Jump to content

Current & Coming Soon Sprint Communities - LTE Status


Dkoellerwx

Recommended Posts

Posted in the 'In Progress' thread, but the site in Chenoa IL had new panels being hoisted up last week,and the tower just north of Forrest IL now has the new Samsung NV cabinets on it.

 

 

Although my phone grabs the Forrest IL tower 100% of the time, I think I am even more excited about Bloomington getting the upgrades.  It is still absolutely terrible down there.

 

The hard part is going to be seeing all of the new equipment, but having them not light up 4G or 800mhz for who knows how long.  :(

Link to comment
Share on other sites

Not the best picture, but shows the new panels and the three rrus on the rooftop location in Tyler tx. Should be the tower on independence and 69 . All of the cables connected from what I could see. They are waiting on the fcc to give them the OK to turn on the lte at the site/sites. But I have confirmation that Tyler, Tx has the equipment up on some towers. And they are going site to site doing build outs. I will be monitoring the sites when I can to see if any LTE signals are broadcast

2013-06-18 17.07.451.png

  • Like 1
Link to comment
Share on other sites

Not the best picture, but shows the new panels and the three rrus on the rooftop location in Tyler tx. Should be the tower on independence and 69 . All of the cables connected from what I could see. They are waiting on the fcc to give them the OK to turn on the lte at the site/sites. But I have confirmation that Tyler, Tx has the equipment up on some towers. And they are going site to site doing build outs. I will be monitoring the sites when I can to see if any LTE signals are broadcast

Great picture. Thanks for sharing. However, they do not need FCC authorization. They have authorization to broadcast in all their existing licenses.

 

Robert from Note 2 using Tapatalk 4 Beta

 

 

Link to comment
Share on other sites

Great picture. Thanks for sharing. However, they do not need FCC authorization. They have authorization to broadcast in all their existing licenses.

 

Robert from Note 2 using Tapatalk 4 Beta

Oh well I thought that they needed them to check out to make sure it will not interfere with anything? So is it normal for sprint to not announce cities they are working on? Tyler has yet to be announced, but have the equipment ready, but not turned on?

Link to comment
Share on other sites

 

 

Great picture. Thanks for sharing. However, they do not need FCC authorization. They have authorization to broadcast in all their existing licenses.

 

 

Robert from Note 2 using Tapatalk 4 Beta

 

 

Oh well I thought that they needed them to check out to make sure it will not interfere with anything? So is it normal for sprint to not announce cities they are working on? Tyler has yet to be announced, but have the equipment ready, but not turned on?

Correct they already have the licenses and the announcing is only required by their PR group to get and keep customers. Sprint is working all over the place.

Link to comment
Share on other sites

Correct they already have the licenses and the announcing is only required by their PR group to get and keep customers. Sprint is working all over the place.

Oh OK that makes sense. Yeah I knew they were working, just wasn't sure why they weren't making it known which cities they were doing the major upgrades at. I wish I could access the LTE only setting on the stock S4. That way I could drive around without having to keep using the airplane mode on/off feature. I will keep up with updates, and other towers finished when I see them. 

  • Like 1
Link to comment
Share on other sites

Oh well I thought that they needed them to check out to make sure it will not interfere with anything? So is it normal for sprint to not announce cities they are working on? Tyler has yet to be announced, but have the equipment ready, but not turned on?

 

They turn on each site as they are complete and pass inspection from Sprint.  If they have not been accepted, they are not complete.  ;)

 

Additionally, Sprint has lots of markets with live LTE coverage that have never been announced.  There is just no rhyme or reason with their PR folks.

 

Robert

  • Like 2
Link to comment
Share on other sites

Working an update on the map right now. Updates so far:

 

Communities Officially Launched on June 17, 2013 (Blue Pins): 30

  • Napa, Calif.
  • Clearwater, Fla
  • Gainesville, Fla.
  • Kendall, Fla.
  • Miami Beach, Fla.
  • Miami, Fla.
  • Palatka, Fla.
  • Sebring, Fla.
  • St. Petersburg, Fla.
  • Tampa, Fla.
  • Dalton, Ga.
  • Warsaw, Ind.
  • Baton Rouge, La.
  • New Orleans, La.
  • Benton Harbor, Mich.
  • East Lansing, Mich.
  • Lansing, Mich.
  • St. Joseph, Mich.
  • St. Cloud, Minn.
  • Cary, N.C.
  • Dunn, N.C.
  • Henderson, N.C.
  • Raleigh, N.C.
  • Bristol, Tenn.
  • Clarksville, Tenn.
  • Kingsport, Tenn.
  • Corsicana, Texas
  • Centralia, Wash.
  • Longview, Wash.
  • Fond du Lac, Wis.

