mr.phoneguy Posted March 20, 2013 Share Posted March 20, 2013 I agree. A picture of what their antennas look like or what to look for would be very helpful. PICTURES. I'll take some pictures of the tower as soon as I get the chance to get out there. Quote Link to comment Share on other sites More sharing options...
Calvin200 Posted March 20, 2013 Share Posted March 20, 2013 I'll take some pictures of the tower as soon as I get the chance to get out there. I meant pictures of an tower that is complete. I want to be able to know how to spot them. Sprint geniuses where are you? Quote Link to comment Share on other sites More sharing options...
DaddyWntsATaste Posted March 21, 2013 Share Posted March 21, 2013 I have all the insight on which city is getting done. Wausua is done, Union Grove should be done, Kenosha/Racine next and....today is River Hills,WI 1 Quote Link to comment Share on other sites More sharing options...
mr.phoneguy Posted March 21, 2013 Share Posted March 21, 2013 I have all the insight on which city is getting done. Wausua is done, Union Grove should be done, Kenosha/Racine next and....today is River Hills,WI How do you know this? When will Milwaukee/Madison be on the radar? 2 Quote Link to comment Share on other sites More sharing options...
nophix Posted March 21, 2013 Share Posted March 21, 2013 I have all the insight on which city is getting done. Wausua is done, Union Grove should be done, Kenosha/Racine next and....today is River Hills,WI So are they just waiting for back haul to light up? I'm in Wausau all the time and haven't seen it on my Evo or Gnex. Sent from my Galaxy Nexus using Tapatalk 2 Quote Link to comment Share on other sites More sharing options...
snowmobiler487 Posted March 21, 2013 Share Posted March 21, 2013 I have all the insight on which city is getting done. Wausua is done, Union Grove should be done, Kenosha/Racine next and....today is River Hills,WI I did drive past the one and only site that actually sits in River Hills today and saw numerous people at the base of the tower. Quote Link to comment Share on other sites More sharing options...
n9ovreric Posted March 22, 2013 Share Posted March 22, 2013 So are they just waiting for back haul to light up? I'm in Wausau all the time and haven't seen it on my Evo or Gnex. Sent from my Galaxy Nexus using Tapatalk 2 Just what I'm thinking, I live in Wausau and still nothing here, I went by one site and the backhaul is ready at that site. Wonder what they are waiting on.. Spring? Wonder where everyone seems to be getting the wrong info from. Quote Link to comment Share on other sites More sharing options...
DaddyWntsATaste Posted March 22, 2013 Share Posted March 22, 2013 I did drive past the one and only site that actually sits in River Hills today and saw numerous people at the base of the tower. See told you. Just what I'm thinking, I live in Wausau and still nothing here, I went by one site and the backhaul is ready at that site. Wonder what they are waiting on.. Spring? Wonder where everyone seems to be getting the wrong info from. I know its all done, now its up to Sprint on when to turn it on. Who knows, maybe they have some sort of switch or something. Quote Link to comment Share on other sites More sharing options...
dequardo Posted March 22, 2013 Share Posted March 22, 2013 Again guys, and ladies...I really do appreciate this info but how to separate noise from (LTE) fact? How do we know this work scattered throughout WI isn't (just) 3G upgrades (capacity and speed) vs. LTE upgrades? Quote Link to comment Share on other sites More sharing options...
DaddyWntsATaste Posted March 22, 2013 Share Posted March 22, 2013 Again guys, and ladies...I really do appreciate this info but how to separate noise from (LTE) fact? How do we know this work scattered throughout WI isn't (just) 3G upgrades (capacity and speed) vs. LTE upgrades? Because i work for the company doing the installs. LOL Quote Link to comment Share on other sites More sharing options...
dequardo Posted March 22, 2013 Share Posted March 22, 2013 Well this IS the internet but that's a good answer. Ha. Quote Link to comment Share on other sites More sharing options...
snowmobiler487 Posted March 22, 2013 Share Posted March 22, 2013 Because i work for the company doing the installs. LOL Do you have any other info that you are able to share about what the schedule looks like in Milwaukee in the near future? Quote Link to comment Share on other sites More sharing options...
S4GRU Posted March 22, 2013 Share Posted March 22, 2013 There are no sites in Wausau, Madison, Kenosha, Racine, Milwaukee or Waukesha that have been accepted complete yet by Sprint. Although work has started, LTE is not imminent. There have only been two sites accepted in Wisconsin markets...one in Irma (which is a GMO) and one in Sheboygan (full build). There are dozens of sites worked on or being worked on. And there have been many GMO sites worked on, especially. And as each site is inspected, given a correction list, the correction list gets fixed and reinspection occurs and is accepted, these sites will go live. It's not as if they are done and sitting there, just waiting for a switch to be flipped. Robert via Nexus 7 with Tapatalk HD Quote Link to comment Share on other sites More sharing options...
mr.phoneguy Posted March 22, 2013 Share Posted March 22, 2013 There are no sites in Wausau, Madison, Kenosha, Racine, Milwaukee or Waukesha that have been accepted complete yet by Sprint. Although work has started, LTE is not imminent. There have only been two sites accepted in Wisconsin markets...one in Irma (which is a GMO) and one in Sheboygan (full build). There are dozens of sites worked on or being worked on. And there have been many GMO sites worked on, especially. And as each site is inspected, given a correction list, the correction list gets fixed and reinspection occurs and is accepted, these sites will go live. It's not as if they are done and sitting there, just waiting for a switch to be flipped. Robert via Nexus 7 with Tapatalk HD Are you saying backhaul or whatever kind of work to the madison/milwaukee sites have most likely started? Quote Link to comment Share on other sites More sharing options...
