I would assume it would be upgraded, I'm not up to speed on all the NV intricacies. Although I do believe the plan was that if say a Nextel site was in a more prime location than say the sprint site that site may be moved to the old nextal site as a switcharoo but otherwise ALL the metro cell equipment is coming out one way or another,