Communities now listed as Coming Soon (Red Pins): 15

  • Allegan, Mich.
  • Ann Arbor, Mich.
  • Battle Creek, Mich.
  • Flint, Mich.
  • Grand Rapids, Mich.
  • Mount Pleasant, Mich.
  • Corpus Christi, Texas
  • Eagle Pass, Texas
  • Laredo, Texas
  • Aberdeen, Wash.
  • Oak Harbor, Wash.
  • Fort Atkinson, Wis.
  • Marshfield, Wis.
  • Watertown, Wis.
  • Wisconsin Rapids, Wis.

Communities now listed as Pre-Launch (Green Pins): 9

  • Ann Arbor, Mich.
  • Battle Creek, Mich.
  • Flint, Mich.
  • Grand Rapids, Mich.
  • Mount Pleasant, Mich.
  • Corpus Christi, Texas
  • Eagle Pass, Texas
  • Laredo, Texas
  • Aberdeen, Wash.
  • Like 4
Link to comment
Share on other sites

Just passed by the tower right outside of Morton illinois and they were working on the tower they had a trailer full of equipment. Tested the download speeds on the tower was getting abot 2.5 Mbs-3.5Mbs. I was pretty shocked. for most of the people still waiting on network vision you have something great to look foward to. i wish it was being turned on with lte but for now i will take those speeds.  :)

Link to comment
Share on other sites

No more ca cities?

Announcements don't matter. Right now, Sprint is deploying full build sites in every California market except North LA and Lower Central Valley. These two will begin this Summer.

 

Robert from Note 2 using Tapatalk 4 Beta

 

 

Link to comment
Share on other sites

No more ca cities?

 

Announcements don't matter. Right now, Sprint is deploying full build sites in every California market except North LA and Lower Central Valley. These two will begin this Summer.

 

 

 

Robert from Note 2 using Tapatalk 4 Beta

 

 

 

 

Well, here's to hoping I find the first documented full build site being worked on in the Lower Central Valley with the one in Visalia that has its permit issued already. :) Oh wait! Electrical work counts right? If that's the case, I'll try to get pics this afternoon!

 

 

Sent from Josh's iPhone 5 using Tapatalk 2

Link to comment
Share on other sites

I saw someone climbing the Sprint tower in Pleasant Plains, IL today. Looking at the old iDEN tower in Ashland it appears that new panels have been installed. I also noticed a 22XXX SID today on my phone on IL103. That would have to be either coming from the Frederick II tower or the Beardstown tower. Frederick II is nickname that iPCS gave to that particular tower.

Link to comment
Share on other sites

Think all their focused on now is ditching iden by months end. Springfield has been up and down on 800. But the data speeds and signal quality has noticeably improved. Call quality is still up in the air as is dropped calls. The wife's iPhone seems to not run well where my s3 is fine.

Link to comment
Share on other sites

Think all their focused on now is ditching iden by months end. Springfield has been up and down on 800. But the data speeds and signal quality has noticeably improved. Call quality is still up in the air as is dropped calls. The wife's iPhone seems to not run well where my s3 is fine.

Those working on NV are not the same in charge of shutting iDEN down. It sounds like all that is going to be done is the switches and equipment will be shut off remotely. Then over the next few months they will be hauling the equipment to the recyclers. As for quality I ran into a dead spot yesterday right next to a Sprint tower. The network will be in flux until they are completely done in town. 

Link to comment
Share on other sites

I think I found an iDEN only site having RRUs installed today. The antennas are already on the tower. I don't remember seeing this tower on any map for conversion/NV. The tower is near Camp Point, IL.

Edited by userkv8031
Link to comment
Share on other sites

From other threads on this forum I was under the impression that 800 would be up before they cut iden?

There will not be many places that see 800 go live before iDEN is turned off on June 30. That is the final cutoff date for iDEN. On that date they will be shutting down switches in rapid succession. I guess they have a kill button on a computer in Oklahoma City (Network Operations still there?) to shut the whole network down in a matter of a few hours.

Link to comment
Share on other sites

Update!

 

Of note, several Arkansas, Alabama, Mississippi, South Texas, Wisconsin and Washington updates.

