Jump to content

tybo31316

S4GRU Premier Sponsor
  • Posts

    2,081
  • Joined

  • Last visited

  • Days Won

    3

Posts posted by tybo31316

  1. You think they will come up with triband panels? 800,1900,2500

    I wonder if Sprint will reuse any equipment (mainly panels) from clearwire's current setup and move the equipment down to the sprint rack (on colocated towers) and install dual mode rru for TD LTE/WiMax installs. For cost savings on NV towers. Also will sprint build out more TD LTE to just more than the top 100 cities. Even if it is just a couple sites here and there in small towns?

  2. Correct if I'm wrong but I thought GMO sites are not capable of LTE 800 or CDMA 800

     

    quote name="tybo31316" post="172673" timestamp="1374458444"]

     

    Well all the nv towers deployed is capable of CDMA 800 and LTE 800. LTE 800 requires a trip to the base stations but CDMA 800 does not. It can be activated remotely it just requires 911 and interference testing. So it's only a matter of time before the LTE 800 is activated since the shut down of iden.

     

    You are correct I failed to mention that. I believe at some point sprint is going to turn a good bit of the GMO sites into full build sites where it makes sense.

     

    Also I think the storms are effecting the NV roll out in FL

     

  3. I was feeling the same way until i stumbled upon this site. Without Robert I would have paid my ETF and left. Then I saw NV visions potential on this site. All I can say is that if sprint isn't working for you then you have to go with what works for you. My service has gotten better on the north side by far. Only if sprint could activate CDMA 800 in Middleburg (where I work) I will be in heaven.

    • Like 1
  4. Do we know if 800SMR CDMA/LTE and 2.6ghz TD-LTE have started being deployed in Jax? I haven't seen anything that would indicate work has started on these two bands yet in the Jax area. I could be wrong and sincerely hope that I am!!!!! Because I haven't heard of work being started on them, I gave it a year timetable.

     

    BTW, if there is anything I can do to help the Jax Sprint 4GRU community, let me know. We own some great DSLR equipment with some very long lenses. I've been wanting to spend some time tower spotting in the area when I have time.

     

     

    Sent from my Sprint iPhone 5, not the old one (using Tapatalk 2).

    Well all the nv towers deployed is capable of CDMA 800 and LTE 800. LTE 800 requires a trip to the base stations but CDMA 800 does not. It can be activated remotely it just requires 911 and interference testing. So it's only a matter of time before the LTE 800 is activated since the shut down of iden.

  5. Something strange is going on. In the Ocala area Robert has 3 LTE towers that have been accepted this month and none of them are live. I have been to all 3 and can see that the new panels and ruus and fiber is present but I wonder why they are not on when normally they come on right away

    This usually happens to me in Jacksonville. The site is accepted then it takes days up to two Weeks for the signal to become active. I believe Robert spoke about this in a thread here before.

  6. Any word on when is completion almost here. Internet speed is horrible on 3g AT Atlantic and Kernan.

     

    I Think by the time sprint is done , especially with the 800, IT Will be behind again. Im seriously thinking tot changing service. I've Been with sprint for 12 years but speeds are worse thank metro pcs or straitalk...And they are unlimited too.

     

     

    Very, very disappointed how slow They are moving.

     

    I would have been better with sticking wish my old htc 4g wimax.....i just didnt think it was going to take sooooooo long....

    The work in that area may already be done but the site may not be accecpted. You may want to check out towers in the area to see if you recognize any nv work. Jacksonville has progressed a lot in the past six months. Iirc the whole market should be complete by years end.

×
×
  • Create New...