Jump to content

memphis not showing updates on network.sprint.com


dmaxx67

Recommended Posts

Just joined. Been watching this page for a while. Memphis is suppose to start in September but when I check there site they aren't showing many updates over next 6 months. the ones that are are mostly voice and data capacity, not many data speed. any incite into what I'm missing? thanks again

Link to comment
Share on other sites

Just joined. Been watching this page for a while. Memphis is suppose to start in September but when I check there site they aren't showing many updates over next 6 months. the ones that are are mostly voice and data capacity, not many data speed. any incite into what I'm missing? thanks again

 

Apparently you are referring to Sprint's own map of local upgrades accessible here? Those scheduled upgrades have nothing to do with the Network Vision network rebuild project that includes LTE, but rather "band-aid" maintenance upgrades on the legacy network.

Link to comment
Share on other sites

To expand on Brad's comment above, Sprint's site network.sprint.com shows maintenance upgrades being performed under their maintenance contract with Ericsson. On that site they show additional capacity adds for voice and data and additional speed upgrades (via additional T1 lines). These are not related to Network Vision/LTE deployments.

 

Robert

Link to comment
Share on other sites

appreciate it, I live in northern Mississippi. and there are two towers near my house. is Memphis still on cue for starting September.

 

The Running List thread here at S4GRU still shows Memphis as a Second Round market with an "Anticipated Launch" in November. And there are a lot of caveats associated with that projection.

Link to comment
Share on other sites

Sprint seems a little behind as well (or rather their OEMs especially erricson). I expect someone at Sprint HQ will be lighting a fire under someone's butt soon if they haven't already.

 

I think backhaul needs to get far enough out (maybe 30-40 sites) before Ericsson and the subcontractors will mobilize. Otherwise, if the backhaul doesn't stay far enough out ahead, they will run into schedule issues with lots of workers standing around waiting for another site. If the deployment is too inefficient, the subcontractors will start complaining about change orders. I see it happen all the time in my line of work.

 

Robert

Link to comment
Share on other sites

I think backhaul needs to get far enough out (maybe 30-40 sites) before Ericsson and the subcontractors will mobilize. Otherwise, if the backhaul doesn't stay far enough out ahead, they will run into schedule issues with lots of workers standing around waiting for another site. If the deployment is too inefficient, the subcontractors will start complaining about change orders. I see it happen all the time in my line of work.

 

Robert

 

Maybe Erricson needs to kindle a fire (pun absolutely intended) under the backhaul vendors. Someone has to be getting in trouble here. If not then the government needs to get involved as these backhaul vendors being purposefully slow could be construed as anti-competitive behavior by (and I'm guessing this is who is at fault) the big telcos such as ATT and VZ.

 

Edit: also, their policy may not be the best.

 

Look at chicago, sure they have issues (which rest almost solely on motorola equipment) but they are almost right on schedule. Maybe just installing the equipment without new backhaul first is better. That way, they get these towers completed as soon as possible. "EDIT: may not have been a good idea to include that info, sorry". Once launched I predict Chicago will have a much better network overall coverage-wise compared to all other markets as they have a much better site density. I hope sprint learns from chicago that doing other NV work ahead of time is a good idea (although here it was a necessity).

Link to comment
Share on other sites

I'm with you brother , I'm in Toledo Ohio these band aids are not working . Sprint needs to get hard core with Ericsson

 

mobile EVO

they have helped a

Little bit but are prob being overloaded again but we can only hope that Toledo could be in the third round..considering again that every market around us is getting or starting nv this year

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • More details/pics: https://www.si.com/nfl/saints/news/saints-fans-to-enjoy-new-nfl-experience-with-massive-wireless-tech-upgrade-at-caesars-superdome-01j5yb9yd5xr https://www.businesswire.com/news/home/20240822812168/en/MatSing-Lens-Antennas-Enhance-Connectivity-at-Caesars-Superdome-Ahead-of-New-Orleans-Saints-Season https://www.nola.com/news/business/itll-be-easier-to-call-text-inside-superdome-thanks-to-80m-wireless-upgrade-what-to/article_bf2dd66c-4f85-11ef-9820-b3c36c831099.html
    • T-Mobile Fires Back At AT&T After Their Statements On T-Priority
    • February is always closer than you think! https://stadiumtechreport.com/news/caesars-superdome-gets-matsing-deployment-ahead-of-super-bowl-lix/ Another Super Bowl, another MatSing cellular antenna deployment. Caesars Superdome, home of the NFL’s New Orleans Saints, has deployed a large number of cellular antennas from MatSing as part of an effort to increase wireless network capacity ahead of the upcoming Super Bowl LIX in February, 2025. It is the third such deployment of MatSing equipment at Super Bowl venues in as many years, following cellular upgrades at Allegiant Stadium for Super Bowl LVIII and at State Farm Stadium for Super Bowl LVII. According to the Saints, the MatSing antennas were part of a large wireless overhaul this offseason, done primarily “to satisfy fans’ desires for wireless consumption and bandwidth,” an important thing with Super Bowl LIX coming to the venue on Feb. 9, 2025. Each year, the NFL’s big game regularly sets records for wireless data consumption, with a steady upward progression ever since wireless networks were first put into stadiums. https://www.neworleanssaints.com/news/caesars-superdome-transformation-2024-new-orleans-saints-nfl-season-part-1-wifi-upgrades-wireless-cellular During the offseason renovation project, the foundation of the facility's new Distributed Antenna System (DAS) was the installation of 16 multi-beam, wideband spherical lense antennas that are seven feet in diameter and weigh nearly 600 pounds apiece, a model called the MatSing MS-48H180. Another 16 large antenna spheres of varying sizes and frequencies have also been installed for a total of 32 new large antennas, in addition to 200 cellular antennas inside and around the building, all of these products specifically made for high-density environments such as stadiums and arenas. The DAS system's performance is expected to enhance further as it becomes fully integrated throughout the season. The MatSing MS-48H180 devices, with a black color that matches the Caesars Superdome's roof, each were individually raised by hoist machines to the top of the facility and bolted into place. Each cellular antenna then transmits 48 different beams and signals to a specific area in the stadium, with each sphere angled differently to specifically target different coverage areas, allowing increased, consistent coverage for high-density seating areas. In addition to creating targets in seating and common areas throughout the stadium, these antennas create dedicated floor zones that result in improved coverage to the field areas for fans in 12 field-level suites and the Mercedes-Benz End Zone Club, teams and on-field media and broadcast elements. The project is also adding 2,500 new wireless access points placed in areas such as concourses, atriums, suites and food and beverage areas for better WiFi coverage.
    • https://www.yahoo.com/news/dallas-county-completes-first-911-194128506.html - First 911 call/text received over Starlink/T-Mobile direct to cell.  This appears to be in Dallas County, MO.
    • FCC: "We remain committed to helping with recovery efforts in states affected by Hurricane Helene. We stand ready to do all that is necessary to return connectivity to hard-hit areas and save lives." SpaceX: "SpaceX and @TMobile have been given emergency special temporary authority by the @FCC to enable @Starlink satellites with direct-to-cell capability to provide coverage for cell phones in the affected areas of Hurricane Helene. The satellites have already been enabled and started broadcasting emergency alerts to cell phones on all networks in North Carolina. In addition, we may test basic texting (SMS) capabilities for most cell phones on the T-Mobile network in North Carolina. SpaceX’s direct-to-cell constellation has not been fully deployed, so all services will be delivered on a best-effort basis." Space posted this at 2pm today on X.
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...