Jump to content

Estimated time of 800 mhz rollout?


Recommended Posts

< 150kbps.

 

The 1x being deployed on SMR (and PCS too, I believe) is 1x Advanced, not 1xRTT. 1xA can provide 4x the voice capacity OR 3x the data speed (up to 500kbps), or some smaller in-between mixed improvement. While I would prefer if they focused on improving voice coverage and capacity rather than data speed, I'm not sure if that's how they're configuring it. In any case, one's handset would need to support 1xA to take advantage of the improved coverage and/or speed.

 

Good enough what would come first NV 3G or 1X800?

 

I would consider 1x more of a "2G transitional" (2.5G) technology than actual 3G like UMTS or Ev-DO, but I'm also a stickler for referring to WiMax, HSPA+, and LTE r8/9 as 3G transitional technologies, or even more to the point- "faux-G" (with only WiMAX-A and LTE-A r10+ being true 4G). The whole "G" thing just seems to be for marketing anyway.

 

But I digress... if by NV 3G you are referring to Ev-DO on PCS, then 3G will come first. 1x800 only gets installed on upgraded NV sites, and those must first pass inspection as "3G ready", meaning the new panels and RRU's have been installed, but the fiber backhaul to support the full 2 Mbps on 3G let alone LTE has not necessarily been hooked up yet. Whether 1x800 or LTE comes next depends on the availability of that backhaul, site spacing, permitting, and other factors.

Link to comment
Share on other sites

The 1x being deployed on SMR (and PCS too, I believe) is 1x Advanced, not 1xRTT. 1xA can provide 4x the voice capacity OR 3x the data speed (up to 500kbps), or some smaller in-between mixed improvement. While I would prefer if they focused on improving voice coverage and capacity rather than data speed, I'm not sure if that's how they're configuring it. In any case, one's handset would need to support 1xA to take advantage of the improved coverage and/or speed.

 

 

I would consider 1x more of a "2G transitional" (2.5G) technology than actual 3G like UMTS or Ev-DO, but I'm also a stickler for referring to WiMax, HSPA+, and LTE r8/9 as 3G transitional technologies, or even more to the point- "faux-G" (with only WiMAX-A and LTE-A r10+ being true 4G). The whole "G" thing just seems to be for marketing anyway.

 

But I digress... if by NV 3G you are referring to Ev-DO on PCS, then 3G will come first. 1x800 only gets installed on upgraded NV sites, and those must first pass inspection as "3G ready", meaning the new panels and RRU's have been installed, but the fiber backhaul to support the full 2 Mbps on 3G let alone LTE has not necessarily been hooked up yet. Whether 1x800 or LTE comes next depends on the availability of that backhaul, site spacing, permitting, and other factors.

Isn't every phone 1X800 Capable but not 1XAdvanced?

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • Was in Red Hook again and I swear there are more Link5G sites as there are Verizon, T-Mobile, and AT&T small cells combined in the entire neighborhood. It seemed like every other street I turned down had one installed. Hopefully carriers will start hopping on them soon. Seems like a lot of effort to go through for no one to use them.  — — — — — T-Mobile converted the Sprint site on top of NYU Langone Brooklyn in Sunset Park. I first mapped one sector of it back in November 2023 but I thought it was a small cell so I never pinned it but I ran into another sector today which caught me off guard. I'm unable to find a permit for the conversion so it's definitely a surprise. There's another T-Mobile site 1 block away that T-Mobile initially installed back in 2019 so I'm kinda surprised they're keeping both considering the Sprint conversion is on a much taller building and could potentially provide much better coverage to the entire area.  — — — — — The old permit expired for this site without any work being done but a new permit was just approved a few days ago for a T-Mobile site at this address. Description mentions 3 antennas with 2 RRUs per sector. My guess is they're doing something similar to what they did at 360 Furman St in Brooklyn where they broadcast Band 2/66 and n25/41 from one antenna. It's a bit of a downgrade considering the site it's replacing was a full build with Ericsson 6449s. 
    • Still not seeing any ULS postings for pending T-Mobile UScellular merger in Dane county Wisconsin.
    • Came across another Crown Castle Solutions multi-tenant oDAS node in Brooklyn. Located at 40.7002286, -73.9612666. Nothing on T-Mobile or AT&T so I'm assuming these are all Verizon nodes that Crown Castle is anticipating another carrier will hop on down the line.
    • Same with factory unlocked
    • June security update is out (S22U TMO)
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...