  1. Here is the engineering screen for the Mitchell site near I-270 & Old Alton Rd. I mapped about 345 points. I remember seeing that the site on Gateway hospital in Granite has been accepted. I have not been able to connect to it at all. Seems like it might be a red stick or in donut mode.
  2. The site near 170 & Woodson Rd, at the FedEx center, had crews up on the tower on Monday. AMF has been at the site at 70 & Lucas & Hunt the past 2 days, with ropes hanging from the tower.
  3. Just drove past the Coldwell Banker site at 270 & Dorsett, saw guys up on the roof putting up antenna panels and RRUs.
  4. AMF on site at the flag pole site near McDonnell Blvd & 270
  5. Picked up Broadway & Angelica (McKinley Bridge) yesterday.
  6. That East St. Louis one is weird, I was only in the area by Lindbergh & I-64 & Manchester at that time of day.
  7. I pulled these LTE Engineering screens Friday while at the intersection of Lindbergh & Manchester and while near Lindbergh & I-64. I pulled the 05608B02 at the exact location of the pushpin on the Google Earth capture that is attached. I can't find either of the SCIDs on the spreadsheet.
  8. Here is I-70 & West Florissant LTE Engineering screen. Grabbed this last Thursday.
  9. Awesome, I saw that as I drove by this morning. didn't see your post until I got to the office.
  10. I noticed this morning that the I-270 and Old Alton Rd (Thorngate) site had a different look to the rack this morning. Before the rack was just a single "level" now it looked like they had added another level to above the old rack.
  11. Pulled these 2 while at 70 & Salisbury and going across the McKinley. I went through my other screen shots, one looks like it it John & McKissock, the other I hadn't seen before.
  12. Do you work at the office building by Lion's Choice? I saw an AMF truck in that parking lot the other day when I was at Lion's Choice for lunch. If that's the building, it looks like panels and RRUs are up, you can see one from Lion's Choice.
  13. Saw crews on site at the Pontoon Rd site this afternoon.
  14. Got this this morning 270 & St Charles Rock Rd. Looks like Bridgeton City Hall.
  15. Speaking of the Clearwire rollout, I noticed while I was the Roxy's site the there was a Clearwire cabinet there, but it looked like the Clearwire antennas have been taken down. There was a small rack under the sprint rack, basically just pipes that were only a couple feet off the face of the pole, that rack had some microwave antennas on it and it looked like it may have previously had the Clearwire WiMax antennas too. Those were the only 2 racks on the site.
  16. Sorry, the parking lot was empty with the exception of a semi accross the street. You wouldn't have gotten any from me anyway. I have never been in on of those clubs. Going to bed now, i have been up since 6:30 yesterday morning.
  17. Roxy's is live. Mapped about 150 or so points all the way to Madison site. Here is the LTE engineering screen.
  18. The one in Granite on the Rock Rd is bigger, and there is a tower near this one but closer to the river that looks to be a couple hundred feet tall with only one rack on it. I'll try to get s pick of it just because.
  19. Here are a couple pictures of the site at Broadway & Angelica (near McKinley Bridge). Panels, RRUs, and cabinets installed. I did not see any evidence of new fiber being ran, however.
  20. Here are a couple pictures of the tower at John & McKissock(sp?) (I-70 & Grand). NV panned & RRUs are up, I couldn't get up close to the site to check for cabinets. Pictures taken with my phone.
  21. I noticed last night on my way home that it looks like the sites near I-70 & the McKinley Bridge and I-70 and Grand both have NV panels up. I'll try to get pics either tonight or tomorrow.
×
×