Jump to content

Rawvega

Honored Premier Sponsor
  • Posts

    2,404
  • Joined

  • Last visited

  • Days Won

    5

Everything posted by Rawvega

  1. I would think Band 41, then Band 25 then Band 26 in that order. Edit: The reasoning behind my suggestion is because you definitely want to be on Band 41 whenever possible due to there being more capacity and higher speeds and IMO you want Band 26 to be your last resort, to only be used if 41 and 25 are unavailable.
  2. It's not terribly surprising to get switched to 1x800 inside of a casino/hotel. It's widely deployed here in Vegas. Though I almost always have a good PCS CDMA signal, I still get switched over to 1x800 periodically at work inside of an all metal building. What can push Sprint's network over the top here is the ok to start turning up Band 26 LTE.
  3. Indeed. It was mentioned here among other places: http://www.fiercewireless.com/story/sprint-bring-carrier-aggregation-all-its-lte-bands-bid-boost-performance/2015-02-05 And I'm very intrigued by the prospect. Hopefully flagship devices in the latter part of the year will start including this ability along with 3x CA.
  4. http://recode.net/2014/04/16/att-threatens-boycott-if-tv-airwaves-auction-rules-arent-changed/ http://www.fiercewireless.com/story/analysts-verizon-might-be-playing-coy-600-mhz-auction-participation-get-mor/2015-02-18 It seems hinting at or outright threatening not to bid in the 600MHz spectrum at some point in time is the vogue thing to do.
  5. Water St. near Lake Mead at the factory behind the Target shopping center.
  6. Thanks for clearing that up...Anyway, the 600MHz auction if and when it occurs is likely to be the last auction of low band spectrum for quite some time. It's not unreasonable to expect that SoftBank as well as all of the other carriers, large and small, to pull out all of the stops to acquire as much as they can. Now I doubt that anybody not in their C-suite can accurately project what SoftBank's bidding strategy will be and how it'll all shake out at this juncture.
  7. For one, you thought incorrectly; the title of this thread makes it pretty clear what the subject is. Two, I don't know who or what 'softy' is. Moreover, like a lot of people on the internet, you seem to be caught up in an either/or fallacy.
  8. However, the subject isn't 9000 cell sites. The subject is the 600MHz auction.
  9. I don't believe that the 600MHz auction has started yet.
  10. Likely the only limitation is the size of their war chest and how deeply they're willing to dig into it.
  11. Ah, perhaps they've fixed whatever issues it may have had.
×
×
  • Create New...