 

Communities now marked as Pre-Launch (Green Pins):

  • Fort Smith, AR
  • Little Rock, AR
  • Bridgeport, CT
  • Stamford, CT
  • Marco Island, FL
  • Allegan, MI
  • Marshfield, MI
  • Mount Pleasant, MI
  • Wisconsin Rapids, MI
  • Columbus, MS
  • Hattiesburg, MS
  • Tupelo, MS
  • Kinston, NC
  • North Wilkesboro, NC
  • Roanoke Rapis, NC
  • Wilson, NC
  • Brownsville, TX
  • Eagle Pass, TX
  • Edinburg, TX
  • El Paso, TX
  • McAllen, TX
  • Mission, TX
  • Nacogdoches, TX
  • Paris, TX
  • Oak Harbor, WA

 

Communities where LTE is now available in spots (Yellow Pins):

  • Mobile, AL
  • Montgomery, AL
  • Indio, CA
  • Palm Springs, CA
  • Roseville, CA
  • Cadillac, MI
  • Grenada, MS
  • Holly Springs, MS
  • Stafford Township, NJ
  • Carrizo Springs, TX
  • Lufkin, TX
  • Richmond, VA
  • Astoria, WA
  • Medford, WA
  • Redmond, WA
  • Seaside, WA
  • Janesville, WI
  • Manitowoc, WI
  • Milwaukee, WI
  • Sheboygan, WI
  • Wausau, WI
  • Like 5
Link to comment
Share on other sites

 Possibly waiting and going to light up all of the current towers at the same time?

 

Unlikely. Sprint is activating every tower as soon as it's ready. Once everything is hooked up, the each tower will be activated. Unless all the towers are on the same fiber ring that isn't running yet, I doubt they will all fire up at once.

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • large.unreadcontent.png.6ef00db54e758d06

  • gallery_1_23_9202.png

  • Posts

    • Since this is kind of the general chat thread, I have to share this humorous story (at least it is to me): Since around February/March of this year, my S22U has been an absolute pain to charge. USB-C cables would immediately fall out and it progressively got worse and worse until it often took me a number of minutes to get the angle of the cable juuuussst right to get charging to occur at all (not exaggerating). The connection was so weak that even walking heavily could cause the cable to disconnect. I tried cleaning out the port with a stable, a paperclip, etc. Some dust/lint/dirt came out but the connection didn't improve one bit. Needless to say, this was a MONSTER headache and had me hating this phone. I just didn't have the finances right now for a replacement.  Which brings us to the night before last. I am angry as hell because I had spent five minutes trying to get this phone to charge and failed. I am looking in the port and I notice it doesn't look right. The walls look rough and, using a staple, the back and walls feel REALLY rough and very hard. I get some lint/dust out with the staple and it improves charging in the sense I can get it to charge but it doesn't remove any of the hard stuff. It's late and it's charging, so that's enough for now. I decide it's time to see if that hard stuff is part of the connector or not. More aggressive methods are needed! I work in a biochem lab and we have a lot of different sizes of disposable needles available. So, yesterday morning, while in the lab I grab a few different sizes of needles between 26AWG and 31 AWG. When I got home, I got to work and start probing the connector with the 26 AWG and 31 AWG needle. The stuff feels extremely hard, almost like it was part of the connector, but a bit does break off. Under examination of the bit, it's almost sandy with dust/lint embedded in it. It's not part of the connector but instead some sort of rock-hard crap! That's when I remember that I had done some rock hounding at the end of last year and in January. This involved lots of digging in very sandy/dusty soils; soils which bare more than a passing resemblance to the crap in the connector. We have our answer, this debris is basically compacted/cemented rock dust. Over time, moisture in the area combined with the compression from inserting the USB-C connector had turned it into cement. I start going nuts chiseling away at it with the 26 AWG needle. After about 5-10 minutes of constant chiseling and scraping with the 26AWG and 31AWG needles, I see the first signs of metal at the back of the connector. So it is metal around the outsides! Another 5 minutes of work and I have scraped away pretty much all of the crap in the connector. A few finishing passes with the 31AWG needle, a blast of compressed air, and it is time to see if this helped any. I plug my regular USB-C cable and holy crap it clicks into place; it hasn't done that since February! I pick up the phone and the cable has actually latched! The connector works pretty much like it did over a year ago, it's almost like having a brand new phone!
    • That's odd, they are usually almost lock step with TMO. I forgot to mention this also includes the September Security Update.
    • 417.55 MB September security update just downloaded here for S24+ unlocked   Edit:  after Sept security update install, checked and found a 13MB GP System update as well.  Still showing August 1st there however. 
    • T-Mobile is selling the rest of the 3.45GHz spectrum to Columbia Capital.  
    • Still nothing for my AT&T and Visible phones.
  • Recently Browsing

    • No registered users viewing this page.
×
×
  • Create New...