Jump to content

Oedipus

S4GRU Premier Sponsor
  • Posts

    650
  • Joined

  • Last visited

Everything posted by Oedipus

  1. Hurr, yeah that's what I meant. I was dead in the water most of the day yesterday; eventually I was able to do a speedtest via the tower off Ben Maddox but like you said the latency was high (1100-1200 ms) and the speeds were like .04/.01. The tower on Caldwell and the one on walnut seemed to be operating normally.
  2. The eastern end of Visalia has zero data service right now. I noticed it this morning when I was out near Farmersville, but it's no better here near Martha's Vineyard. Hopefully this is worthwhile.
  3. I believe there's a walmart with a mcdonald's located to the left of the mcdonalds near the fork in the road, too. The tower is to the right of the third mcwalmart.
  4. I'm not a walmart shopper, but it's the one just east of Mooney on Caldwell. North side of the street.
  5. I see that the tower at 1401 Caldwell in Visalia had a Sprint permit filed on 4/26/13. The description contains the magic words: INSTALL 2 NEW EQUIP. CABINETS, 3 NEW PANEL ANTENNAS, AND MISC EQUIP. Yeah buddy. One of my clients is directly beneath that tower.
  6. http://www.foxnews.com/health/2011/02/04/fresno-california-americas-drunkest-city/ PARTY HARDY BABY WOOOOOOO
  7. Yeah, I went by there again today and confirmed that they're working on the lower rack, which appears to be AT&T.
  8. I went by there today and there was a lift with some workers going at it. The problem is that there are two towers in that same basic area: One is a monopole that looks exactly like most of the sprint towers around here (but not all of them, because there's one that looks just like that one that is across the street from my office but is definitely not a sprint tower) and there's also some panels up on a self-supporting lattice structure. It was the lattice structure that was being worked on. I'll make some time to go over there and check it out more closely.
  9. Killer. I'll be at the HRH in July, and we all know that nothing pairs better with a drunken stupor than LTE.
  10. The UCV market is supposed to start before LCV. Does that make you feel better? What Sprint is doing is complicated enough to preclude a "hard" date. They're upgrading all of their towers and running new backhaul to most of them. It's not like they're trying to go on a beer run or something.
×
×
  • Create New...