Jump to content

Lightsquared's LTE network doomed


Recommended Posts

We all knew it was pretty much inevitable. The FCC had the National Telecommunications and Information Administration look into the potential interference and the NTIA recommended that "It is our conclusion at this time that there are no mitigation strategies that both solve the interference issues and provide LightSquared with an adequate commercial network deployment." It was a great plan, but it looks like the end of the line for LS2.

 

http://www.kansascity.com/2012/02/14/3429658/lightsquared-dealt-blow-by-regulators.html

Link to comment
Share on other sites

yeah heres the story on engadget too.

 

http://www.engadget.com/2012/02/14/fcc-to-deny-lightsquared-lte-bid/

 

They have the $$ to keep plugging away at this thing for a few years evidently too so will be interested to see how it ends up in the long haul...

Link to comment
Share on other sites

AJ is considering doing a write up on this today or tomorrow in my absence.

 

S4GRU is now mobile...posted via Forum Runner

 

cool to know. I mean from their previous talk they have funding to still grind this out for at least a couple years and try other things, whatever they may be...

Link to comment
Share on other sites

cool to know. I mean from their previous talk they have funding to still grind this out for at least a couple years and try other things, whatever they may be...

 

They would probably have to come up with something new for the FCC to take another look at it. They are pretty much closing the book on it for now.

Link to comment
Share on other sites

 

cool to know. I mean from their previous talk they have funding to still grind this out for at least a couple years and try other things' date=' whatever they may be...[/quote']

 

I think the last I read, LightSquared is down to the last $300M dollars. I think they were counting on some positive news from the FCC to help the cause to raise more money. This is likely the end. Suing is their only resort.

 

S4GRU is now mobile...posted via Forum Runner

Link to comment
Share on other sites

I think the last I read, LightSquared is down to the last $300M dollars. I think they were counting on some positive news from the FCC to help the cause to raise more money. This is likely the end. Suing is their only resort.

 

S4GRU is now mobile...posted via Forum Runner

 

yeah I was wrong not "years" but "quarters" instead. lol. Last they said was they "...had enough cash to keep the company going for several quarters..."

 

http://gigaom.com/broadband/can-carl-icahn-pick-up-the-pieces-of-lightsquared/

Link to comment
Share on other sites

yeah I was wrong not "years" but "quarters" instead. lol. Last they said was they "...had enough cash to keep the company going for several quarters..."

 

http://gigaom.com/br...f-lightsquared/

 

Yeah, I saw that a while ago and it seemed wierd that all of a sudden they had money to keep it going when they kept getting denied at every turn.

Link to comment
Share on other sites

LightSquared is doomed. Spending their money on a lawsuit will only make things worse. I guess it's time for them to throw in the towel. One less backup for Sprint. Maybe Dish will get regulatory approval for an LTE network.

Link to comment
Share on other sites

LightSquared is doomed. Spending their money on a lawsuit will only make things worse. I guess it's time for them to throw in the towel. One less backup for Sprint. Maybe Dish will get regulatory approval for an LTE network.

 

I hope so, and I hope they don't make a deal with AT&T. AT&T could easily drive up the price if they don't end up buying the spectrum or doing a hosting agreement.

Link to comment
Share on other sites

Well this might hurt a bit for sprint too. Least if they have already spent some of this...or planned on needing it for other things...

 

http://www.engadget.com/2012/02/15/sprint-may-have-dug-itself-a-65-million-hole-with-lightsquared/

 

 

 

Sent from my PG86100 using Tapatalk

Link to comment
Share on other sites

LS2 needs to take the remaining funds it has and set up monitoring to see which industry devices bleed over into its spectrum and bill the offender for its use. LS2 could recoup a bunch of money that way. Silly, I know but its a waste to see a good idea and business plan go down the drain because of politicians, sloppy manufacturers and politicians.

Link to comment
Share on other sites

LS2 needs to take the remaining funds it has and set up monitoring to see which industry devices bleed over into its spectrum and bill the offender for its use. LS2 could recoup a bunch of money that way. Silly, I know but its a waste to see a good idea and business plan go down the drain because of politicians, sloppy manufacturers and politicians.

 

haha GPS device makers freak. lol

Link to comment
Share on other sites

LS2 needs to take the remaining funds it has and set up monitoring to see which industry devices bleed over into its spectrum and bill the offender for its use. LS2 could recoup a bunch of money that way. Silly, I know but its a waste to see a good idea and business plan go down the drain because of politicians, sloppy manufacturers and politicians.