S4GRU Posted March 22, 2013 Share Posted March 22, 2013 Are you saying backhaul or whatever kind of work to the madison/milwaukee sites have most likely started? I was referring to actual site equipment installation in my post. But yes, backhaul is underway too. Robert via Nexus 7 with Tapatalk HD Quote Link to comment Share on other sites More sharing options...
mr.phoneguy Posted March 22, 2013 Share Posted March 22, 2013 Cool, thanks for the update. Your a good guy for answering all of our questions ect. Quote Link to comment Share on other sites More sharing options...
nophix Posted March 23, 2013 Share Posted March 23, 2013 Im guessing part of the work to be completed is backhaul. They were ramping up for some massive fiber pulls, and all I can get from recieving guys is its for cell towers. No specific carriers were mentioned. I can't badger the guys too much. They get enough from local citizens. Either way it seems Sprint will finish LTE before AT&T even rolls out 3g outside Wausau. Sent from my SPH-L710 using Tapatalk 2 Quote Link to comment Share on other sites More sharing options...
DaddyWntsATaste Posted March 25, 2013 Share Posted March 25, 2013 There are no sites in Wausau, Madison, Kenosha, Racine, Milwaukee or Waukesha that have been accepted complete yet by Sprint. Although work has started, LTE is not imminent. There have only been two sites accepted in Wisconsin markets...one in Irma (which is a GMO) and one in Sheboygan (full build). There are dozens of sites worked on or being worked on. And there have been many GMO sites worked on, especially. And as each site is inspected, given a correction list, the correction list gets fixed and reinspection occurs and is accepted, these sites will go live. It's not as if they are done and sitting there, just waiting for a switch to be flipped. Robert via Nexus 7 with Tapatalk HD Im not trying to be a d*ck or anything but according to who??? I literally know which jobs will start and when. I know what company is subcontracting us to do these jobs. I know when these jobs are complete. I know which materials is being used for each job. And who did you say you worked for again? Do i believe the work is done? Yes. Do i believe there is swtich? Not necessarily, but sprint does have power to turn on/off. Im starting to imagine three guys trying to pull a lever with a massive pipe wrench. LOL Quote Link to comment Share on other sites More sharing options...
S4GRU Posted March 25, 2013 Share Posted March 25, 2013 Im not trying to be a d*ck or anything but according to who??? I literally know which jobs will start and when. I know what company is subcontracting us to do these jobs. I know when these jobs are complete. I know which materials is being used for each job. And who did you say you worked for again? Do i believe the work is done? Yes. Do i believe there is swtich? Not necessarily, but sprint does have power to turn on/off. Im starting to imagine three guys trying to pull a lever with a massive pipe wrench. LOL We receive reports from sources within Sprint when sites are inspected and accepted as complete. So it's according to Sprint. In our Sponsors section we have maps that show every accepted site in the country. To date, no sites have been accepted in the Milwaukee market. Only two have been accepted in the North Wisconsin market. There have been quite a few accepted in the Wisconsin portion of the Minnesota market. Robert via Nexus 7 with Tapatalk HD 2 Quote Link to comment Share on other sites More sharing options...
snowmobiler487 Posted March 25, 2013 Share Posted March 25, 2013 I understand the difference between equipment being installed and sprint accepting a site as complete, I have simply been interested in hearing where equipment has been installed to gain an understanding of where LTE is even possible at this point in the Milwaukee area. 1 Quote Link to comment Share on other sites More sharing options...
theg00ds0n Posted March 28, 2013 Share Posted March 28, 2013 We just had new fiber circuit pulled into my office and it took AT&T no less than 5 months to finish from the date the contract was signed. The actual work only took about a month, but that it was a several mile pull. Probably lots of that going on, and I'm sure this crappy spring hasn't helped either... Quote Link to comment Share on other sites More sharing options...
Rasta Cheesehead Posted March 29, 2013 Share Posted March 29, 2013 There are no sites in Wausau, Madison, Kenosha, Racine, Milwaukee or Waukesha that have been accepted complete yet by Sprint. Although work has started, LTE is not imminent. There have only been two sites accepted in Wisconsin markets...one in Irma (which is a GMO) and one in Sheboygan (full build). There are dozens of sites worked on or being worked on. And there have been many GMO sites worked on, especially. And as each site is inspected, given a correction list, the correction list gets fixed and reinspection occurs and is accepted, these sites will go live. It's not as if they are done and sitting there, just waiting for a switch to be flipped. Robert via Nexus 7 with Tapatalk HD I thought Sprint Launched La Cross, WI or is this market consider some where in MN Quote Link to comment Share on other sites More sharing options...
Mooeydj Posted March 29, 2013 Share Posted March 29, 2013 I thought Sprint Launched La Cross, WI or is this market consider some where in MN Yup, it is in the MN market. Eau Claire area too. Quote Link to comment Share on other sites More sharing options...
S4GRU Posted March 29, 2013 Share Posted March 29, 2013 I thought Sprint Launched La Cross, WI or is this market consider some where in MN Yes, LaCrosse and Eau Claire are in the Minnesota market. Robert via Samsung Note II via Tapatalk Quote Link to comment Share on other sites More sharing options...
Calvin200 Posted April 1, 2013 Share Posted April 1, 2013 This is site "Ml17xc186E" It is on Waterford between 6th and 13th St. This is a Sprint only tower. This is the second time I have seen a tower being connected to a telephone line underground (the other one was on the tower on 43rd and Loomis Rd basically by the north bound Loomis Road exit). Where in the process of updating a tower would work like this be done? Quote Link to comment Share on other sites More sharing options...