sprint will have a huge amount of sites in comparison to everyone else.

Link to comment
Share on other sites

There are 6 Sprint towers that serve the Davis area.Only 1 have the advanced backhaul required by network vision specifications to allow the activation of LTE services. The other 5 are waiting on backhaul contractors to deliver the upgraded backhaul.

 

Triband users may be able to connect to the former Clearwire network which may or may not have been upgraded to dual mode Wimax + TDD-LTE functionality. 

 

OK i was going to try to get out to elk grove to try to check out some B41, but I just want to confirm the process.  You need to be on either .15 or .17, force LTE, and do a prl update after the band priority is set, right?

Link to comment
Share on other sites

OK i was going to try to get out to elk grove to try to check out some B41, but I just want to confirm the process.  You need to be on either .15 or .17, force LTE, and do a prl update after the band priority is set, right?

 

Yes. PRL update to hell and back. B25 might mess with the radio not wanting to connect to B41 as well so be prepared.

Link to comment
Share on other sites

Yes. PRL update to hell and back. B25 might mess with the radio not wanting to connect to B41 as well so be prepared.

B25 does mess it up. I've been unable to connect to B41 since B25 went live even when switching the priorties around. Don't think there's a way to turn off B25 altogether?

Link to comment
Share on other sites

B25 does mess it up. I've been unable to connect to B41 since B25 went live even when switching the priorties around. Don't think there's a way to turn off B25 altogether?

 

Nope. Sprint will absolutely not let anyone camp LTE 800 so B25 is permanently enabled at all times. 

Link to comment
Share on other sites

Nope. Sprint will absolutely not let anyone camp LTE 800 so B25 is permanently enabled at all times. 

lol thought so. this sucks tho since i was averaing over 30mpbs on B41 and can barely crack 2mpbs on B25.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • Was in Red Hook again and I swear there are more Link5G sites as there are Verizon, T-Mobile, and AT&T small cells combined in the entire neighborhood. It seemed like every other street I turned down had one installed. Hopefully carriers will start hopping on them soon. Seems like a lot of effort to go through for no one to use them.  — — — — — T-Mobile converted the Sprint site on top of NYU Langone Brooklyn in Sunset Park. I first mapped one sector of it back in November 2023 but I thought it was a small cell so I never pinned it but I ran into another sector today which caught me off guard. I'm unable to find a permit for the conversion so it's definitely a surprise. There's another T-Mobile site 1 block away that T-Mobile initially installed back in 2019 so I'm kinda surprised they're keeping both considering the Sprint conversion is on a much taller building and could potentially provide much better coverage to the entire area.   
    • Still not seeing any ULS postings for pending T-Mobile UScellular merger in Dane county Wisconsin.
    • Came across another Crown Castle Solutions multi-tenant oDAS node in Brooklyn. Located at 40.7002286, -73.9612666. Nothing on T-Mobile or AT&T so I'm assuming these are all Verizon nodes that Crown Castle is anticipating another carrier will hop on down the line.
    • Same with factory unlocked
    • June security update is out (S22U TMO)
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...