Jump to content

lilg740

S4GRU Premier Sponsor
  • Posts

    3,182
  • Joined

  • Last visited

  • Days Won

    1

Everything posted by lilg740

  1. Please see this thread. It will show you how to get the serving cell ID's there should be 3 per site as far as I know. http://s4gru.com/index.php?/topic/2198-network-visionlte-new-orleans-market/page__st__740__p__90231&do=findComment&comment=90231
  2. How do I get a list of all of the STL market sites in some sort of text format?
  3. I can add this information to the spreadsheet I have if someone goes out to the sites that are currently live and can take screenshots or jot down the LTE Engineering info. So far we have three sites that are up as far as we know. 270 and Lindbergh, Dellwood Rec, and Goodfellow and St. Louis Ave. If someone can get the Serving Cell ID's I can input the info into the spreadsheet.
  4. On a side note to this....pay the fee in store and then go home and complain to the chat reps and they will credit you back the fee....done this a few times when my 3VO had software issues....you just can't give up when they say no.... I have always seen this as a silly policy ever since coming over from AT&T. And for a while Sprint had the same policy but then they started the whole $35 repair fee under warranty. I refuse to buy any type of insurance plan on my phone because I take good care of my phones so I am not going to pay a monthly fee for each of my devices and THEN pay a deductible in the event of a loss....its a scam and the $35 fee is ridiculous if you ask me. But I still like Sprint because they have a cheaper plan and unlimited data....you can't get everything.....
  5. I think we are still waiting for someone to actually go down to the other site in Clayton...the one on top of that 10 story "200" building. Maybe its on....
  6. digiblur just put out an update and i think it is saying the dellwood site is active...can anyone confirm?
  7. I want to see the update for the "NV Sites Complete List" to see if there are any more in progress sites.
  8. I hope the tornado didn't take out the new site.....
  9. I know, but my post included locations that were learned from private information so I didn't want to break any rules....
  10. Any of you guys familiar with these sites? http://s4gru.com/index.php?/topic/530-network-vision-site-map-arkansas-kansas-missouri-oklahoma-markets/page__st__520
  11. Wow, I didn't notice that. I just though the points weren't on there yet. I'm gna go see if it recorded the points I got. Edit: I don't think it got my points because I connected all the way back at Washington/Elizabeth on 270. Edit2: From the signal strength it is pretty obvious that the connection is comig from 270 and Lindbergh
  12. I was just being a smartass lol...I know they will get them all done...but with my luck they won't touch Metro East until every single Missouri site is done. lol
  13. BTW I am making an Excel spreadsheet for all the reported connections, sightings, etc. Not much on it yet but I assume it will come together quickly.
  14. I am happy they have started the region but would have preferred if they would have hit the places that never got WiMax....
  15. Someone needs to get some pics of the site at 170/Berkley
  16. Your photo of the Rec Center one is def better than mine and the other guy's.... I just assumed that the connection on 170 was from the one at 270 and Lindbergh...considering the proximity of the 2 locations...My connection started at 270 and Washington/Elizabeth and I went down to Lindbergh/Pershall and back after Sensorly stopped working. That would be intriguing if there was a 3rd site
  17. I really think we should move our convos to the sponsor side missouri thread...but idk
  18. Am I breaking the rules posting Photos and such here?
  19. This the 270 and N Lindbergh, One of the 2 active LTE sites in St. Louis! This is the Dellwood Rec site...NV Panels up but no 4Gees....
  20. Same thing happened to me...I got about 150 points at about 5:45 and then Sensorly crashed and would no longer map the route. I waited for about 10 minutes under the tower at 270 and Lindbergh(near the old ford plant) and it never came back. I have pics and I can pretty much confirm that this site is the active one. The tower at Dellwood Rec Center has Panels up but no connection. I managed to get a speed test while on 270 and I got 14down and 6up. Under the tower I only got 2.5 down and 1up. Weird. I forgot how to get into the engineering screen so i dont have screenshots of that.
  21. Looks like things are popping up rather nice here in the Lou...I just wish the wouldve started on the East Side....
  22. Do we know which site this is coming from yet in the 170/Hanley area?
×
×
  • Create New...