Jump to content

apphysics

S4GRU Member
  • Posts

    69
  • Joined

  • Last visited

Everything posted by apphysics

  1. No, but 41 is the preferred band, followed by 25 and then 26. In my experience it switches from 41 to 25 at 1-2 bars when on the same tower (depending on where I am in my house).
  2. Yea, I have found B41 to be a little touchy. I have an iPhone 6+ and I see 30+ down and 15+ up consistently when I am on 41.
  3. I get B41 on the north side quite a bit. Not sure if its just where I am or what...
  4. If you're talking Eagle River I was there in January and was on 1x the entire time. You would think with as many people that go there and to Rhinelander (by hodag grounds and the scout camps easily 20k+ people in a summer that could all be serviced by a single tower location [granted high capacity]) they would have all their own LTE towers but noooo... Extended 1x.
  5. I have a 5S and I am never on 3g except for a few areas where the towers aren't complete. I have LTE everywhere else and pull 20+ megs down and 8+ up. I have never had no service (even in basements that I never thought there would be any chance of service I had service). EDIT: Added the quote.
  6. Just an update, the Brown Deer/I-43 tower is now broadcasting B26. Where I hardly had service before, I know have 2 bars of LTE.
  7. One thing I have noticed too, is that 1900 3g penetration has gotten better too. Where I once had 2 bars, I now have 4 bars. I knew they said the new equipment was better, but I didn't think it would be that much better.
  8. I have an iPhone. Is it possible for me to change band priority?
  9. Thanks Robert! And... Band 25 is 1900 and Band 26 is 800? And then the 2600 is Band...41 if I remember?
  10. I heard someone say that ALL Samsung work (1x800/800LTE/1900LTE/19003G) is supposed to be completed by march. Is this accurate. That means 800 LTE will be here within a few months then?
  11. So then whats the difference between 1x800 and 1x800SMR? Are they the same thing or is there an actual difference? Thanks!
  12. Just out of curiosity, when I look at the acceptance report from the weekend and see 33 accepted with 3 LTE and 17 CDMA800, that means the remaining 13 are 1x800, right? And the CDMA800 are 800 MHz 3g? I know the LTE would be specified 800, so the ones for now are just in the PCS band.
  13. Considering the amount of acceptances we are seeing it doesn't surprise me. I would actually consider that to be a good thing because of all the progress being made. Slightly frustrating I'm sure, but IT'S COMING!!!!
  14. When 800MHz comes your problems will be solved (a gain of normally 2+ bars) [i went from no service to 4 bars when my tower got 800].
  15. Just hang in there. Once 800 MHz LTE is launched (should be by Jan/Feb I think I read for Samsung completion) coverage will drastically improve. In my new house I used to have no service and had to get an Airave, but now that 1x800 has been launched I have 4 bars. LTE will be much the same when 800MHz goes live.
  16. This was covered like two pages ago. Some low density towers, such as this one can be 3g complete by only upgrading the ground equipment. I believe they call it GMO (Ground Mount Option)? In this case, they can be 3g complete, and the remainder of the upgrades (1x800, 3g 800, and LTE 1900 and 800) will come at a later time.
  17. Also, your 4s cannot use 800MHz anything, so you won't have the performance gains from that. Most of my family is in the same boat, but 2 are getting upgraded this year, and the third will get upgraded next year (so contracts are offset and I can always have the newest iPhone )
  18. I've been all over the north shore of Milwaukee tonight, and I have had LTE everywhere I go!!!!!! IT'S COMING!!!!!!!!!!!!!!
  19. So question. I am in River Hills, and in the Field Test screen on my 5s I am on "Secondary 800 MHz Band." I am connected to sprint service. Does this mean that I am finally on 1x800?!?!?!? SID - 22418 NID - 224 Base ID - 58929 I hope this is 1x800!!!
  20. Ok, so I have been on roaming all night. Hopefully it is a sign that big things will start happening tomorrow in Milwaukee.
  21. I just realized, in that screenshot it says I'm on extended. But I was most certainly on sprint 800 tonight... At any rate though, things are coming along
  22. Good news for Milwaukee people!! I went to Marcus North shore tonight and was bouncing in and out of 1x800 the whole time. THEY ARE TESTING HERE!!!!!! I have a screenshot posted with all the tower information (i think?) Can someone please confirm if this was the tower right next to the theater, or the next one farther south (or if I'm just completely wrong, and which tower it was pulling from).
  23. Also, LTE is HIGHLY signal dependent, so having only 1 bar would also drastically lower the speeds you would get.
  24. I assume this means they are accepted? Do they permanently go live after being accepted?
  25. Sorry, I should have clarified. It's the last tower I'm aware of in the North Shore area that hasn't been completed. Plus Delafield is a little ways out of the city when you actually look at it. On Google maps you can see that the major areas are from Cedarburg south to Franklin, and from the Lake out to Waukesha. So sorry to say, but you're a little ways out from the major city limits and may not see upgrades until the areas closer to Milwaukee are completed.
×
×
  • Create New...