Philadelphia & Southern Connecticut are scheduled to be in the Second Round of Sprint Network Vision/LTE Deployment in 2012 in The Wall A group blog by The Wall Editors in General Posted June 21, 2012 Any idea if NV has started yet in Philadelphia Metro, I've been seeing wild speeds both positive and negative and am wondering if they have begun upgrading sites. I've seen speeds as slow as 10kbps on EvDo and up to 2 Mbps
Philadelphia & Southern Connecticut are scheduled to be in the Second Round of Sprint Network Vision/LTE Deployment in 2012
in The Wall
A group blog by The Wall Editors in General
Posted
Any idea if NV has started yet in Philadelphia Metro, I've been seeing wild speeds both positive and negative and am wondering if they have begun upgrading sites. I've seen speeds as slow as 10kbps on EvDo and up to 2 Mbps