Jump to content

Oedipus

S4GRU Premier Sponsor
  • Posts

    650
  • Joined

  • Last visited

Everything posted by Oedipus

  1. Not as of the last time I checked, which was a few weeks ago. The permit is still listed as CR.
  2. Yes, there's only one site in Visalia that isn't LTE accepted and it isn't the one by the airport.
  3. I've only seen CBA once; Caltrop several times. They're the ones on the documentation for the rodeo grounds site.
  4. There's always* 3 or 6 flat, magic radio boards (or 9, if it's high capacity with NV and legacy hardware) on Sprint's towers. They're not done with the lift, either; note that only two of the cables are plugged in to each flat, magic radio board. They need to come back and connect the other four. Hopefully once they're done with this one they can DO THE FREAKING RODEO GROUNDS SITE GOD DAMN IT Edit - Edited for Tim's sake.
  5. No new panels at the cedar and ashlan site yet, but I reckon it will be done sometime next week.
  6. They were replacing a pole on the street directly north of Ashlan. There must have been something related going on inside those ghetto apartments because I saw some obviously thrilled PG&E dudes walking through the gate. Maybe a meth lab or honey oil explosion took out the pole, who knows.
  7. In this case, it's the T-Mobile employee (???) that is lying to you. Sprint is also under no obligation to do anything, let alone tell us (or anyone) the true state and timetable of their rollout. Therefore, it's much more productive to go out and explore the world to get a tangible idea of how well the deployment is progressing. This concept seems to escape most of the people posting in this thread.
  8. Unlikely. The rodeo site is still not, as far as I can tell, anyway, in progress. The permit for the site over by Home Depot on Shaw still has not been issued, either. On the plus side, Fresno is coming along nicely. I found another "in progress" site in the city today that was definitely not in progress last week.
  9. Interesting setup here: Seems that there would be CSFB problems if the panels aren't connected to the old base equipment. I don't know if that's even an option.
  10. If you get a crappy signal now, you're not going to see much of an improvement until 1x 800 and LTE 800 are deployed. LTE 1900 might reach your location, but I wouldn't hold my breath. Unfortunately, the downtown sites are structure-mounted, so their deployment cycle will likely be longer than the standard pole-mounted sites.
  11. Another Fresno site in progress: Couldn't stop close to this one, so I had to take the pic while in motion. There were at least three CBA trucks at this site. It looks like the new base hardware is in place, but I didn't get much of a window to look into the enclosure.
  12. If you're not careful, you're going to run into me lurking on that site. They put the RRUs in today:
  13. Lol, it doesn't always feel like there's that many. Now it's a race between Sacto and Fresno...
  14. Exeter does. The farmersville site does not, last I checked. That's just two sites, though. Fresno has like 20.
  15. I have now found 3 fresno sites in progress. Well, technically 4 but that includes the one I found back in October. randpaulitshappening.gif
×
×
  • Create New...