-
Posts
337 -
Joined
-
Last visited
Content Type
Profiles
Blogs
Articles
Media Demo
Gallery
Downloads
Events
Forums
Everything posted by RSC405
-
So I am eligible for an upgrade on March 1st. Rumor is subsidies will go away sometime in the near future. I was looking forward to the new HTC. would not buy it at retail price. So looks like a have a small window for the subsidies option. If I buy a Nexus 5 from Google. How do I get a sim card? What are they running?
-
Thank you Robert. I knew I did not have the whole picture. I did not know sprint had the option to upgrade the WiMAX site. I hope they do. I think that they need one more site here if they want to keep good speeds in the future. We are outside the IBEZ. So I hope the 800 comes with or shortly after LTE. Will they need more hardware upgrades to do that?
-
If Alamogordo only has one tower, will fiber and LTE be any good? Won't the pipe just fill up with all of the bandwidth hogs? I can get pings below or around 100 and downloads close to 2mb. Peek hours pings go up to 150-200 with downloads drop to 130kbp. I am wondering how much better it is going to be with only one Tower that will be 3G/4G?
-
They pulled the legacy cabinets about two weeks ago down here. Contractor told me they still need back haul and the AAV installed. Do not know what AAV stands for. I was hopeful f the back haul was close when CL marked all their lines near the tower (about 100 yards away) then remarked them about a month ago. Nothing has been done since.
-
So I got this text message from sprint SprintFreeMsg: Over the next month, the new network will be largely completed in your area. See new phone offer at http://sprint.us/upgrade1 Reply S to stop. Now what am I to believe? I sure do not think there will by any LTE in Alamogordo, or even Las Cruces either.
-
You know he was talking about alarms with dates of November 2013. So I know the tech was working off old items. Not sure what the field manager was looking at. What does the AAV look like. At least when I see that I. I know they will be getting closer. Also hoping that once Albq. Gets lit up the rest of the state will fall in quick. I was figuring that Roswell and Hobbs would come online soon after Clovis since they are platou wireless also. That does not seem to be the case. Just kind of bummed that we are the land of mañana. Not blaming sprint just wish they had a bigger fire to lite under some *****.
-
Sure wish our NV upgrade had shown improvements, off peek use to get over 1M download and peek would get around 200kb. Now can't even get a good data connection durning peek times. Hope it gets fixed soon. They guy who did the intergration said the fiber box has not been installed yet. So let's hope that is not far behind.