 

That might not be a bad idea. It might work, but still would take some time to collect all those funds.

Link to comment
Share on other sites

I don't know where LS2 keeps finding these rabbits to pull out of its hat, but I give them credit in trying to hang around. Just when I think they're down to the last straw, They try something different.

 

http://www.bloomberg...ghtsquared.html

 

That is certainly a rabbit in a hat... I hope it works.

 

Sent from my SPH-D710 using Tapatalk

  • Like 1
Link to comment
Share on other sites

That is certainly a rabbit in a hat... I hope it works.

 

Sent from my SPH-D710 using Tapatalk

 

Yeah me too. Doesn't sound like Falcone is going to be giving up so easily..

Link to comment
Share on other sites

  • 4 weeks later...

I personally would like to see LightSquared get its network up and off the ground. I don't think it will happen anytime soon, if ever, but it is still a great idea and would provide more LTE options for the market as a whole.

  • Like 1
Link to comment
Share on other sites

What do you think if LightSquared partner up with Clearwire and become a major investor by putting several billions in Clearwire to pay off most of their debt and their major LTE Deployment which will also help and benefit Sprint, and Lightsquared can call it day without going through all the legal trouble they already been through?

Link to comment
Share on other sites

They just got 65 million back from 290 million they paid sprint upfront at the beginning of their deal.

 

Also I do not believe sprint would want them messing with Clearwire. I think Sprint is trying to keep Clear on a leash until it is ready to swallow them back in.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • T-Mobile has saved its 28Mhz mmWave licenses by using the point to point method to do environment monitoring inside its cabinets. The attachment below shows the antennas used: https://wireless2.fcc.gov/UlsApp/ApplicationSearch/applAdmin.jsp;JSESSIONID_APPSEARCH=LxvbnJuvusmIklPhKy6gVK7f9uwylrZ8LiNf3BqIKlDp3_5GxoBr!300973589!225089709?applID=14787154#   Here are the sites for Franklin county OH: https://wireless2.fcc.gov/UlsEntry/attachments/attachmentViewRD.jsp?applType=search&fileKey=66518254&attachmentKey=21989782&attachmentInd=applAttach
    • Yep, there is a label on the side of the box but it doesn't provide any useful info that the city doesn't already provide (Crown Castle Solutions is the franchisee). You can see my graphical interpretation of the city's dataset here.
    • T-Mobile UScellular agreement links from SEC filings: https://www.sec.gov/ix?doc=/Archives/edgar/data/821130/000110465924065665/tm2415626d2_8k.htm Look inside for main link. Credit mdav-dos1 on reddit
    • Totally agree.  In my county and surrounding counties, TM did not place n-41 on every site.  When I look at the sites in question, I probably would have not placed it there either.  I can find just a few with n-71 only and in most of those cases if you live there and know the probable usage of the residents, you would not do a full upgrade on those sites.  One site in particular is set up to force feed n-71 through a long tunnel on the Turnpike.  No stopping allowed in the tunnel. No stores, movie theaters, bathrooms, so n41 would be a waste.    n25 is not really needed either, so it is not there.  The tunnel is going through & under a mountain with more black bears than people.  TM was smart.  Get good coverage in the tunnel but do not waste many many thousands of dollars with extra unused spectrum. I also see sites with only n71 & n25.  Again this makes sense to me.  Depending on what county we are talking about, they moved much of their b25 from LTE to nr.  Some counties have more n25 than a neighboring county, but luckily, it is plenty everywhere.   When you are in a very rural area, n41 can run up the bills and then be barely used.  I am NOT finding sites that should have had n41 but TM failed to provide it.  They may have to come back later in a few years and upgrade the site to n41.  However, we just may eventually see the last little piece on Band 25 leave LTE and move to n25. I am not sure if the satellite to phone service is using band 25 G block as LTE or nr. We also can possibly have at least some AWS move from LTE to nr at some point.  Yes, everybody wants n41. it is not justified in some cases.  When I travel, I desire some decent service along the entire route but it does not have to be 1 or 2 gig download.   If I can get 50/5 on a speedtest with data that will flow and not stutter, I am very happy. Yes, they will swap out the USC gear.  TM needs to match their existing network. The USCC equipment did the job for years, but it is time to retire it.
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...